Er. Balasaheb Devkate Diploma Civil Engg. Annexure - B FORM - 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawa-l of Money from Designated BaIk Account) Date: 03-01-2025 To, RIDDHI VIYAAN VENTURES, PLOT NO 40, SECTOR N.3, CIDCO, AURANGABAD Subject: Certificate of Cost lncurred for Development of VIyAAN ANANTA having MahaRERA Registration Number P51500032300 being developed by RIDDH| VIYAAN VENTURES. (For Oct to Dec 2024 QTR) Sir, 1 . I / We Er. Balasaheb Devkate have undertaken assrgnment of Certifying Estimated Cost for VIYAAN ANANTA having MahaRERA Registration Number psl SOOO323OO being developed by RIDDHI VIYAAN VENTURES. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & elternal works of the project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the project under Reference by the Developers / Consultants. The Schedule of ltems & euantity required for the entire work as calculated by Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. a We estimate Total Estimated Cost of completion of the aforesaid project mentioned under reference at Rs. 19,08,54,2791 (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEp & Altied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) / Wing(s) t layout t Plotted Development from the AURANGABAD MUNtCtpAL CORPORATTON AURANGABAD being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. Er. Balasaheb Devkate Diploma Civil Engg. 4. The Estimated cost incurred till date is calculates to Rs. 12,40,55,2811 [rotal of Table A & B). The Amount of .E$imeted...9..s.s,!...1.ns-u.ne.d.j.c...Bte.u.!.a!9d..9n...th.e..be.9!s..9.f. j.np.6 I m.?tcnelg/.9e!v!ees.!.ls9.d..q,un!!.99.sJ..o,f .th.e-s.e.ltems. 5. The Balance cost of completion of the civil, MEP & Allied works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of sale, of the aforesaid Poect is estimated at Rs. 6,67,98,998/- Cl-otal of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / WnS I Layout / Plotted Development bearing Number- Block A to Block F and BLOCK G WING G1 AND G2 S. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of Building / Wing / Layout / Rs. 18,17,65,9804 Plotted Development as on date of Registratiqn !e 2. Cost incurred as on date of Certificate Rs. 1 1,81,47,887/- 31 December 2024 J. Work Done in Percentage (as Percentage of 65% Estimated Cost) 4. -- Balance Cost to be incurred ((based on Rs.6,36,18,0931 Estimated Cost) Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) TABLE - B InternaL & External Development Works in respect of Registered Phase Block A to Bloek F and BLOCK G WING G1 AND G2 S. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of lnternal & External Rs. 90,88,2991 Development Works including amenities & facilities in the Lavout as on date of Registration is 2. Cost incurred as on date of Certiflcate Rs. 59,07,3941 31 December 2024 J, Work Done in Percentage (as Percentage of 65% Estimated Cost) Balance Cost to be incurred "- ((based on Rs. 31,80,905/- Estimated Cost) 5. Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) Er. Balasaheb Devkate Diploma Civil Engg. Yours faithfu y, I Er. Balasaheb d-evkate Signature & Name (tN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number (if Agreed & Accepted by: ,'tfn l> Signature of promoter Name: RIDDHI VtyAAN VENTURES ffi 4f, Date: 03-01-2025 Note: l The scope of work is to comprete Registered Rear Estate project approved from time to time as per specifications as per drawings mentioned in tn" ngr""r"nt io Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent euantity surveyor, who,s certificate of-euantity calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer' the name has to.be meniioned at'irre'prace marked (-) & in case quantity are being carcurated by office of Engineer, rhe name of person in the office of Engineer, who is responsibre for the qr"itity shourd be mentioned at the-place marked ("). ".rcri"ted 3' (*") Barance cost to be incurred (4) may vary from difference Estimated cost (1) & actuar cost incurreo (i; between Totar oue to aeviation in quantity required / escalation of cost etc. Aslh:_i: an Estimated Cost any deviation quantity r."qrir"a for the Deveropment of Rear Estate project wirr resuri ii an amendment of the cost incuffed / to be incuned. 4. All components of work with specifications are indicative & not exhaustive 5' Please specifu if there are any deviations / quarifications. Exampre: input material used from specifications in Any deviation in ngreem; oi 5ab. Er. Balasaheb Devkate Diploma Civil Engg. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1. 2.