Ar(hiteali I lnterior Designe6 | Proied Consultants I A Synargy FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- BuildingMing wise) Date: 13/01/2025 To, M/s. PADMANABH DEVELOPERS, OFF NO 101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD, Subject: Certificate of Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed PADMANABH by M/s. DEVELOPERS. Ref: RERA Registration No. P51500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, IMAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number MAHA RERA Registration No. P51500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Al TO A8, Bg TO B15, Cl6 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-C, Disha Srushti, 0pp. Hotel Atithi, Rananagar, Jalna Rd, Chh. Sambhajinagar, Maharashtra - 431005 li +91 240 24516168 info@samilarchitects.com Table A (Al TO A8 Building) (To be prepared separately for each Building /Wing of the Project) Al TO A8 Building (OCTOBER TO DECEMBER 20251 SR,NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100% 02 01 Number of Plinth 100% 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 100o/o lnternal walls, lnternal Plaster, Flooringswithin Ub Flats/Premises, Doors and Windows to each of the 85o/o FlaVPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 7 0o/o within the FlaUPremises Staircases, tifr€-lArells and Lobbies at each Floor level 08 connecting Staircases and Lifts, overhead and Underground 94% Water Tanks 09 The external plumbing and external plaster, elevation, 7 0o/o completion of terraces with waterproofing of the Buildingruing, lns{allatieneflifis, water pu mps,FireFighting€iSing.een4 gq+ipmen+aepe+gfg+gg, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 AAO/. conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenantto Building/VVing, Compound Walland allother requirements as may be required to 0btain 0ccupation /Completion Certificate Table A (B9 TO Bl5 Building) (To be prepared separately for each Building /Wing of the Project) 89 TO 815 Building (OCTOBER TO DECEMBER 2025} SR.NO. TASKS / ACTIVITY % OF WORKDONE 0'r Excavation 100% 02 01 Number of Plinth 100% D 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of-upei5tructure 100o/o lnternalwalls, lnternal plaster-Flooringswithin 06 Flats/Premises, Doorsand Windowsto each of the 7 5o/o FlaVPremises 07 Sanitary Fittrngs within@ 65% within the FlaUPremises 08 connecting Staircases and Lifts, overhead and Underground 85% Water Tanks 09 Ihe eliternal plumbing and external plaster, elevation, 7 5o/o completion of terraceswith wate rp roolin g of the Buildinq/vvinq, ln€la{atief,€flifr€, water pumps, FireEigh{ing#i$ingean4 EquiBn€f,+a€feFCFO+lOC, Etectrical fittingt to Common Areas, electro, mechanical equipment, Cbmpliance to 10 conditionsof environment/CRZ NOC, Finishing to entrance 70%o lobby/s, plinth protection, paving of areas appurlenantto BuildingANing, Compound Wall and all other requirementsas may be required to 0btain Occupation /Completion Cerlilicate Tabte A (Ct6 TO C23 Buitding) (To be prepared separalely for each Building /Wing of the project) c16 TO C23 euiHinglocToBER TO TASKS / ACTIVITY 01 Number of Plinth 00 Number of Basement Floor 00 Number of Stilt Floor 03 Number of Slabs of Super Struclure lnternal walls, lnternal Plaster.Flooringswithin Flats/Premises, Doors and Windows to each of the FlaUPremises SanitaryFittingswit@ within the FlaVPremlses Staircases,@ cornecting Staircases and Lifts, overhead and Underground Water Tanks 09 The external plumbing and external plaster, elevation, 40o/o completion of terraces with waterproofing of the Bulldingruing, lnstalla{ianefli*s, water pumps, Fi€Erghting+i$if,gc€n+ E{uipm€fllaspe+€F e,ElectricalfittingstoCommon Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 30% lobby/s, plinth protection, paving of areas appurtenantto BuildingAlVing, Compound Walland allother requirements as may be required to 0btain 0ccupation /Completion Certificate Table B (lnternal & External Development Works in Respect of the entire Registered Phase) PROPOSED Yo OF SR.NO. TASKS / ACTIVITY DETAILS (YES/NO) WORKDONE 01 nternal Roads & Footpaths : YES 80% INTERNAL PROJECT TAR OR CEMENT ROADS 02 Alater Conservation, Rain YES 850k RAIN WATER water Harvesling : HARVESTING AS PER NORMS n2 Energy management : NO N.A, 04 Fire Protection And Fire NO N.A. Safety Requirements : 05 Electrical Meter Room, Sub- NO N.A. Station, Receiving Station : As per drawings by Ub Aggregate area of recrealiona YES 0pen Space: Consultants 07 Cpen Parking : NO N,A. 08 ul/ater Supply : YES 85o/o WATER SUPPLY FROM BOAR WELL 09 Sewerage (Chamber, Lines, YES 700 DRAINAGE LINE TILL Septic Tank , STP) : CORPORATION DRAINAGE LINE 10 Storm Waler Drains . NO N.A, 11 Landscaping & Tree YES 70% TREE PLANTATION AS Planting: PER NORMS 12 Street Lighting . YES 70o/o INTERNAL PROJECT STREET LIGHT 13 Community Buildings : NO N.A, 14 Others (Option to Add NO more) N.A. 15 Others. Compound Wall As per drawings by YES 00o/o Consullants Yours Faithfully, 6;1$;;on :;-.*r,,"d U- nrgd H. wadeksr [c HCB/R/2019/APV0026n SAMIL ARCHlTECTS Agreed & accepted by, ?,. . ( )'o't ' t^' ,).1 . ir, r: Name :M/s. PADMANABH DEVELOPERS Date :