SARTHAK ASSOCIATES Office No.C7, 3 rd Floor, Prozon Trade Center, Prozone Mall, Aurangabad-431006, (Maharashtra) "AR CHITECISIN TERIOR DESIGNERSVALUERS AnnexureA FROM 1 [See Regulation3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account Date: 19/02/2025 M/s. Sainaath Builders and Developers, Project Radha Krushna Villa Phase-2 Group Housing on Gut No.21 AtVillage Sunderwadi' Tq.Dist.Chh.sambhajinagar Radha Krushna Villa Phase 2 Subject: Certificate of Percentage of Completion of ConstructionVWork Of developed by M/s. Sainaath Builders and having MahaRERA.Registration Number P51500033700 being Developers. Sir, undertaken assignment as Architect IWe Santosh Sakhare Proprietor of M/s. Sarthak Associates have Construction Work Of Radha Krushna Villa /Licensed Surveyor of certiflying Percentage of Completion of being developed by M/s. Sainaath Builders P51500033700 Phase 2 having MahaRERA Registration Number and Developer Building/ wing of the aforesaid Real Estate Project. I Based on site Inspection eith respect to Layout/ each of the Real certify that as on the date of this certificate, the Percentage of Work done for each of the building/ wing of therespect to Thw Percentage of the work executed with Estate Project under MahaRERA isas per TableA herein below. Table B each of the activity of the entire phase is detailed in SH SAKHA CAI2004/ 34295 ARCHVTECS TABLEA Building Name:Row House C1-8 To 16 Sr. Tasks/ Activity Percentage of actual Work No. (2) done (1) (As on date of Certificate ) (3) Bxcavation 100% Basements (if any) 0% 3 Podiums(if any) NA Plinth 100% 5 Stilt Floor |100% 6. Slabs of Super Structure 100% 7. |Internal walls,Interal Plaster,Floorings,Doors and Windows within Flats / |100% Premises 8 Sanitary Fittings within the Flat / Premises 100% 9. Staircase Lift Wells and Labbies at each Floor level, Overhead and |Underground Water Tanks |100% |10. External plumbing and external plaster, elevation,completion of terraces 100% with waterproofing of the Building 1.1. Installation of Lifts .water pumps,Fire Fighting Fittings and Equipment as B0% per CFO NOC", Electrical fittings,mechanical equipment, Compliance to konditions of environment / CRZ NOC, Finishing to entrance lobbt/s , plinth protection , paving of areas appurtenant to Building/ Wing, Compound Wall and allother requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. GAI2004/ 34295 RCH Row House Number :C2-01 TO 08 (8Row Houses) Sr. Tasks/ Activity Percentage of actual Work No. 2) done (As on date of Certificate ) (1) (3) Excavation 100% 2. Basements (if any) 0% 3. Podiums(if any) NA 4. Plinth 100% 5. Stilt Floor 100% Slabs of Super Structure 100% Internal walls,Interal Plaster, Floorings,Doorsand Windows within Flats 100% Premises 8. Sanitary Fittings within the Flat / Premises 100% 9. Staircase Lift Wells and Labbies at each Floor level, Overhead and Underground Water Tanks |100% External plumbing and external plaster, elevation,completion of terraces 100% with waterproofing of the Building |1.1. Installation of Lifts .water pumps ,Fire Fighting Fittings and Equipment as 30% per CFO NOC", Electrical fittings,mechanical equipment, Compliance to konditions of environment / CRZ NOC, Finishing to entrance lobbt/s , plinth protection , paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. GAI2004/ ) n 34295 RCHT Row House Number: C2-09 TO 16 (8 Row Houses) Sr Tasks/ Activity Percentage of actual Work No. (2) done (As on date of Certificate ) |(1) (3) Excavation 100% 2. Basements (if any) o% 3 Podiums(if any) 0% 4 Plinth |100% 5. Stilt Floor 100% 6 Slabs of Super Structure 100% 7. Jinternal walis, Interal Plaster, Floorings,Doors and Windows within Flats / 100% Premises 8. Sanitary Fittings within the Flat / Premises 60% 9. Staircase Lift Wells and Labbies at each Floor level, Overhead and Underground Water Tanks 0% 10. External plumbing and external plaster, clevation,completion of terraces 40% with waterproofing of the Building 1.1. JInstallation of Lifts.water pumps ,Fire Fighting Fittings and Equipment as B0% per CFO NOC", Electrical fittings, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobbt/s, plinth protection,paving of areas appurtenant to Building/ Wing, Compound Wall And allother requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. K0SHSAKF CAI2004/ 34295 RCHIS EC1 TABLE B Common Areas ( Internal and External Dvelopment Works ) in respect of the Registered Phase / Project Number: PS1500033700 Sr.No. |Common area and Facilities Proposed Percentage of Actual Details (2) (Yes/No) Work Done (5) (1) KAsOn Date OfThe (3) |Certificate) (4) Internal Roads &Footpaths Yes 80% Internal Road of trimix and foothpath 2. Water Supply |Yes 80% Rain Water havesting lines and chamber Sewerage (Chamber, Yes 90% lines,Septic Tank, STP). 4 Storm Water Drains No NA 5. Landscaping &Tree Planting (es 80% Tree Planting 6. Street Lighting Yes 90% Internal Street Light Community Buildings No 8. Treatment and disposal of sewage and No Sullage water. 9. Solid Waste management &Disposal No IO. Water conseriation/ No Rain water harvesting 11. Energy management No ||2. Fire protection and fire Safety requirements No Electricalmeter room,sub-station, Yes 100% Electric DP 3. receiving station. 14. Others (Option to Add more). No K0SHSAKZ CA/2004/in 34295 CHNE ÇA2004+ 34235 RCHITES YoursFaithfully, Signature&Name(INBLOCKLETTERS)ofL.S/Architect (License No. ...) AgreedandAcocptcdb): SignatureofPromoter Name: Date: Srinesth Builders & Developers Patner