SARTHAK ASSOCIATES Office No.C7, 3rd Floor, Prozon Trade Center, Prozone Mall, Aurangabad-431006, (Maharashtra) " ARC HITE CTSINTERIoRDESIGN ERSVALUERS Annexure A FORM1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 08-07-2023 To, SRUSHTI DEVELOPERS, PLOT NO 264, NEAR KALA GANPATI MANDIR, N-1, CIDCO, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of SRUSHTI RESIDENCY having MahaRERA Registration Number P51500032142 being developed by SRUSHTI DEVELOPERS. (FOR APR - JUN 2023 QTR) Sir, | We M/s. SARTHAK ASSOCIATES have undertaken assignment as Architect / Licensed Percentage of Completion of Construction Work of SRUSHTI RESIDENCY having MahaRERASurveyor of CertiĆ­ving Registration Number P51500032142 being developed by SRUSHTI DEVELOPERS. Based on the Site Inspection, with respect to the Layout / each BuildingWing of the aforesaid Real Estate Proiect. certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingWing of the Real Estate Proiect under MahaRERA 0s as per Table-A herein below. Ihe percentage of work executed with each of the activity of entire Phase is detailed in Table-B. respect to TABLE-A Layout / Building / Wing Number of SRUSHTI RESIDENCY S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements (if any) 0% 3 Podiums (if any) 4 Plinth 0% 5. Stilt Floor 0% 6 Slab of Super Structure 0% 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within 0% SAKA TeCHIS Flats / Premises 8 Sanitary Fittings within Flats / Premises 9 0% Staircases, Lift Wells & Lobbies at each Floor Level Overhead and 0% Underground Water Tanks 10 External Plumbing & External Plaster, Elevation, Completion of 0% Terraces, with waterproofing of the Building / Wing 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / Finishing to Entrance Lobby/s, Plinth Protection, Paving CRZ NOC, of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal &External Development Works) of SRUSHTI S. No. Common Areas &Facilities RESIDENCY Proposed Percentage of Details (Yes / NO) actual Work Done (As on date of (1) Certificate) (2) (3) (4) 1. Internal Roads &Footpaths (5 NO 2. Water Supply N.A. YES 10% FROM BORE-WELL 3 Sewerage (Chamber, Lines, Septic YES 0% DRAINAGE LINE TILL CORPORATION Tank, STP) 4 Strom WNater Drains LINE NO 5 Landscaping &Tree Planting N.A. NO 6 Street Lighting N.A. NO 7 Community Buildings NO N.A. 8 Treatment &Disposal of Sewage N.A. NO and Sullage Water N.A. 9 Solid Waste Management & NO Disposal N.A. 10 Water Conservation / Rain Water YES 0% RAINWATER HARVESTING AS PER Harvesting 11. Energy Management NO NORMS 12. Fire Protection &Fire Safety YES N.A. 0% AS PER FORE NORMS requirements 13. Electrical Meter Room, Sub YES 0% AS PER MSEB NORMS Station, Receiving Station 14. Others (Option to Add more) NO N.A. Yours faithfully, K0SHS42 205 ARCH SANTOSH SAKHARE. Signature &Name (IN BLOCK LETTERS) of Land Surveyor / Architect License Number ( Agreed &Accepted by: SRUSHTI EVELOPERS Signature of Promoter Name: SRUSHTIDEVELOPERSPartner Date: 08-07-2023