Archite.ts lnte or Desiqnels Prcject Consultants A Syl.rgy Group companr FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- BuildingiWing wise) Date: 05/04/2023 To, M/s. PADMANABH DEVELOPERS, OFF NO .I01/,102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD, Subject: Certificateof Cost lncurred for Developmenl of Construction Work of Project ELEMENTS TERRA, IMAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Ref: RERA Registration No. P51500032459 Sir U We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingANing of the Real Estate Project as registered vide number MAHA RERA Registration No. P51500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Al TO A8, Bg TO B15, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-C, Disha 5rushti,0pp. HotelAtithi, Rananagar,.lalna Rd, Chh. Sambhajinagari Maharashtra - 43'1005 \\+91 240 24516168 info@samilarchitects.(om Table A (Al TO A8 Building) (To be prepared separately for each Building M/ing of the Project) A1 TO A8 Building (JAN TO MARCH 2023) SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100o/o 02 0'l Number of Plinth 100% 03 00 Number of Basement Floor lYo 04 00 Number of Stilt Floor 0o/o 05 03 Number of Slabs of Super Structure 30% I nternalwalls, lnternal Plaster, Flooringswithin Ub Flats/Premises, Doorsand Windowsto each of the 00% FlaVPremises 07 Sanitary Fittings within the FlaVPremises, Electrical Fittings 00Yo within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecling Staircases and Lifts, overhead and Underground 00Yo Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terraceswith waterproofing of the BuildingAA/ing, lnstallatieneflifrs, water pumps,Fire#igh{ing,Fittingsan4 Cquipmer+aspe+g+O+Oe, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 000/o lobby/s, plinth protection, paving of areas appurtenantto BuildingAlVing, Compound Walland allother requirements as may be required to 0btain 0ccupation /Completion Certillcate Table A (89 TO 815 Building) (To be prepared separately for each Building M/ing of the Project) 89 TO 815 Building (JAN TO MARCH 2023) SR.NO. TASKS / ACTIVITY % OF WORKDONE 0'l Excavation 100% 02 01 Number of Plinth 100o/o 03 00 Number of Basement Floor lYo 04 00 Number of Stilt Floor lYo 05 03 Number of Slabs of Super Structure 30o/o lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each of the 00o/o FlaVPremises UI Sanitary Fittings within the FlaUPremises, Electrical Fittings 000/o within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifts, overhead and Underground 00% Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terraceswith waterproofing of the Building/Wing, lnstallation of lifts, water pumps, Fire Fighting Fittings and Equ ipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditionsof environment/CRZ NOC, Finishing to entrance 00% lobby/s, plinth protection, paving of areas appurtenantto Building/Wing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certificate Table A (Cl6 TO C23 Building) (To be prepared separately for each Building M/ing of the Project) C16 TO c23 Building (JAN TO MARGH 2023) SR.NO. TASKS / ACTIVITY % OF WORKDONE 0'l Excavation 1000 02 01 Number of Plinth 25o/o 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor 0o/o 05 03 Number of Slabs of Super Structure 00% lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each of the 00% FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 00% within the FlaVPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 00Yo Water Tanks no The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/Wing, lnstallation of lifts, water pumps, Fire Fighting Fittings and Equ ipment as per CFO NOC, Electricalfittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment/CRZ NOC, Finishing to entrance 00% lobby/s, plinth protection, paving of areas appurtenantto Building/vving, Compound Walland allotherrequirementsas may be required to 0btain Occupation /Completion Certificate 'ii (lnternal & External Development Works in hespect of the entire Registered Phase) PROPOSED ',,.% OF sR.NO. TASKS / ACTIVITY DETAILS (YES/No) WORKOONE As per drawings by 01 lnternal Roads & Footpaths Yes 00% Consultants As per drawings by 02 Water Supply Yes 00% Consultants Sewerage (chamber, lines, As per drawings by 03 Yes 00Yo Septic Tank, STP Consultants As per drawings by 04 Storm Water Drains NO lYo Consultants Landscaping & Tree As per drawings by 05 Yes 00% Planting Consultants As per drawings by 06 Aggregate Area of Yes 0% Recreational open Space Consultants As per drawings by 07 Street Lighting Yes 1Yo Consultants 08 Community Buildings No lYo Not Applicable Treatment and disposal As per drawings by no NO 0o/o of sewage and sullage Consultants water Solid Waste management & As per drawings by 10 Disposal Yes 00% Consultants As per drawings by 11 Water conservation, Rain Yes 00% water harvesting Consultants As per drawings by 12 Energy management NO 0o/o Consultants Fire protection and fire As per drawings by 13 safety requ irements NO 0o/o Consultants Electrical meter room. Sub- As per drawings by 14 station, receivrng station NO 0o/o Consultants As per drawings by 15 Others. Compound Wall YES 00% Consultants #$ Overall project com & 00.00% for internal& external development works. AR. SAMEER (License No. CA 95/19301) Agreed & accepted bY' ,oDronoBH DEvELopERs PrRrt{E#5P Name : M/s. PADMANABH DEVELOPERS '^t"" Date : 05/04/2023