Architects lnteior Desiqners Project Consultants synergj/ 3 .ui .orlan ^ FORM 'l [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money ftom Designated Account- Building/Wng wise) Dale. 1210112024 To, M/s. PADMANABH DEVELOPERS, OFF NO 101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD. Subject: Certificate of Cost lncurred for Development of Construction Workof PTojectELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Ref: RERA Registration No. P51500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number MAHA RERA Registration No. PSl500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Al TO A8, 89 TO 815, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-C, Disha srushti,0pp. HotelAtithi, Rananagar, Jalna Rd, Chh. Sambhajinagar, tvaharashtra - 431005 qr191 240 2451 6l 6X inlo@samilarchitects.com Table A (Al TO A8 Building) (To be prepared separately for each Building M/ing of the Project) Al TO A8 Building (OcT TO DEC 2023) TASKS / ACTIVITY O/" SR.NO. OF WORKDONE 01 Excavation 100% 0? 0'l Number of Plinth 100% 03 00 Number of Basement Floor lYo 04 00 Number of Stilt Floor lYo 05 03 Number of Slabs of Super Structure 100% lnternal walls, lnternal Plaster, Flooringswithin Ub Flats/Premises, Doors and Windows to each of the 7lYo FlaVPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 30% within the FlaVPremises Staircases, tifr6-lA/ell8 and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 7lYo Water Tanks no The external plumbing and external plaster, elevation, 1SYo completion of terraces with waterproofing of the BuildingMing, lnstallatieneflifts, water pu m p s, Fire#ighting#itingsand gqcipm€f,ta$p€r€f4NOe, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 100/o lobby/s, plinth protection, paving of areas appurtenantto Building/VVing, Compound Walland allother requirements as may be required to 0btain Occupation /Completion Certillcate Table A (B9 TO Bl5 Building) (To be prepared separately for each Building /Wing of the Project) 89 TO 815 Building (OCT TO DEC 2023) SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100% 02 01 Number of Plinth 1000k 03 00 Number of Basement Floor lYo 04 00 Number of Stilt Floor lYo 05 03 Number of Slabs of Super Structure 100% nternalwalls, lnternal Plaster, Flooringswithin I 06 Flats/Premises, Doors and Windows to each of the 70o/o FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 30% within the FlaUPremises Staircases, tifts-lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 70% Water Tanks 09 The external plumbing and external plaster, elevation, 150k completion of terraceswith waterproofing of the Building/VVing, lnstallatieneflifrs, water pumps, F.ireFigrhling'Fi$ingsan4 Squipmen+aspere+O+OC, Electrical fittings to Common Areas, eleclro, mechanical equipment, Compliance to 10 conditionsof environment/CRZ NOC, Finishing to entrance 100k lobby/s, plinth protection, paving of areas appurtenantto Building/Wing, CompoundWalland allotherrequirementsas may be required to 0btain 0ccupation /Completion Certillcate Table A (Cl6 TO C23 Building) (To be prepared separaiely for each Building /Wing of the Project) c'|6 TO C23 Building (OCT TO DEC 2023) sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 1000k 02 0'l Number of Plinth 100o/o 03 00 Number of Basement Floor lYo 04 00 Number of Stilt Floor 0o/o 05 03 Number of Slabs of Super Structure 1000k I nternalwalls, lnternal Plaster, Flooringswithin Ub Flats/Premises, Doors and Windows to each of the 60% FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Eleckical Fittings 15o/o within the FlaUPremises Staircases, tifrs-lA/elle and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 45% Water Tanks 09 The external plumbing and external plaster, elevation, 10% completion of terraces with waterproofing of the Building/vving, 11 As per drawings by Water conservation, Rain Yes 00% water harvesting Consultants As per drawings by 12 Energy management NO 00 Consultants Fire protection and fire As per drawings by 13 safety requ irements NO 00k Consultants Electrical meter room. Sub- As per drawings by 14 station, receiving station NO 0o/o Consultants Others.& Compound Wall As per drawings by 15 YES 00% Consultants Overall project completion is 50.00% & 00.00% for internal & external development works. #3t For AR. SAMEER N. AUSEKAR G;d, (License No. CA 95/19301) Aoreed & acceoted bv. PA 0 il A N A B H.D-EI|(LO P E RS pARTrEt' ,^.r,rr. Name :M/s. PADMANABH DEVELOPERS Oate:1210112024