MORAYA Construction & Engineer's Mr. Mukesh Santoshrao Sonwane (B.E - Civil) Yogesh N8g8r, J.loa (MIl) 83294r'.3t43 mukeshsonwane l55l @gmail.com .- Res. No : CBTRQXzUIIVI T Annexure - B FORM - 2 [See Regulatton 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Dale. 08-04-2022 To, PADMANABH DEVELOPERS, OFF NO 1011102, MALGE MAJESTIC, SUT GIRNI ROAD, GARKHEOA, AURANGABAO Subject: Certiflcate of Cost lncurred for Development of ELEMENTS TERRA having MahaRERA Registration Number P51500032459 being developed by PADMANABH DEVELOPERS. (For Jan to Mar 2022 QTR) Sir, 1. l/We MORAYA COSNTRUCTION & ENGINEER'S have undertaken assignment of Certifying Estimated Cost for ELEMENTS TERRA having MahaRERA Registration Number P51500032459 being developed by PADMANABH DEVELOPERS. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the speciflcations mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. J, We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 8,61,24,5461 (Total of Table A & B) at the time of Registration, The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining MORAYA Construction & Engineet's Mr. Mulesh Santoshrao Sodwane (B.E - Civil) Yogcsh Nagar, Jaloa (MH) 8329113t43 Euleshsonwane I 55 l@grnail.com Res. No : CSTRQX2UHVI T Occupation Certificate / Completion Certificate for the Building(s) / Wing(s) I Layout t Plotted Development from the AUMNGABAD MUNICIPAL CORPORATION, AURANGABAD being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs. 4 ,01 ,169/- (Total of Table A & 1 B). The Amount of Eslimg!.e..C....C..9.9!..lncur.e.d.tC..S.al.c..q.t?.led.9n.!.h.e.beSl9.af.jnp..q!..ma!eri.?19.1 .q9..r.v. j-c._e..s_.v99..d.8..q.nj!..9_o..s.t.9J.!heqe. j!9m.9. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. I,20,23,3771- (Total of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / Wing / Layout FOR ELEMENTS TERRA. ROW BUNGLOW-A1 TO A8 - 89 TO 815. C,t6 TO C23 S Particulars Amount (in Rs.) No. 1 Total Estimated Cost of Building / Wing / Layout / Rs. 8,20,23,3771- Plotted Development as on date of Reoistration is 2 Cost incurred as on date of Certificate Rs. 41 ,01 ,1691 31 Match 2022 3. Work Done in Percentage (as Percentage of 5Yo Estimated Cost) 4. Balance Cost to be incurred -. ((based on Rs.7,79,22,2081- Estimated Cost) Cost rncurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) MORAYA Construction & Engineer's Mr. Mutesh Santoshrao Sonwane @.E " Civil) Yogesh Nagar, JelnE (MI{) 83294/-lt43 t!ukeshsonwane I 55 I @gmail.com R0g. No : CSTRQX2UIM Z TABLE - B Interna-1 & Externa_l Development Works FOR ELEMENTS TERRA . ROW BUNGLOW - A1 TO A8 . 89 TO 815 . C16 TO C23 S. Pa rtic u la rs Amount (in Rs.) No. 1 Total Estimated Cost of lnternal & External Rs.41,01,169^ Development Works including amenities & facilities in the Layout as on date of Reqistration is 2. Cost incurred as on date of Certificate Rs. NlL/- 31 March 2022 3. Work Done in Percentage (as Percentage of 0o/o Estimated Cost) 4. Balance Cost to be incurred ** ((based on Rs. 41,01,169/- Estimated Cost) E, Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) Yours faithfully, FOR MORAYA COSNTRUCTION & ENGINEER'S ET MUKESH SONWANE Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Local Number (if applicable) Agreed lllfiya Constrrcfu n & Enginee/s Signature of Name: PADMANABH DEVELOPERS Date: 08-04-2022 PADt{At{ABH DhVEtOPER9 Note: \' ,fiq/ PARTI{ER^ PARTI{ER 1 . The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. MORAYA Construction & Bngineer's Mr. Mutesh Santoshrao Sonwane (B.E - Civil) Yogesh N.g8r, Jalna (MH) 8329443t43 mukeshsonwsne I 55 l@gmail.com Rcs. No: CSTRQXZUHVI T 2. (.) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (-) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). (*.) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive E Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) I 2.