MANGGAL DESIGN ARCHITECTS & INTERIOR DESIGNER Annexure A FORM 1 (See Regulation 3] ARCHITECT'S CERTIFICATE Registration of Ongoing Project &for Withdrawal of (To be submitted at the time of Money from Designated Account) Date:08-01-2024 To, PVT LTD, NABHRAJ BUILDERS AND DEVELOPERS 735, Nabhraj Nandanvan, Opposite Airport, Chikalthana, Chhatrapati Sambhaji Nagar (Aurangabad), of Construction Work of Subject: Certificate of Percentage of Completion MahaRERA Registration Number NABHRAJ TRILOK HEIGHTS having NABHRAJ BUILDERS AND P51500032020 being developed by DEVELOPERS PVT LTD. Sir. assignment as Architect/ Licensed Surveyor of |/We Mangal Design have undertakenof Construction Work of NABHRAJ TRILOK Certifying Percentage of Completion Registration Number P51500032020 being developed by HEIGHTS having MahaRERADEVELOPERS PVT LTD. NABHRAJ BUILDERS AND Building/Wing of the Based on the Site Inspection, with respect to the Layout / each the Percentage as on date of this Certificate, aforesaid Real Estate Project, Icertify that Wing of the Real Estate Project under Building / of Work Done for each of the below. The percentage of work executed with MahaRERAis as per Table-A1-A5 herein entire Phase is detailed in Table-B. respect to each of the activity of TABLE-A-1 WING -A Tasks / Activity Percentage of Actual Work Done No. (As on date of the Certificate) (3) (2) (1) 1 1 Excavation 100% 2 Basements (if any) NA. 3 Podiums (if any) NA. Plinth 100% Stit Floor 100% 6 Slab of Super Structure 100% 7 Internal Walls, Internal Plaster, Floorings, Doors, 100% windows within Flats / Premises Sanitary Fitings within Flats / Premises 50% Staircases, Lift VWells & Lobbies at each Floor Level 80% Overhead and Underground Water Tanks 10 External Plumbing & Extenal Plaster, Elevation, 70% Completion of Terraces, with waterproofing of the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 70% and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Cemplianceto conditions of EAvirenment t GRZ NO¬, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A-2 WING -B S. Tasks /Activity Percentage of Actual Work Done No. (As on date of the Certificate) (2) (3 (1) 100% 1. Excavation N.A. 2 Basements (if any) NA. 3. Podiums (f any) 100% Plinth 100% 5 Stit Floor Slab of Super Structure 100% Plaster, Floorings, Doors, 100% 7 Internal Walls, Internal windows within Flats / Premises Sanitary Fittings within Flats /Premises 60% Staircases, Lift VWells & Lobbies at each Floor Level 80% 9 Overhead and Underground Water Tanks External Plumbing & External Plaster, Elevation, 80% 10. Completion of Terraces, with waterproofing of the Buiding / Wing 2 Installation of LIs Water Pumos Fire Fighting Fitings 80% 11 and Eguipments as per CFO N0C Electrical Ftings Mechanical Equipmerts Comptance to conditiors of Environment CRZ NOG Finishing to Entrance Lobby/s Pinth Protection Paving of Areas appurtenant to BuildingWino Compound Wal and all ofther requirements as may be required to complete Project Any other as per specifications to Agreement of Sale, Activity TABLE-A-3 WING-C Percentage of Actual Work Tasks / Activity Done No. (As on date of the Certificate) (2) (3) (1) 100% Excavation NA. Basements (if any) NA. 3 Podiums (f any) 00% Plinth 00% Stit Floor 00% Slab of Super Structure 00% 7 Internal Walls, Internal Plaster, Floorings, Doors windows within Flats /Premises 00% Sanitary Fittings within Flats /Premises 00% Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 00% 10 External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Buiiding / Wing 00% 11 Fittings Installation of Lifts, Water Pumps, Fire