Architects I lntedor Desiqne6 | Proiect Consultants I a sy 9yG,ouo comDaiy FORM 1 lsee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- BuildingMing wise) Dale.0810412022 To, M/s. PADMANABH OEVELOPERS, OFF NO ,101/102, MALGE MAJESTIC, SUTGIRNI ROAD, GARKHEDA, AURANGABAD. Subject: Certificateof Cost lncurred for Development of Construction Work of Project ELEMENTS TERRA, IMAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Ref: RERA Registration No. P51500032459 Sir l/ We SAMIL ARCHITECTS have undertaken assignment of certifying Percentage of completion of Construction Work of Project ELEMENTS TERRA, [MAHA RERA Registration No. P515000324591 being developed by M/s. PADMANABH DEVELOPERS. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this ce(ificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number MAHA RERA Registration No. P51500032459 is, as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Al TO A8, 89 TO B15, C16 TO C23 and Overall Percentage of work done with respect to each Building is detailed in the Table B. Nishigandh-c, Disha srushti, opp. Hotel Atithi, Rananagar, ,alna Rd, chh. sambhajinagar, rvaharashtra - 43r 005 t:\ +9r 2451 61 6X info@samilar(hitects.com Table A (A1 TO A8 Building) (To be prepared separately for each Building /VVing of the Project) A1 TO A8 Building (JAN TO MARCH 2022) SR.NO, TASKS / ACTIVITY % OF WORKDONE 01 Excavation 50% 02 01 Number of Plinth 00% 03 00 Number of Basement Floor 0o/o 04 00 Number of Stilt Floor 0o/o 05 03 Number of Slabs of Super Structure 00% lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows to each ofthe 00% FlaUPremises 07 Sanitary Fittings within the FlaVPremises, Electrical Fittings 00o/o within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 00% Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of tenaces with waterproofing of the Building/\/Ving, lns{allatkme{.lifis, water pu m p s, €ireEightingEiflingsand gqsipm€fi{€sp€fW, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment /CRZ NOC, Finishing to entrance 00% lobby/s, plinth protection, paving of areas appurlenantto Buildingll/Ving, Compound Walland allotherrequ irements as may be required to Obtain 0ccupation /Completion Certificate Table A (B9 TO 815 Building) (To be prepared separately for each Building /VVing of the Project) 89 TO 815 Building (JAN TO MARCH 2022) SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 50% 02 01 Number of Plinth 00% 03 00 Number of Basement Floor 0% 04 00 Number of Stilt Floor 00k 05 03 Number of Slabs of Super Structure 000/o lnternalwalls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windowsto each of the 00o/o FlaVPremises 07 Sanitary Fittings within the FlaUPremises, Electrical Fittings 00% within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifts, Overhead and Underground 00o/o Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/vving, lnsla{atien€flifrs, water pu m ps, Fir€EEh{ing-Fi{ing€€n+ Eqsipm€n+e€fe+eFo{og, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to '10 00% conditions of environment /CRZ NOC, Finishing to enkance lobby/s, plinth protection, paving of areas appurtenantto BuildingM/ing, Compound Walland allother requirements as may be required to 0btain 0ccupation /Completion Certiflcate Table A (Cl6 TO C23 Building) (To be prepared separately for each Building M/ing of the Project) C16 TO c23 Building (JAN TO MARCH 2022) SR.NO. TASKS / ACTIVITY % OF WORKDONE 01 Excavation 000h 02 0l Number of Plinth 00% 03 00 Number of Basement Floor 0%o 04 00 Number of Stilt Floor 0% 05 03 Number of Slabs of Super Structure 00% lnternal walls, lnternal Plaster, Flooringswithin 06 Flats/Premises, Doors and Windows toeach of the 00% FlaUPremises UI Sanitary Fittings within the FlaUPremises; Electrical Fittings 00% within the FlauPremises Staircases, Lifts Wells and Lobbies at each Floor level 08 connecting Staircases and Lifls, overhead and Underground 00% Water Tanks 09 The external plumbing and external plaster, elevation, 00% completion of terraceswith waterproofing of the Building/Wing, lnstallatienefl{s, water pu m ps, EireFigh{ing#ittingsand eqsipmef,+a6f€+-$4Noe, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 10 conditions of environment/CRZ NOC, Finishing to entrance 00% lobby/s, plinth protection, paving of areas appurtenantto Building/Wing, Compound Walland allother requirements as may be required to 0btain Occupation /Completion Certillcate Table B (lnternal & External Development Works in Respect of the entire Registered Phase) PROPOSED %oF sR.NO. TASKS / ACTIVITY DETAILS (YES/NO) WORKDONE As per drawings by 01 Internal Roads & Footpaths Yes 00% Consultants As per drawings by 02 Water Supply Yes 00% Consultants Sewerage (chamber, lines, As per drawings by 03 Yes 00% Septic Tank, STP Consultants As per drawings by 04 Storm Water Drains NO lYo Consultants Landscaping & Tree As per drawings by 05 Yes 00% Planting Consultants As per drawings by 06 Aggregate Area of Yes 0o/o Recreational open Space Consultants As per drawings by 07 Street Lighting Yes 0o/o Consultants 08 Community Buildings No 0o/o Not Applicable Treatment and disposal As per drawings by 09 of sewage and sullage NO 00 Consultants water Solid Waste management & As per drawings by 10 Disposal Yes 00% Consultants Water conservation, Rain As per drawings by 11 Yes 00% water harvesting Consullants As per drawings by 12 Energy management NO 1ak Consultants Fire protection and fire As per drawings by 13 safety requirements NO 0% Consultants Electrical meter room. Sub- As per drawings by 14 station, receiving station NO 0o/o Consultants Others & Compound Wall As per drawings by 15 YES 01Yo Consultants Overall project com & 0.00% for internal & external development works. ffi rt.l \) -*a AR. AU (License No. CA e301) Agreed & accepted by, PADMATIABH -Dq{+oPER9 Nit PARTTIER PARTilER Name: M/s. PADMANABH DEVELOPERS Dale :0810412022