ofBased MahaRERAaforesaid NABHRAJ HEIGHTSS Sir, Subject: NABHRAJ Chikalthana, Opposite Airport, Chhatrapati To, Certifying 1/ Nandanvan, Nabhraj 735, Work We (To on Mangal be Done Real the BUILDERShaving Percentage submitted is SambhajiBUILDERS asEstate Site DEVELOPERS LTD. PVT P51500032020Certificate NABHRAJ per for MahaRERA Design Inspection, each at Table-A1-A5Project, AND have of Nagar AND the of Completion TRILOK of Money time DEVELOPERS the undertaken DEVELOPERS (Aurangabad), ARCHITECT' CERTIFICATE S Registration certify wiIth Percentage being of Building herein Registration from Regulation (See 3] respect HEIGHTS that of developed FORMAnnexure 1 A assignment Designated below. 1 Number as Construction of / Wing onto PVT PVT the having Completion of The date LTD. LTD, Ongoing of Layout P51500032020 as by Account) percentage the of MahaRERA this Architect Work NABHRAJ 10-07-2023 Date: ARCHITECTS / Project MANGGAL DESIGN Real Certificate,each of of Construction of Estate Licensed Surveyor / of & Building/Wing being NABHRAJ Registration for & work BUILDERS INTERIOR VWithdrawal executed Project the developed Percentage DESiGNER of TRILOK NumberWork under with AND of the by of respect No. S. 11. 10. 7 6 5 4 3 2 1(1) No. 6. 5. 4. 3. 2. 1.(1) S Excavation windows Excavation StitPlinth to Floor Stift Plinth Basements Podiums any)(ífany)(if Activity asLobby/s, requirements andCompletion to Installation Mechanical Overhead Staircases, andSanitary Internal SlabFloor Podiums Basementsany)(if any)(if each Slab Eqvirenment BuildingExternal per BuildingWing, of of Equipments of Super Super specifications Plinth Wing / Fittingswithin the ofPlumbing Lift Walls, activity Structure as Equipments, Lifts, of Structure Protection, t Underground Water Tanks Wellswithin Flats may CRZ asTerraces, Internal Activity Tasks / Compound Water / Activity Tasks / of to be per & Premises & Flats entire (2) Agreement required Paving CFO NO¬, Pumps, ExternalLobbies (2) TABLE-A-2 Cempliance- with / TABLE-A-1 Phase Premises Plaster, WING -B Finishing NOC, WING-A 2 Wal of waterproofing at Fire Plaster, is of toAreas Electrical complete each Floorings, detailed Sale, other Any and Fighting to appurtenant to conditions Floor alEntranceFittings, Elevation, in Project Fittings of Level Table-B. other Doors, the of Percentage Percentage (As (As Certificate) on Certificate) on 100%100%100% N.A. N.A100% . 00% 00% 00% 00% 40% 100%100% 100% N.A. N.A100% . Done (3) date Done of (3) date of Actual Actual of of the the Work Work 7 Internal Walls, Internal Plaster, Floorings, Doors, 30% windows within Flats / Premises 0% 8 Sanitary Fittings within Flats /Premises 9 Staircases, Lift Wells & Lobbies at each Floor Level 0% Overhead and Underground Water Tanks 0% 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building / Wing 0% 11. Installation of Lifts, Water Pumps, Fire Fighting Fitings and Equipments as per CFO NOC, Electrical Fitings, Mechanical Equipments, Complienee te eOndition of ERyireAment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-A-3 WING-C Percentage of Actual Work Tasks / Activity Done No. (As on date of the Certificate) (2) (3) (1) 100% 1 Excavation N.A. 2 Basements (if any) N.A. 3 Podiums (if any) 00% 4 Plinth 00% 5 Stit Floor 00% 6 Slab of Super Structure 00% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats / Premises 00% 8 Sanitary Fittings within Flats I Premises 00% 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 00% 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building / Wing 3 00% 11. Installation of Lifts, Water Pumps, Fire Fighting Fitings and Equipments as per-CFONOe; Electrical Fitings, Mechanical