Fighting Fittings, and Equipments as per CFO NOC, Electrical Mechanical Equipments, Complience to conditions of Entrance Environmernt t eRZ NOC, Finishing toappurtenant Lobby/s, Plinth Protection, Paving of Areas and all other to Building/Wing. Compound Wall complete Project requirements as may be required to Sale, Any other as per specifications to Agreement of Activty TABLE-A4 WING D Tasks / Activity Percentage of Actual Work S Done No. (As on date of the Certificate) (2) (3) (1) 00% Excavation NA Basemets (if any) NA 3 Podiums (# any) 00% Plinth 00% Stit Floor 00% 6 Slab of Super Structure 00% 7 Internal Walls Internal Plaster, Floorings. Doors, windows within Flats / Premises 00% Sanitary Fittings within Flats / Premises Floor Level 00% Staircases Lif Wells & Lobbies at each Overhead and Underground Water Tanks Elevation, 00% 10 External Plumbing & External Plaster., of the Completion of Terraces, with waterproofing Building /Wing Fittings 00% 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings, Electrical and Equipment's as per CFO NOC, Mechanical Equipment's, COmplience to conditions of Evironment-GRZ NOe, Finishing to Entrance appurtenant Lobby/s, Plinth Protection, Paving of Areas and all other to Building/Wing. Compound Wall complete Project requirements as may be required to Any other of Sale, as per specifications to Agreement Activity TABLE-A-5 WING E Percentage of Actual Work S. Tasks / Activity Done No. (As on date of the Certificate) (2) (3) (1) 00% 1 Excavation N.A. 2 Basements (if any) N.A. 3 Podiums (if any) 00% 4 Plinth 00% 5 Stitt Floor 00% 6 Slab of Super Structure 00% 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats / Premises 00% Sanitary Fittings within Flats / Premiseseach Floor Level 00% Staircases, Lift Wells & Lobbies at Overhead and Underground Water Tanks Elevation, 00% 10. Exxernal Plumbing & External Plaster, the Completion of Terraces, with waterproofing of Buiiding / Wing 4 Installation of Lifts, Water Pumps, Fire Fighting Fittings 00% 11 and Equipment's as per CFO NOC, Electrical Fittings, Meçhaniest Equipments, Complianee te eondtions of Envirenment CRZ NOe,Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project other as per specifications to Agreement of Sale, Any Activity TABLE-B Works) in respect of the Registered Common Areas (Internal &External Development Phase /Project Number Details Percentage of S. Common Areas & Facilities Proposed actual Work Done (Yes /NO) No. (As on date of Certificate) (4) (5) (2) (3) Internal Project (1) Internal Roads & Footpaths YES 30% Cement Roads 1. 30% From Borewell YES Drainage Line with 2 Water Supply 50% Lines, YES Chambers STP or 3 Sewerage (Chamber, Septic Tank, STP) Biodigeter NA. Strom Water Drains NO Tree Plantation YES 00% 5 Landscaping &Tree Planting 00% Internal Project YES Street Lights 6 Street Lighting N.A. NO 7 Community Buildings 50% STP or Biodigester Treatment & Disposal of Sewage YES 8 and Sullage Water N.A. & NO Solid VWaste Management Disposal 50% Rain Water YES 10. Water Conservation / Rain Water Harvesting As per Harvesting Norms Common Solar Net Energy Management YES 11. Metering System 75% As per Norms Fire Protection & Fire Safety YES 12. requirements 30% As per MSEB Electrical Meter Room, Sub YES 13. Requirements Station, Receiving Station 14. Others (Option to Add more) Yours faithfully., 5 Land Surveyor / Architect Signature &Name (IN BLOQK \EJTERS) License Number Agreed &Accepted by: MANGGAL Ar.Pramod Vithob Narale norale pramod28grmollcom OARCO CA2011/5424 Signature of Promoter DEVELOPERS PVT LTD Name: NABHRAJBUILDERS AND Date: 08-01-2024