Architects lnterior Designers Project Consultants A syrarcly G,ouo comD.ny FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Prolect and for withdrawal of Money from Designated Account- BuildingMing wise) Date. 1210412025 To, M/s. PADMANABH DEVELOPERS, OFF NO 101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD. Sub.ject: Certificate of Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, IMAHA RERA Registration No. P515000324591 being developed PADMANABH by M/s. DEVELOPERS. Ref: RERA Registration No. P51 500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate froject, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number MAHA RERA Registration No. P51500032t159 is, as per table A herein below. The percentage of the work executed with respect to each of the malor activity of the Building Al TO A8, 89 TO B15, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh< DCha s.ll5lrti, Opp. Hotel Atid . Rananagar, lalna Rd, Chh. Sambhajinagar. Maharashtra - 431005 Q + 91 240 2451 616E info@samilarchitects,com t- Table A (Al TO A8 Building) (To be prepared separately for each Building M/ing of the Project) A1 TO A8 Building (JANUARY TO MARCH 20251 sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100% 02 0'l Number of Plinth 100o/o 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Slructure 100% lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windowsto each of the 90% FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 80% within the FlaVPremises Staircases, tifts-lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 95% Water Tanks 09 The external plumbing and external plaster, elevation, 7 5o/o completion of terraceswith waterproofing of the BuildingANing, lFs{alatien€flifrs, water pu m p s, FireFigh{ingrFi$ingsan+ Equipm€n+e€f€+€Fo+loe, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 7lYo lobby/s, plinth protection, paving of areas appurtenantto BuildingllVing, Compound Walland allother requ irements as may be required to 0btain 0ccupation /Completion Certificate Table A (B9 TO 815 Building) (To be prepared separately for each Building /vving of the Project) 89 TO 815 Building (JANUARY TO MARCH 20251 sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100o/o 02 01 Number of Plinth 100% 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 100Y0 lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each ofthe 85Yo FlaVPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 7 50k within the FlaUPremises Staircases, tifrs-lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifls,0verhead and Underground 90% Waler Tanks 09 The external plumbing and external plaster, elevation, 7 5o/o completion of terraces with waterproofing of the Building/vving, lnstallationeflifls, water pumps, FireEigrh{ingr#i$ingsan4 Eq+ipmeetasBeF€fg+gc, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 mnditions of environment /CRZ NOC, Finishing to entrance 7 5o/o lobby/s, plinth protection, paving of areas appurtenantto BuildingMing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certilicate Table A (Cl6 TO G23 Building) (To be prepared separately for each Building M/ing of the Project) Cl6 TO C23 Building (JANUARY TO MARCH 20251 SR.NO, TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100% i) 01 Number of Plinth 100o/o 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 100% nternalwalls, lnternal Plaster, Flooringswithin I 06 Flats/Premises, Doors and Windows to each of the 65% FlaVPremises 07 Sanitary Fittings within the FlaVPremises, Eleckical Fittings 55Yo within the FlaVPremises Staircases, tiff€-lArell8 and Lobbies at each Floor level 08 connecting Staircases and Lifts, overhead and Underground 90% Water Tanks 09 The external plumbing and external plaster, elevatiorl 45o/o completron of terraces with waterproofing of the Building/Wing, lnsta+latbn€flifls, water pumps, Fi{€+Eh{*€+iftif,g€€€+ Equipm€n{€sp€F€Fo+J€e, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 40o/o lobby/s, plinth protection, paving of areas appurtenantto Building/}Ving, Compound Walland allother requ irements as may be required lo Obtain 0ccupation /Completion Certificate Table B (lnternal & External Development Works in Respect of the entire Registered Phase) PROPOSED olo OF SR.NO. TASKS / ACTIVITY DETAILS (YES/NO) WORKDONE 01 nternal Roads & Footpaths : YES 80Yo INTERNAL PROJECT TAR OR CEMENT ROADS 02 Waler Conservation, Rain YES 85o/o RAIN WATER waler Harvesting : HARVESTING AS PER NORMS UJ Energy management : NO N.A- 04 Fire Protection And Fire NO N.A. Safety Requirements : 05 Electrical Meter Room, Sub. NO N.A. Station, Receiving Station : Aggregate area of recreationa YES As per drawings by 06 Open Space : Consultants 07 Cpen Parking : NO N,A. 08 Alater Supply : YES 85% WATER SUPPLY FROM BOAR WELL 09 Sewerage (Chamber, Lines YES 700/o DRAINAGE LINE TILL Septic Tank , STP) : CORPORATION DRAINAGE LINE Storm Water Drains : NO N.A. 10 Landscaping & Tree YES 7lYo TREE PLANTATION AS 11 Planting: PER NORMS 12 Street Lighting . YES 7lYo INTERNAL PROJECT STREET LIGHT Community Buildings : NO N.A. 13 14 Others (Option to Add NO N.A. more) As per drawings by 15 Others. Compound Wall YES 00% Consultants (tu Yours Faithfully, t \-/ -For Er. trtltlnd M. wadekar REqd lio. MCB/R/2019/APU0026n SAMIL ARCHITECTS Agreed & accepted by, :.,,' k--. \^f\\r.J' -z - ..1 ).1 :., Name :M/s. PADMANABH DEVELOPERS Date :