,rrffifl$d:iii :m FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- BuildingMing wise) Date: 09/10/2023 To, M/s. PADMANABH DEVELOPERS, OFF NO 1O'I/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD, Subject: Certificate of Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being devetoped by M/s. PADMANABH DEVELOPERS. Ref: RERA Registration No. p51SOOO324S9 Sir l/ We SAMIL ARcHlrEcrs have undertaken assignment of certifying percentage of completion of Construction Work of project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for each of the buildingMing of the Real Estate project as registered vide number MAHA RERA Registration No. p515000324s9 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Al TO A8, 89 TO Bis, C16 TO C23 and overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh'C, Disha Srushti, 0pp. Hotel Atithi, Rananagar, Jalna Rd, Chh. Sambhajinagar, Maharashtra - 431005 S +9'l 240 24516168 info@samilarchitects.com Table A (A'l TO AB Building) (To be prepared separately for each Building M/ing of the Project) lr fO lA Building (JUL TO SEPT 2023) TASKS / ACTIVITY 01 Number of Plinth 00 Number of Basement Floor O0 Number of Stilt Floor Og tturnfer of Stabs of Super Structure lrLterrratwattaLnterrratpt'aster,Flooringswithin Flats/Premises. Doors and Windowsto each of the SariltaryTftG wftm the Fht/Premises, Electrical Fittings within the FlaUPremises @teach Floorlevel connecting Staircases and Lifts' Overhead and Underground pfumbing and external plaster, elevatio-n' comoletion of tenaceswith waterproofing of the Building/vv lnstalla{iene{lifrs, water pu mps,+i+eFigh{in€FFitings€f,+ Equ{pm€f,+€€Per€F0+tOe, Electrical f ittings to Common Areas, electro, mechanical equipment' Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenantto Build-ing/VVing, Compound Wall and all olher requirementsas may bJrequiied to Obtain Occupation /C,.plgtion !t't'fit't' -enernal Table A (89 TO B'15 Building) (To be prepared separately for each Building /VVing of the Project) 89 TO 815 &rildins (JUL TO SEPT 2023) TASKS / ACTIVITY 01 Number of Plinth 00 Number of Basement Floor 04 00 Number of Stilt Floor 0o/o Ub 03 Number of Slabs of Super Structure 1 00 o/o lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windowstoeach of the 25Yo FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 10o/o within the FlaUPremises Staircases, tifts-lAlells and Lobbies at each Floor level 08 connecting Staircases and Lifts,overhead and Underground 1lah Water Tanks 09 The external plumbing and external plaster, elevation, 00o/o completion of terraceswith waterproofing of the BuildingMing, lnstallatien