DEEPAK V. KULKARNI Architect A.I.I.A. M.C.A. « Interior Designer Developers OFFICE : 2,Shree Plaza, l4, Deogiri Colony, Kranti Chowk Police Station raod, Samata Nagar Chowk, Aurongabod. 431 001. Ph. (O) 2339293 / Mob. 9822375295 Reg. No. CA/ 87/10707 Ref.: Date : FORM 1 [seeRegulation 3| ARCHITECT'SCERTIFICATE (To be submited atthe time of Registration of Ongoing Projectand for withdrawalof Money fromDesignatedAccount) DATE 31.03.2024 To The DVK CONSTRUCTION Shree Plaza, 2 DeogiriColony, Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of SWAR KALYAN having MahaRERA Registration Number P51500045348 (only Applicable after Project Registration) being developed by [Promoter Name] Sir, / We Deepak V. Kulkarni have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of having MahaRERA Registration Number P51500045348 (Only Applicable after project Registration. being developed by DVK Construction Based on Site inspection. with respect to Layout / each of theoftheaforesaidRealEstate Project. I certify that as on the date of thiscertificate, the Percentage of Work done for eachofthe building/Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. percentageofthe work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Number (To be prepared separately for each Layout building/Wing of The Project) Tasks/ Activity Percentage of Actual Work Done No (2) (Ason date of this (1) Certificate) (3) 1 Excavation 100% 2 Basernent's (if any) 0% Podiums (if any) NA 3. 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure DEEPAK V KULKARNI 100% Arhitbß Internal walls, Internal Plaster, looriele wnd Valrer 100% 7 ettrétttothy Kranhw Re windows within Flats/Premises ooo Sanitary Fittings within the Flat/Premises 60% 9 Staircases. lifts' Wells and Lobbies at each Floor level 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas andfacilities Proposed Percentage Details No (Yes/No) of Actual (1) (2) (3) Work (5) Done (As on date of the Certificate) (4) 1 Internal Roads & Footpaths 0% 2 Water Supply 0% 3 Sewerage (Chamber, lines, SepticTank, STP). 0% 4 Storm Water Drains 0% 5 Landscaping &Tree Planting 0% 6 Street Lighting NA 7 Community Buildings NA Treatment and disposalof sewage and sullage water. NA 9 Solid Waste management & Disposal 0% 10 Water conservation / Rain water harvesting NA 11 Energy management. NA 12 fire protection and lire Safety requirements NA 13 Electrical meter room, sub-station, receiving station. NA 14 Others (Option to Add more) DEEPV KULKARNI Architct &Appored Valuer 2 Shree AlagA4 Deogiri Colony Kranti Chuwk in Ro hura ad No. CA/1937/10707 F-15058 Regd TABLE-A Building /Wing/ Layout / PlottedDevelopment bearing Number or called (To be prepared separately for each building /Wing / layout /Plotted Developmentof the Real Estate Project) Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building/Wing/ Layout /Plotted 1,95,00, 000/ Development as on date of Registration is 2 Cost increed as on date of' certificate 31.03.2024 3 77,75,000/ Work done in Percentage (as Percentage of the estimated cost) 25% 4 Balance Cost to be incurred ** (Basedon Estimated Cost) 5 1,17,25,000/ Cost Incurredon Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-B Internal & External Development Works in Respect of the Registered Phase Particulars Amount (in Rs.) No 1 Total Estimated Cost of the Internal and External Development 0/ Works including amenities and Facilities in Cost incurred as on date of certificate 0/ 3 Work done in Percentage (as Percentage of the estimated cost) % 4 Balance Cost to be incurred** (Based on Estimated Cost) Cost Incurred on Additional /Extra items not included in the 0/ Nil Estimated Cost (Table -C) Yours Faithfully, Signature & Name SACHIN B. PATHAK with Stamp of Engineer [Not Less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license no. (If apliDEPAK KULKARNI APitect Aprovec Valuef 2 SH0 Deogri Coiony Agreed ahd Asepret hy: Krant. Gnu Regd No 1528 Signature of Promoter Name: DVK Construction Date: 31.03.24