MORAYA Construction & Engineer's R('9. No : CSTRQXZU VI T FORM - 2 Mr. Mukesh Santoshmo Sonwane (B.E - Civil) Yogesh N8gar, Jalna (MH) 8329443t43 mukeshsonwane I 55 I @gmail.com Annexure - B w [See Regulatton 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date: 05-04-2023 To, PADMANABH DEVELOPERS, OFF NO 1011102, MALGE MAJESTIC, SUT GIRNI ROAD, GARKHEDA, AURANGABAD Subject: Certificate of Cost lncurred for Development of ELEMENTS TERRA having MahaRERA Registration Number P51500032459 being developed by PADMANABH DEVELOPERS. (ForJan to Mar2023 QTR) Sir, 1. l/We MORAYA COSNTRUCTION & ENGINEER'S have undertaken assignment of Certifying Estimated Cost for ELEMENTS TERRA having MahaREM Registration Number P51500032459 being developed by PADMANABH DEVELOPERS. 2. We have estimated the cost of Civil, MEP and Allied Works required for completton of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants, The Schedule of ltems & Quantity required for the entire work as calculated by Quantity Surveyof appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / conflrm the above analysis given to us, 3 We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 8,61,24,5461 (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining MORAYA Mr. Mukesh Santoshrao Sonwane (B.E - Civil) Yogesh Nagar, Jalna (MI{) 8329447143 Construction & Engineer's mukeshsorwane I 55 I @gm8il-com Rtg. No : CSTRQXZUHVI T occupation certificate / completion certificate for the Building(s) / wing(s) / Layout / plotted Development from the AURANGABAD MUNICIPAL CORPORATION, AURANGABAD being the Planning Authority under whose ,iurisdiction the aforesaid Project is being implemented. 4 The Estimated cost incurred till date is calculates to Rs. 2,95,28,416/- (Total of Table A & B), The Amount of -Eslimile.d..-c..q-sl..lnculr.ed..is..g3lgulalgd...o..n..the.-.b.-?.9.1s-..oJ.-inpu! m.?.tef !e!Q,1.sery!9es. u99.d-.q.uni!. 99.sJ. e.I.th.ese.i!9ms 5. The Balance cost of completion of the civil, MEP & Allied works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 5,65,96, 130/- (Total of Table A & B). o. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal &externalworks,asperthespecificationsmentionedinAgreementofSale,ofthe aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building/Wing/LaYout FOR ELEMENTS TERRA . ROW BUNdLO\'1I- A1 TO A8 . 89, TO 815 - C16 TO C23 S. Particulars Amount (in Rs.) No. 1. Total Estirnated Cost of Building / Wing / Layout / Rs. 8,20,23,3771 Plotted Development as on date o[ Registration is 2. Cost inorrreO as on date of Certificate Rs. 2,87,08,182/- 31 March 2023 3. Work Done m Percentage (as Percentage of 35o/o Estimated Cost) 4 galance Cost to be incurred .' ((based on Rs. 5,33,15,'195t Estimated Cost) q Cost incurred on Additional / Extra ltems not included in the Estimated Cost (TablglQ) Mr. Mukesh Santoshrao Sonwans MORAYA Construction & Engineer's (B.E - Civil) Yogesh Nagu, Jalna (MH) 8329441141 mukeshsonwane I 55 I @gmail.com Rcg. No : C8TRQX?UHV I 7 TABLE - B Internal & External Development Works FOR ELEMENTS TERRA . NOW EUNGLOW - A1 TO AS ' B S. Particulars Amount (in Rs.) No. 1. Rs. 41,01,1691 Development Works including amenities & facilities in the Layout as on date of Eegistration is ,) cost incurtea;ffi dre of certificate Rs 8,20,2341- 31 March 2023 J. Wo*. Oonfi perce.ntage. (as Percentage of 2Oo/o Estimated Cost) ** Rs 32,80,935/- 4. Balance Cost to be incurred ((based on Estimated Cost) -ostlncuned on Additional / Extra ltems not included in the Estimated Cost (Ta!!elq) & ENGINEER'S Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number (if applicable) Agreed & Accepted bY: PADMANABH DFTETOPERS A)'', " PARTTIER PARTNER Signature of Promoter Name: PADMANABH DEVELOPERS Date: 05-04-2023 Note: per drawings '1 . The scope of work is to complete Registered Real Estate Project asAgreement to approved from time to time as per specifications mentioned in the Sale. MORAYA Construction & Engineer's Mr. Mukesh SrDtoshrao Soowaoc (B.E - Civil) Yogesh Nagar, Jalna (MH) 8329443t43 mukeshsonwane I 55 I @gmail.com Reg. No : CSTRQXzUHV l7 2 (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) & in case quantity are being calculated by office of Engineer, the name of person rn the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). J, ('*) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost ('l) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1 2.