Annexure A FORM 1 [See Regulation 3J ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 12.07.2023 To, MIs. Vikas Constructions [Prop. Mr. Vikas Sudarshan Yadav]having its Registered Office at Flat No.3, Plot No. 31, Sai Sankul Apartment, Vishal Nagar, Garkheda, Aurangabad - 431001. Subject: Certificate of Percentage of Completion of Construction Work of "SAI SHREE APARTMENT"having MahaRERA Registration Number P51500045722being Developed by MIs. Vikas Constructions [Prop. Mr. Vikas Sudarshan Yadav]. Sir, I / We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of "SAI SHREE APARTMENT" having MahaRERA Registration Number P51500045722being Developed by MIs. Vikas Constructions [Prop. Mr. Vikas Sudarshan Yadav] Based on the Site Inspection, with respect to the Layout / each BuildinglWing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildinglWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number _ (to be prepared separately for each LayoutlBuildinglWing of Project) S. Tasks I Activity Percentage of Actual Work No. Done (As on date of the 1----,--,-,--- '------ ---- Certificate) (2) (3) Excavation 100 % I-----=-'---- Basements (if any ) I N.A. I----,---_~odiums (if any) N.A. 1---- Pllflth ---- --- 100 % Stilt Floor 100 % Slab ofS-::--u i p-e-r-S'-t-ru cture 100 % - Internal Walls, Internal Plaster, Floorings, Doors, 50 % I windows within Fla ts / Premises 8. I Sanitary Fittings w ithin Flats / Premises 40 % 9. ~aircases, Lift W ells & Lobbies at each Floor Level 80% .----~.-- ~ Overhead and Unde rground Water Tanks 10. External Plumbing & External Plaster, Elevation, 20% Completion of Te rraces, with waterproofing of the Building I Wing ~_ 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 00 % and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipn rents, Compliance to conditions of Environment I CR Z NOC, Finishing to Entrance Lobby/s, Plinth Prot ection, Paving of Areas appurtenant to BuildinglWing, Compound Wall and all other requirements as m ay be required to complete Project as per specification s to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number --- S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes I NO) Done I (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & ~ootpaths N.A. N.A. N.A. 2. ~ater Supply_ YES 50 % BOREWELL 3. I Sewerage (Chamber, Lines, YES 00 % DRAINAGE I Septic Tank, STP) -- LINE 4. Strom Water Drains N.A. N.A. N.A. - 5. Landscaping & Tree Planting N.A. N.A. N.A. 6. Street Lighting N.A. N.A. N.A. -- 7. Community Buildings N.A. N.A. N.A. 8. Treatment & Disposal of Sewage N.A. N.A. N.A. and Sullage Water __ 9. Solid Waste Management & N.A. N.A. N.A. Disposal 10. Water Conservation / Rain Water YES 00% UPTO Harvesting BOREWELL - 11. Enei9Y. ManagemE~nt N.A. N.A. N.A. 12. Fire Protection & Fire Safety N.A. N.A. N.A. requirements f---- . 13. Electrical Meter Room, Sub- YES 50 % METER Station, Receiving _Station 14. Others_(Option to Add more) Yours faithfully, Signature & Name (IN BLOCK LETTERS) of Land Surveyor / Architect License Number (COAl2013/60839) Agreed & Accepted by: Signature of Promoter's Name: Date: ARCHITECT. Mr. Dhananjay B. DOlfode (B.Arch, M.Arch) CA/2013/60839 'G .• P No 3 FA 4 Gajanan Colony, Aurangabad anra] .' ,