MANOJ KALA & ASSOCIATES B 301 302 Otympia, Sutgirni Chowk, ^Space Garkheda Chh Sambhaji Nagai 13tOOS uontact: +91 9637005791 | architecture@mkaa.co.in Annexure A FORM 1 [See Regulation 3l (ro be submitted at the , #;T]53,I;"?:T3lJ:flJ?,.o;u.t & for Withdrawal of Money from Designated Account) ' Date: - 05-10-2024 To, RIDDHI VIYAAN VENTURES, PLOT NO 40, SECTOR N.3, CIDCO, AURANGABAD Subject: certificate of percentage of compretion of construction work of VIYAAN ANANTA phase _ I having MahaRERA Registration Number P51500032300 being devetoped by RtDDHt VtyAAN VENTURES (Jul To Sep 2024 eTR) Sir, I / We MANOJ KALA & ASSOCTATES have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of VIYAAN ANANTA having MahaRERA RLgistration Number p51500032300 berng developed by RtDDH| VtyAAN VENTURES (Jut To Sep 2024 eTR) Based on the site rnspection, with respect to the Layout / each BuirdingA&ing of the aforesard Real Estate Project, I certify that as on date of this certificate, the Percentage of work Done for each of the BuirdrngMing of the Rear Estate project under MahaRERA is as per Tabre-A herein berow.ihe percentage of work executed with respect to each of the activity of entire phase is detailed in Table_B. Dale:05110t2024 Arc h itec Manoj Ka RegNo: MANOJ KALA & ASSOCIATES B 301 , 302 Space Olympia, Sutgirni Chowk, Garkheda, Chh. Sambhaji Nagar431005 Contact: +91 96370057811 arc-hitecture@mkaa. co. in TABLE- A Building Block A Row Houses Sr. Tasks / Activity Percentage of No. ActualWork Done (As on date of theCertificate) (1) (2t (3) 1. Excavation 100% 2 Basements (if any) ?, Podiums (if any) Plinth 100% Stilt Floor 100o/o 3 Slab of Super Structure 100o/o lnternal Walls. lnternal Plaster. Floorings. Doors. 100% windows wrthin Flats / Premises B. Sanitary Fittings within Flats / Premises 100%o I Staircases, Lift Wells & Lobbies at each FloorLevel 80% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 80% Completion of Terraces, with waterproofing of the Building / Wing 11. lnstallation of Lifts, Water Pumps, Fire FightingFittings and 80% Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobbyis, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all otherrequirements as may be required to complete Project as per specifications to Agreement of Sale,Any other Activity Date: 05/10/2024 Yours Fa Manoj Kala RegNo: CA/96/19597 2lPage MANOJ KALA & ASSOGIATES B 301, 302 Space Olympia, Sutgirni Chowk, Garkheda, Chh. Sambhaji Nagar 431005 Contact: +91 9637005781 I ar.c,hite-cJute@,tnKaa.q9, in Table - A Building Block B Row Houses Sr. No. Tasks / Activity Percentage of ActualWork Done (As on date of theCertificate) (1) (2) (3) '100% 1. Excavation 2. Basements (if any) 0 Podiums (if any) 4. Plinth 100% A Stilt Floor 100% o. 3 Slab of Super Structure 100% 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 100% windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 20o/o 9 Staircases, Lift Wells & Lobbies at each FloorLevel 70% Overhead and Underground Water Tanks 10 External Plumbing &External Plaster, Elevation, 70% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire FightingFittings 70% and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Buildingl/Vtng, Compound Wall and all otherreq uirements as may be required to complete Project as per specifications to Agreement of Sale,Any other Activity Date: 05/10/2024 Manoj Kala RegNo: CA/96/19597 3lPage MANOJ KALA & ASSOCIATES B 301, 302 Space Olympia, Sutgirni Chowk, Garkheda, Chh Sambhaji Nagar 431005 Contact: +91 9637005781 | architecturg@mkaa co.in TABLE. A Building Block C Row Houses Sr, No. Tasks / Activity Percentage of ActualWork Done (As on date of theCertificate) (1) (2t (3) 1 Excavation 100o/o 2. Basements (if any) 0 3. Podiums (if any) 4. Plinth 100o/o 5. Stilt Floor 100o/o 6. 2 Slab of Super Structure 100o/o 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 90o/o wrndows within Flats / Premises 8. . Sanitary Fittings within Flats / Premises 20o/o 9. Staircases, Lift Wells & Lobbies at each Floorlevel 7 0o/o Overhead and Underground Water Tanks 10, External Plumbing & External Plaster, Elevation, 50% Completion of Terraces, with waterproofing of the Building / Wing 11 lnstallation of Lifts, Water Pumps, Fire ighting Fittings 50% F and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingAtVing, Compound Wall and all other requirements as may be required to complete Project as per specificatrons to Agreement of Sale,Any other Activity Date:0511012024 Yours Faith 0! ,