,rTll:I**i =t lH FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account- BuildingMing wise) Dale:1110112023 To, M/s. PADMANABH DEVELOPERS, OFF NO 10,1/102, MALGEMAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD, Subject: Certificate of Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Ref: RERA Registration No. P51500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, IMAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number MAHA RERA Registration No. P51500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building A1 TO A8, 89 TO B15, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-C, Disha 5rushti,0pp. HotelAtithi, Rananagar, ralna Rd, Chh. Sambhajinagar, lvaharashtra - 431005 qr191 240 245161 6X info@samilar(hitects.com Table A (Al TO A8 Building) (To be prepared separately for each Building M/ing of the Proiect) A1 TO A8 Building (OCT TO DEC 20221 SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100% 02 0l Number of Plinth 00% 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor 00k 05 03 Number of Slabs of Super Structure 00% lnternalwalls, lnternal Plaster, Flooringswithin 06 00% Flats/Premises, Doors and Windows to each ofthe FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 00% within the FlaVPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 00% connecting Staircases and Lifls,Overhead and Underground Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/Iving' lnsta{eti€f,€f+ifrs, water pum ps,FireFEh{if,g+i$ing'san+ E{sipm€n+€€p€F€Fo+loe, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 00% conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenantto BuildingMing, CompoundWalland allotherrequirementsas may be required to Obtain 0ccupation /Completion Certificate Table A (B9 TO 815 Building) (To be prepared separately for each Building /Wing of the Project) Bg TO 815 Building (OCT TO DEC 20221 sR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 100o/o 02 0l Number of Plinth 00% 03 00 Number of Basement Floor 00k 04 00 Number of Stilt Floor 0o/o 05 03 Number of Slabs of Super Structure 00% lnternalwalls, lnternal Plaster, Flooringswithin Ub Flats/Premises, Doors and Windowstoeach of the 00% FlaUPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 00% within the FlaVPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifls, Overhead and Underground 00o/o Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terraceswith waterproofing of the Building/vving, lns{allatieneflifts, water pu m ps,+ire+.ightif,g.Fi$if,g6€nd Eq{+ipme+t€sp€+eFO{Oe, Electrical fittings to Common Areas, electro, mechanrcal equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 00% lobby/s, plinth protection, paving of areas appurtenanlto Building/Wing, Compound Walland allother requ irements as may be required to Obtain Occupation /Completion Certificate Table A (C16 TO C23 Building) (To be prepared separately for each Butlding /Wing of the Project) C16 TO C23 Building (OCT TO DEC 20221 sR.NO. TASKS / ACTIVITY % OF WORKOONE 01 Excavation 50Yo 02 0'l Number of Plinth 00% 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor lYo 05 03 Number of Slabs of Super Structure 00% lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each of the 00% FlaUPremises 07 Sanitary Fittings within the FlauPremises, Eleckical Fittings 00% within the FlaVPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifts,Overhead and Underground 00Yo Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terlaces with waterproofing of the Building/Wing, lnste+le{i€n€flifts, water pu m p s, Fire+Ehtin€'Fisin€€€n+ equipmentasp€r$O+loe, Electrical f ittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 00% lobby/s, plinth protection, paving of areas appurtenantto Building/}Ving, Compound Walland allother requ irements as may be required to Obtain Occupation /Completion Certificate Table B (lnternal & External Development Works in Respect of the entire Registered Phase) PROPOSED %oF SR,NO. TASKS / ACTIVITY DETAILS (YES/NO) WORKOONE As per drawings by 01 lnternal Roads & Footpaths Yes 00% Consultants As per drawings by 02 Water Supply Yes 00% Consullanls Sewerage (chamber, lines, As per drawingS by 03 Yes 00% Septic Tank, STP Consultants As per drawings by 04 Storm Water Drains NO QYo Consultants Landscaping & Tree As per drawings by 05 Yes 00% Planting Consultants As per drawings by Ub Aggregate Area of Yes lYo Recreational open Space Consullants As per drawings by 07 Street Lig hting Yes 0o/o Consultants 08 Community Buildings No lYo Not Applicable Treatment and disposal As per drawings by 09 of sewage and sullage NO lYo Consultants water Solid Waste management & As per drawings by 10 Disposal Yes 000/o Consultants Water conservation, Rain As per drawings by 11 Yes 00% water harvesting Consultants As per drawings by 12 Energy management NO 0o/o Consultants Fire protection and fire As per drawings by 1a safety requirements NO 0o/o Consultants Electrical meter room. Sub- As per drawings by 14 station, receiving station NO 00k Consultants Others. Compound Wall As per drawings by 15 YES 00o/o Consultants Overall project com pletion & 00.00% for internal & external development works. ieB N.4\ Yours l-^.YS AR. SAMEE (License No. CA 9301) Aoreed & acceDted bv. PADtIAilABH DEVELOpERs PARTilrRd4:.r-,: Name : M/s. PADMANABH DEVELOPERS Date : 1'110112023