Ar.hitects I lnterior Desiqners I Proiect consultanls I a sYr.IgY o,ouo compai) FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account BuildingMing wise) Dale:1111012024 To, M/s. PADMANABH DEVELOPERS, OFF NO 101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD, Subject: Certificate of Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed PADMANABH by M/s. DEVELOPERS. Ref: RERA Registration No. P51 500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Conshuction Work of Project ELEMENTS TERM, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the Building/VVing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number MAHA RERA Registration No. P51500032459 is, as,per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building A1 TO A8, 89 TO 815, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-c, Disha srushti, opp. Hotel Atithi, Rananagar, ,alna Rd, chh. Sambhajinagar, Maharashtra - 431005 s\ +91 240 2451616E info@samilarchitects.com Table A (Al TO A8 Building) (To be prepared separately for each Building /Wing of the Projec0 A1 TO A8 Building (JULY TO SEPTEMBER 20241 SR.NO. TASKS / ACTIVITY % OF WORKDONE 0'l Excavation 100% 02 01 Number of Plinth 100% 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 1000k lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each of the 85% FlaUPremises UI Sanitary Fittings within the FlaUPremises, Electrical Fittings 7lYo within the FlaVPremises Staircases, tifts-lAlells and Lobbies at each Floor level 08 conneciing Staircases and Lifts, Overhead and Underground 940k Water Tanks 09 Thd external plumbing and external plaster, elevation, 7 0o/o completion of terraces with waterproofing of the BuildingllVing, lnstalatx*eflifrs, water pu m ps, FireF.ighingFr$ingsan4 gqsipm€n+asfe+€F-O,ElectricalfittingstoCommon Areas, electro, mechanical equipment, Compliance to 10 conditions of environment/CRZ NOC, Finishing to entrance 65% lobby/s, plinth protection, paving of areas appurtenantto Building/VVing, Compound Wall and all other requirements as may be required to Obtain 0ccupation /Completion Certificate Table A (89 TO 815 Building) (To be prepared separately for each Building ANing of the Project) 89 TO 815 Building (JULY TO SEPTEMBER 20241 sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100o/o 02 0l Number of Plinth 100Y0 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 100% nternalwalls, lnternal Plaster, Flooringswithin I 06 Flats/Premises, Doors and Windows to each of the 7 5o/o FlaVPremises 07 Sanitary Fiftings within the FIaUPremises, Electrical Fittings 65% within the FlaVPremises Staircases, tifts-.lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 85% Water Tanks 09 The external plumbing and external plaster, elevation, 7 5o/o completion of terraces with waterproofing of the Building/wing, lnstallatiensflifts, water pumps, Fir€+Ehling.Fittrf,g.s€f,+ eeuipmef,+asfer€F0+,lOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditionsof environment/CRZ NOC, Finishing to entrance 7lYo lobby/s, plinth protection, paving of areas appurtenantto Building/Wing, Compound Wall and allotherrequirementsas may be required to 0btain 0ccupation /Completion Certificate Table A (C16 TO G23 Building) (To be prepared separately for each Building M/ing of the Project) C16 TO C23 Building (JULY TO SEPTEMBER 2024) sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 1000/o 02 0l Number of Plinth 100Yo 03 00 Number of Basement Floor 04 00 Number of Stilt Floor 05 03 Number of Slabs of Super Structure 1lQo/o lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each ofthe 60% FlaVPremises 07 Sanitary Fittings within the FlaVPremises, Electrical Fittjngs 4SYo within the FlaUPremises Staircases, tifts-lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifls,overhead and Underground 85Yo Water Tanks no The external plumbing and external plaster, elevation, 40o/o completion of terraceswith waterproofing of the BuildinglVVing, lns+alla{ianeflifrs, water pumps, Fire+igh+ing+i$ings€€+ Eq+ipm€fi+e€fefef€,ElectricalfittingstoCommon Areas, electro, mechanical equipment, Compliance to '10 30o/o conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenantto Building/Wing, Compound Walland allother requirements as may be required to 0btain Occupation /Complelion Certificate Table B (lnternal & External Development Works in Respect of the entire Registered Phase) PROPOSED %oF SR.NO. TASKS / ACTIVITY DETAILS (YES/NO) WORKDONE 01 nternal Roads & Footpaths: YES 80% INTERNAL PROJECT TAR OR CEMENT ROADS 02 A/ater Conservation, Rain YES 85% RAIN WATER water Harvestlng : HARVESTING AS PER NORMS 03 Energy management : NO N.A, 04 Fire Protection And Fire NO N.A. Safety Requirements : 05 Electrical Meter Room, Sub. NO N.A, Station, Receiving Station : As per drawings by 06 {ggregate area of recreational YES Open Space : Consultants 07 Cpen Parking : NO N.A. 08 Water Supply : YES 85% WATER SUPPLY FROM BOAR WELL 09 Sewerage (Chamber, Lines YES 7lYo DRAINAGE LINE TILL Septic Tank , STP) : CORPORATION DMINAGE LINE 10 Storm Water Drains : NO N,A. 11 Landscaping & Tree YES 7 0o/o TREE PLANTATION AS Planting: PER NORMS 12 Street Lighting : YES 7 0o/o INTERNAL PROJECT STREET LIGHT 13 Community Buildings : NO N.A. 14 others (option to Add NO N.A. more) Others. Compound Wall As per drawings by 15 YES 00% Consultants Yours Faithfully, ()'b--- For \\-'l I I Er. ltltlnd tl. wadckar n.qdt{oHcBiR/2019/APUoo26o SAMIL ARCI{ITECTS Agreed & accepted by, UI4: PAII-INL,' '' . ..i.Ii'lER Name: M/s. PADMANABH DEVELOPERS Date :