Architects Interior Designers ARCHITECTS Annexure A Project Consultants A SVergy Gou o parY FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 09/04/2026 To, PADMANABH DEVELOPERS AURANGABAD, MAHARASHTRA, 431005 Subject : Certificate of percentage of Work of completion of construction work of ELEMENTS TERRA having MahaRERA Registration Number P51500032459 (Only Applicable after project Registartion) being developed by PADMANABH DEVELOPERS Sir, IWe SANIL ARCHITECTS have undertaken assignment as Architect /Licensed Surveyor of certitying Percentage of completion of Construction Work of ELEMENTS TERRA having MahaRERA Registration Number P51500032459 (Only Applicable after project Registration, being developed by PADMANABH DEVELOPERS ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingWing of the Roal Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: ROW BUNGLOW A1 TO A8/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stit Floor 100.00 6 |Slabs of Super Structure 100.00 7 |Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 95.00 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 85.00 10 External plumbing and external plaster, elevation, completion of terraces with 80.00 waterproofing of the Building/wing. Nishigandh-C. Disha Srushti, Opp. Hotel Atíthi, Rananagar, Jalna Rd, Chh. Sambhajinagar, Maharashtra - 431005 t+91 240 2451616% info@samilarchitects.com 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 80.00 |CFO NOG, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayoutBuilding/Wing Number: ROW BUNGLOW B9 TOB15/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 95.00 Flats/Premises co Sanitary Fitting within the Flat/Premises 90.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 90.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 90.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 85.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmen/CRZ NOC, Finishingto entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements |as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout/Building/Wing Number: ROW BUNGLOW C16 TO C23/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth. 100.00 Stilt Floor 100.00 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 85.00 Flats/Premises Sanitary Fitting within the Flat/Premises 90.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 90.00 |waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 85.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B/Project Phase - Common Areas (Internal and External Development Works) in respect of Registered Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 |Internal Roads & Footpaths Yes 85.00 INTERNAL PROJECT TAR OR CEMENT ROADS 2 Water Supply Yes 90.00 WATER SUPPLY FROM BOAR WELL 3 Sewerage (Chamber, Lines, Septic Tank, STP) Yes 75.00 DRAINAGE LINE TILL CORPORATIO N DRAINAGE LINE 4 Storm Water Drains No 0.00 NA 5 Landscaping & Tree Planting Yes 75.00 TREE PLANTATION AS PER NORMS 6 Street Lighting Yes 80.00 INTERNAL PROJECT STREET LIGHT 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA |Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 90.00 RAIN WATER HARVESTING g AS PER |2 2 NORMS )y 11 Energy managemcnt No 0.00 12 Fire protection and fire safety reguiremets NA No 0.00 13 Electrical meter room, sub-station, receiving station NA No 0.00 14 |Aggregate area of recreational Open Space NA No 0.00 15 |Open Parking NA 0.00 NA Yours Faithfully Reg.Nc CA-S5/19301 ARSAMEEÈR AUSĘKAR RAD Signature & Name (N BLOCK LETTERS) of8r Architect (License No: CA 95/19301) Date of Certificate: Agreed and accepted bypADMANABH DEVELOPERy Signature of Promoter pARTNER PARTNER Name: PADMANABH DEVELOPERS Date: