Mirkute Architects and interior designers Dhananjay complex, 265-UIkanagari, CHH, SAMBHAJINAGR Mobile- 9422210270 Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Reaistration of Ongoing Proiect &for Withdrawal of Money from Designated Account) Date: 31.03.2025 To, Mr Shodhan Joshi, 102, Veer Shanti, Adalat Road, KrantiChowk, Aurangabad -431005 Subject: Certificate of Percentage of Completion of Construction Work of Sukrut Apartments (Registration No. P51500033918) being developed by Mr Shodhan Joshi. Sir, | Saurabh Mirkute have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of project named as Sukrut Apartments (Registration No. P51500033918). Being developed by Mr Shodhan Joshi. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. URABH MIRK Sa AR. Registered COANO. C A / 2 0 1 7 84766 RCHTE TABLE-A S. (Sukrut Apartments) Tasks IActivity Percentage of Actual Work No. Done (As ondate of the Certificate) (1) (2) (3) 2 Excavation 100% 3 Basements (if any) NA Podiums (if any) NA Plinth 100% Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, Internal Plaster, Flooring, Doors, 100% windows within Flats /Premises 8 Sanitary Fittings within Flats I Premises 100% Staircases, Lift Wells & Lobbies at each Floor Level 100% Overhead and Underground Water Tanks 10. Extermal Plumbing & External Plaster, Elevation, 90% Completion of Terraces, with waterproofing of the Buildíng I Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 90% and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas apputenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (lnternal &External Development Works) in respect of the Project Registration No. P51500033918 S. Common Areas & Facilities Proposed Percentage of actual Details (Yes / No) Work Done No. (As on date of Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 100% Through Bore well 3 Sewerage (Chamber, Lines, Yes 90% Only Chamber & Septic Tank, STP) Lines 4 Strom Water Drains No NA 5 Landscaping &Tree Planting No NA Street Lighting No NA 6 T Community Buildings No NA 7 8 Treatment & Disposal of Sewage No NA and Sullage Water Regisered cOA NO. 9 Solid Waste 10. Disposal Management & No NA Water Conservation / Rain Water Harvesting Yes 100% Rain harvesting water as per corporation 11. Energy Management norms. 12. Fire Protection & No NA Fire Safety No NA 13. requirenments Electrical Meter Room, Sub No NA 14. Station, Receiving Station Others (Option to Add more) No NA Yours faithfully, RABH, MIRK SA pR.Regisered SA R. 88764 CO RCHTE Ar. Saurabh Mirkute (Architect) License Number (REGD. No. COA No./CAI2017/86766) Agreed &Accepted by: Signature of Promoter Shodhan Joshi Date: 31.03.2025