Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 07/01/2022 To, Mr. Shodhan Yashwant Joshi 102, Veer Shanti, Kranti Chowk, Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of Building Sukrut Apartment (to be Register in RERA) situated on Plot bearing C.T.S. No 16325/20 & 26 Plot Nos.Od & 09 situated at Sanjay Co-op Housing Society, being Developed by Mr. Shod han Y. Joshi. Sir, I 1 We have undertaken assignment as Architect 1 Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Building Sukrut Apartment (to be registered in RERA) being Developed by Mr. Shodhan Y. Joshi. Based on the Site Inspection, with respect to the Layout 1 each BuildinglWing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildinglWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Building Sukrut Apartment S. Tasks 1 Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) I I I (2) (3) 1. Excavation 0% 2. Basements (if any) NA 3, Podiums (if any) NA 4. 01 Number of Plinth 0% 5. 01 Number of Stilt Floor 0% 6. 06 Number of Slab of Super Structure 0% 7. Internal Walls, Internal Plaster, Floorings, Doors, 0% windows within Flats 1 Premises B. Sanitary Fittings within Flats 1 Premises 0% 9. Staircases, Lift Wells & Lobbies at each Floor Level 0% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 0% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 0% and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Building Sukrut Apartment (To be registered in RERA) S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes I NO) Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No NA 2. Water Supply Yes 0% Through Borewell 3. Sewerage (Chamber, Lines, Yes 0% Only Septic Tank, STP) Chamber & Lines 4. Strom Water Drains No NA 5. Landscaping & Tree Planting No NA 6. Street Lighting No NA 7. Community Buildings No NA 8. Treatment & Disposal of Sewage No NA and Sullage Water 9. Solid Waste Management & No NA Disposal 10. Water Conservation / Rain Water Yes 0% Rain Water Harvesting Harvesting as per Corporation Norms 11. Energy Management No NA 12. Fire Protection & Fire Safety No NA requirements 13. Electrical Meter Room, Sub- No NA Station, Receiving Station 14. Others (Option to Add more) No NA Yours faithfully, SAURABH MIRKUTE (Architect) License' Number (REGD. No. COA No./CAl2017/86766) Agreed & Accepted by: ~ Signature of Promoter Name: Mr. Shod han Y Joshi Date: 09/01/2022