Equipments, Compiance to Conditions of Enviroment GRZ NOG, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall complete and all other requirements as may be required to Project Any other as per specifications to Agreement of Sale, Activity TABLE-A-4 WING D Percentage of Actual Work Tasks I Activity Done S. No. (As on date of the Certificate) (3) (2) 00% (1) NA. Excavation Basements (if any) N.A. 2 Podiums (if any) 00% 3 Plinth 00% 4 Stilt Floor 00% 5 Slab of Super Structure 00% 6 Plaster, Floorings, Doors, 7. Internal Walls, Internal windows within Flats / Premises 00% Sanitary Fittings ithin Flats / Premises 00% 8. & Lobbies at each Floor Level 9. Staircases, Lift VWells Water Tanks Overhead and Underground Plaster, Elevation, 00% External 10. External Plumbing & waterproofing of the Completion of Terraces, with Building / Wing Fighting Fittings 00% 11. Installation of Lifts, Water Pumps, FireElectrical Fittings, NOC, and Equipment's as per CFO COpliance to conditions of Mechanical Equipment's, NOC, Finishing to Entrance ERvironment t CRZ of Areas appurtenant Lobby/s, Plinth Protection, PavingWall and all other to Building/Wing, Compound complete Project requirements as may be required to Sale, Any other Agreement of as per specifications to Activity TABLE-A-5 WING E 4 Tasks / Activity Percentage of Actual Work S. Done No. (As on date of the Certificate) (2) (3) (1) 00% 1. Excavation N.A. 2 Basements (if any) N.A. 3 Podiums (f any) 00% Plinth 00% 5 Stit Floor 00% 6 Slab of Super Structure 00% Floorings, Doors, 7 Internal Walls, Internal Plaster, windows within Flats /Premises 00% Premises 8 Sanitary Fittings within Flats/ at each Floor Level 00% Staircases, Lift Wells & Lobbies 9. Water Tanks Elevation, Overhead and Underground External Plaster, 00% 10. External Plumbing & waterproofing of the Completion of Terraces, with 00% Building / Wing Pumps,Fire Fighting Fittings 11. Installation of Lifts, Water CFO NOC, Electrical Fittings, and Equipment's as per Comptiance to condittons of Mechanical Equipment's, Entrance Eqvirenment GRZ NOe, Finishing toappurtenant Paving of Areas Lobby/s, Plinth Protection, Compound Wall and all other Building/Wing, to required to complete Project requirements as may beAgreement of Sale, Any other to as per specifications Activity TABLE-B Registered External Development Works) in respect of the Common Areas (lnternal & Phase / Project Number Details Proposed Percentage of S. Common Areas & Facilities (Yes / NO) actual Work Done No. (As on date of Certificate) (4) (5) (2 (3) 30% Internal Project (1) YES Cement Roads 1. Internal Roads & Footpaths 30% From Borewell YES Drainage Line with Water Supply YES 0% Sewerage (Chamber, Lines, Chambers STP or Septic Tank, STP) Biodigeter N.A. Strom Water Drains NO Tree Plantation 4. YES 00% 5. Landscaping &Tree Planting 00% Internal Project YES 6. Street Lighting Street Lights 5 NO N.A. 7 Community Buildings STP or Biodigester 8 Treatment & Disposal of Sewage YES 00% and Sullage Water NA. 9 Solid Waste Management & NO Disposal 00% Rain Water 10. Water Conservation / Rain Water YES Harvesting As per Harvesting Norms Common Solar Net 11. Energy Management YES Metering System YES 00% As per Norms 12. Fire Protection & Fire Safety requirements As per MSEB Electrical Meter Room, Sub YES 00% 13. Station, Receiving Station Requirements 14. Others (Option to Add more) Yours faithfully. Signature &Name (IN BLOCK LETTERS) of Land Surveyor / Architect License Number ( Agreed &Accepted by. MANGGAL Ar.Pramod Vithoba Narole ARamal.com narale.promod28@gr (BARCH) CA/2011/59824 Signature of Promoter LTD Name: NABHRAJ BUILDERS AND DEVELOPERS PVT Date: 10-07-2023 6