FORM 'l [see Regulation 3] ,lrijnfl$d:fl: m ARCHITECT'S CERTIFICATE (To be submitted al the time of Registration of Ongoing Project and for wilhdrawal of Money from Designated Account- BuildingMing wise) Date. 1010412024 To, M/s. PADMANABH DEVELOPERS, OFF NO 101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD. Subject: Certificate of Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed PADMANABH by M/s. DEVELOPERS, Ref: RERA Registration No. P51 500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying percentage of completion of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being devetoped by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate project as registered vide number MAHA RERA Registration No. p51500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building A1 TO A8, 89 TO BlS, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishiqandh-C. Disha Srushti,0pp. HotelAtithi, Rananagar Jalna Rd, Chh. Sambhajinagar, tvaharashtra , 431 005 O+91 240 245161 6E{ info@samilarchitects.com Table A (Al TO A8 Building) (To be prepared separately for each Building Ming of the Project) A1 TO A8 Building (JAN TO MARCH 2024) SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100o/o 02 0l Number of Plinth 100% 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor 0% 05 03 Number of Slabs of Super Structure '100% nternal walls, lnternal Plaster, Flooringswithin I 06 Flats/Premises, Doors and Windows to each of the 7 0o/o FlaUPremises 07 Sanitary Fittings within the FlaVPremises, Electrical Fittings 35Yo within the FlaUPremises Staircases, tifie.lAlalls and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 85% Water Tanks 09 The external plumbing and external plaster, elevation, 25o/o completion of tenaceswith waterproofing of the BuildingllVing, ln€ta[eti€n€flifrs, water pu m ps, +i€+Ehting-Fitrif,g€€f,+ Equipmef,+€€fe+eF0,ElectricalfittingstoCommon Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 15o/o lobby/s, plinth protection, paving of areas appurtenantto BuildinglVVing, CompoundWalland allotherrequirementsas may be required to Obtain 0ccupation /Completion Certificate Table A (89 TO B15 Building) (To be prepared separately for each Building M/ing of the Project) 89 TO B'15 Building (JAN TO MARCH 2024) SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100Y0 02 01 Number of Plinth 100o/o 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor 0o/o 05 03 Number of Slabs of Super Structure 100% lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each of the 7lYo FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 35%o within the FlaVPremises Staircases, tifts-]Alells and Lobbies at each Floor level 08 connecting Staircases and Lifts, overhead and Underground 85% Water Tanks 09 The external plumbing and external plaster, elevation, 250 completion of terraceswith waterproofing of the Building/vving, lf,€ta{ati€n€+lifrs, water pumps, Fir€+ightin€FFifrif,g.eaf,4 Eqsipm€€+e€f€r€Eo+loc, Eleckical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditionsof environment/CRZ NOC, Finishing to entrance 15% lobby/s, plinth protection, paving of areas appurtenantto Building/Wing, Compound Walland allother requ irementsas may be required to 0btain 0ccupation /Completion Certificate Table A (C16 TO C23 Building) (To be prepared separately for each Building /Wing of the Project) C16 TO C23 Building (JAN TO MARCH 2024) sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100% 02 01 Number of Plinth 1000k 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor lYo 05 03 Number of Slabs of Super Structure 100% lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each of the 60% FlaVPremises UI Sanitary Fittings within the FlaUPremises, Electrical Fittings 25Yo within the FlaUPremises Staircases, lifls-lA/ells and Lobbies at each Floor level 08 connecting Staircases and Lifts, overhead and Underground 65% Water Tanks 09 The external plumbing and external plaster, elevation, 20Yo completion of terraceswith waterproofing of the Building/Wing, lnstaIatienef{ifis, water pumps, Fire+ightin€Fi$if,g,s€f,+ eq++ipmen+as+ere+grce , Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 15Yo lobby/s, plinth protection, paving of areas appurtenantto Building/!Ving, CompoundWalland allotherrequirementsas may be required to 0btain 0ccupation /Completion Certificate : Table B (lnternal & External Development Works in Respect of the entire Registered Phase) PROPOSED Yo OF sR.NO. TASKS / ACTIVITY DETAILS (YES/NO) WORKOONE As per drawings by 0'r lnternal Roads & Footpaths Yes 00% Consultants As per drawings by 02 Water Supply Yes 00% Consultants Sewerage (chamber, lines, As per drawings by 03 Yes 00% Septic Tank, STP Consultants As per drawings by 04 Storm Water Drains NO 0o/o Consultants Landscaping & Tree As per drawings by 05 Yes 00Yo Planting Consultants As per drawings by 06 Aggregate Area of Yes 0o/o Recreational open Space Consultants As per drawings by 07 Street Lighting Yes 0o/o Consultants 08 Community Buildings No 0o/o Not Applicable Treatment and disposal As per drawings by 09 of sewage and sullage NO 0o/o Consultants water Solid Waste management & As per drawings by 10 Disposal Yes 00% Consultants As per drawings by 11 Water conservation, Rain Yes 00Yo water harvesting Consultants As per drawings by 12 Energy management NO 0o/o Consultants Fire protection and fire As per drawings by 13 safety requirements NO 0o/o Consultants Electrical meter room. Sub- As per drawings by 14 station, receiving station NO 0o/o Consultants As per drawings by '15 others. Compound Wall YES 00% Consultants (f Overall project completionis 55.00% & 00.00% for internal & external development works. Yours d.l ,<\cr' loW AR. SAMEER (License No. CA Aoreed & acceoted bv. ' PADIr{ANABH DEUETOPERs c atl; PARTilEN" PARTNER Name :M/s. PADMANABH DEVELOPERS Date:1010412024