Arditects I lnterior Desiqne15 | Project Consultanls I a syrsgy Group comDant F0RM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account- BuildingMing wise) Date: 13/10/2025 To, M/s. PADMANABH DEVELOPERS, OFF NO 101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD. Subject: Certificateof Cost lncuned for Development of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Ref: RERA Registration No. P51500032459 Sir l/ We SAMIL AhCHIECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVETOPERS. Based on Site lnspection, with respect to each of the BuildingIVVing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number IIAHA RERA Registration No. P51500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Al TO A8, 89 TO B15, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-C, Disha Srushti. Opp. HotelAtithi, Rananagar,,alna Rd, Chh. Sambhajinagar, Maharashtra -431005 e+91 240 24516168 info@samilarchitects.com Table A (A1 TO A8 Building) (To be prepared separately for each Building AlVing of the Project) A'l TO A8 Building (JULY TO SEPTEMBER 20251 SR.NO. TASKS / ACTIVITY % OF WORKOONE 01 Excavation 100% 02 0'l Number of Plinth 100o/o 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 100o/o lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each ofthe 100o/o FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 90o/o within the FlaUPremises Staircases, tifrs-lA/ells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 100o/o Water Tanks 09 The external plumbing and external plaster, elevalion, 85o/o completion of terraceswith waterproofing of the Building/Wing, ln€ta[a{i€f,€flifrs, water pumps,Fi{eFigh+iFg-Fi$ing6en+ Equrpm€fi+asf€F€F,ElectricalfittingstoCommon Areas, electro, mechanical equipment, Compliance to '10 conditions of environment /CRZ NOC, Finishing to entrance 80o/o lobby/s, plinth protection, paving of areas appurtenantto Building/vving, Compound Walland allother requirements as may be required to Obtain 0ccupation /Completion Certificate Table A (89 TO 815 Building) (To be prepared separately for each Building Ming of the Project) 89 TO 815 Building (JULY TO SEPTEMBER 2025) sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100Yo UZ 01 Number of Plinth 100% 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 100% lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windowstoeach of the 95o/o FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Eleckical Fittings ono/^ within the FlaUPremises Staircases, tifls-lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifts, overhead and Underground '100% Water Tanks 09 The external plumbing and external plaster, elevation, 90% completion of terraceswith waterproofing of the BuildinglVVing, lnsla+la{lan