ANNEXURE A FORM-2A 2023-2024 ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE Date: 13-09-2026 To, The MAHADEO GOVARDHAN MORALE FLAT NO 06, BALAJI TOWER, JAYBHAVANI NAGAR Aurangabad (M Corp.) Quality Assurance Certificate (Certificate No. 1 5 1 for the year ending 2023-2024) Subject : Certificate for quality of materials used and quality of construction and workmanship for the work of < SAI TARANGAN > having MahaRERA Registration Number P51500031851 being developed by MAHADEO GOVARDHAN MORALE Sir, I / We Pradeep V Mote have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No. 1 Whether soil investigations of the site has been Yes ___ Soil testing is Carried out by Civil conducted before the structural design and soil Tech Lab. parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been appointed Name: Iftekhar Ahmed for the project? Yes ____ License No: STATE/R/2024/APL/12997 Mobile:9423028563 Email:jvstructural@rediffmail. com 3 Whether the inspection registers, site order Yes ____ Concrete Cube Test and Steel test book and quality control test registers are area carried out by Civil Tech Lab maintained at the site properly and endorsed by (NABL Approved) the Engineer–in-Charge? 4. Whether testing facilities to check quality of Yes ____ material is available at site? 5. Whether the statuary provisions for disaster resistance/ Yes ___ RCC Design is per earthquake resistant design have been incorporated, Earthquake specially in case of multi-storeyed construction? resistance as Per IS 1893 Code 6. Has suitable cognizance been taken on demarcated flood NA ____ lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. Parameters Yes No Remarks No. 1 Whether the following building materials confirm to ____ relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes ___ IS 269,456, 383 (b) Steel and its alloys Yes ____ IS 7598 (c) Electrical wire, fittings and accessories Yes ____ IS 732 (d) Plumbing and sanitary fittings Yes ____ IS 2065 2 Whether regular tests of materials and construction Yes ___ Civil Tech Lab products are being done from accredited labs also? If yes, (NABL Approved) details of such labs 3 Whether manufacturer test certificate for cement, steel, Yes ___ ___ pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for construction? Yes ___ Bore (i) What is the source of water? Water (ii) Has water been tested and approved by Engineer-in- Charge before construction? (iii) Has water been tested subsequently as per requirement? 3. Quality of Workmanship Sr. Parameters Yes No Remarks No. 1 Whether works of all the electrical wiring/ connections/ NO lift installation / other electrical installations have been carried out under authorized /registered electrical engineer and whether records of the same has been maintained? 2. Whether all related works of plumbing & sanitary Yes ____ including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3. Whether all the work is being carried out under Yes _____ supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4. Whether remedial measures are undertaken to prevent Yes Application of water dampness and leakages ? If yes, provide details prrofing Chemical 5. Whether safety precautions are undertaken during Yes construction activities for all type of workers ? 4. Miscellaneous Sr. Parameters Yes No Remarks No. 1 Whether third party quality inspection is being carried out No on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken for Yes ___ the soil? 3 Whether fire-fighting arrangements has been undertaken Yes ____ under supervision of fire consultant? 4 Whether proper signages have been installed on site/ Yes ___ Proper Fencing completed building as per requirement? 5 Whether precautions are undertaken to avoid air pollution Yes _____ during construction? Please specify. 6 Whether records of all test reports / results have been Yes ____ properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned building Yes ____ plans, utility drawings, various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/ cost effective/ green technology has been No used for improving quality/energy efficiency? Please specify Yours Faithfully, Signature of Engineer (Site Supervisor) Name : Pradeep V Mote Qualification : BE Licence No : DDMMCB/R/2021/APL/01141 Mob No : 9422213027 Place: Aurangabad Agreed and accepted by Signature of Promoter Name : MAHADEO GOVARDHAN MORALE Date : 13-09-2026