FORM-2 [. SeeRegulation 31 ENGINEER'S CERTIFICATE (lo be submitted at thetime of Registration of Ongoing Project and for withdrawal of Money trom Designated. account - ProtectWise) Date: 31.03.24 To The DVK Construction 2, Shree Plaza Kranti Chowk Police Station Road Deogiri Colony, Aurangabad. Subject: Certificate of Cost fincurred for Development of SWAR KALYAN having Maha RERA Registration Number P51500045348 (Only Applicable after project Registration) being developed by DVK Construction Sir I/we Sachin B. Pathak have under taken assignment of certifying Estimated Cost for having Maha RERA Registration Number P51500045348 (only applicable after project Registration being developed by DVK Construction 2. We have estimated the cost of Civil, MEP and allied works required for completion of theapartments andproportionate completion ofinternal&external works oftheproject as per specificationsmentioned in attachment of sale. Our estimatedcost calculations are based on theavailable made available tous for theprojectunder reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantitysurveyor* appointed by Developer Engineer.theassum ption tothe cost of material. labour and other inputs mad by developer. and thesite inspection carriedout by us to ascertain /confirm the above analysis given to us. 3. We estimate Total Estimated Cost of' completion of the aforesaid project under reference at Rs. 1,95,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost ofProject is with references to the Civil, MUP and Allied works required for completion of the apartments andProportionate complication of internal external works. As per specificationsmentioned in agreement of sale and For the purpose of obtaining occupation certificate /completion certificate for the Building(s) / Wing(s) rLayout /PlottedDevelopment from thebeingthe Planning Authority under whose jurisdiction the aforesaidproject is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 77,75,000/- (Total of TableA and B) the amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of this items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apart1mernts and Completion of internal & external works, as per specifications mentioned in agreementof sale,of' the Project is estimated at Rs. 1,17,25,000/- (Total of Table Aand B) 6.Icertity that the Cost of the Civil, MEP and allied work for the apartments and proportionate and internal &Extremal works, as per specifiations mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table A andB) below: rAT!AK PECvi) lL CNGNEER Reg. . TABLE-A Building /Wing/ Layout / Plotted Development bearing Number or called (To be prepared separately for each building /Wing /ayout /Plotted Project) Developmentof the Real Estate Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building/Wing /Layout / Plotted 1,95,00,,000/ Development as on date of Registration is 2 Cost increed as on date of' certificate 31.03.2024 3 77,75,000/ Work done in Percentage (as Percentage of the estimated cost) 25% 4 Balance Cost to be incurred** (Based on Estimated Cost) 1,17,25,000/ Cost Incurredon Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-B Internal & External Development Works in Respect of the Registered Phase Sr Particulars No Amount (in Rs.) 1 Total Estimated Cost of the Internal and External Development Works including amenities and Facilities in Cost incurred as on date of certificate 0/ Work done in Percentage (as Percentage of the estimated cost) % 4 Balance Cost to be incurred** (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra items not included in the 0/ Nil Estimated Cost (Table -C) Yours Faithfully, Signature & Name SACHIN B. PATHAK with Stamp of Engineer SACA:B. PATHAK [Not Less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] BE(Ci) CONSJLTHC LENGINEE.R Reg. No. DbiCD2321/APLIOI3 :3 A:rengahad Local Authority license no. (Ifapplicablf) Asreed and cebito Sigháture of Pròmote URANO Aame: DVK Construction ABES Date 31.03 24 Note: 1The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (-) Quantitysurvey can be done by office of Engineer or can be done by an independent Quantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (") 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in guantity required/escalation of cost etc. As this an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred to be incurred. 5. Allcomponents of work with specifications are indicative and not exhaustive 6. Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr.no Particulars Amount (In Rs.) 1 2 N B.PATIHAK E.E.(Civil) coNSUAING CIVIL ENGINEER Reg. No. DUMCBIRI2021/APL/O/316 Aurangabad