INTERIORS FORM-2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 03/04/2020 To Choudhary Bhaishree Landmarks LLP, Office No. 321/322, Opp. MTDC Office, Beside Goldie Theatre, Railway Station Road, Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of Row house nos. 01 to 67 Building(s)/ _ Wing(s) of Villo 67 [RERA Registration No. P51500024894] situated on the Gut No 44/P, Village - ITKHEDA, TQ & DIST-Aurangabad, demarcated by its boundaries (latitude and longitude of the end points) 19° 84' 29.79" North and 75° 29' 63.31" East, to the North-15.00 m wide DP Road, South - 12.00 m wide DP Road, East - Part of Gut No 44, West - Part of Gut No 46, Taluka & dist. Aurangabad PIN 431136, admeasuring 12000.00 Sq.mt. area and proportionate open space 1100.00 Sq.mt. area being developed by Choudhary Bhaishree Landmarks LLP. Sir, We Samii Architects have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Row house nos. 01 to 67 Building of the Project Villo 67 [RERA Registration No. P51500024894] situated on the Gut No 44/P, Village - ITKHEDA, TQ & DIST-Aurangabad PIN 431136 admeasuring 12000.00 Sq.mt. area and proportionate open space 1100.00 Sq.mt. area being developed by Choudhary Bhaishree Landmarks LLP. 1. Following technical professionals are appointed by Owner / Promoter: - 1. M/s/ SAMIL ARCHITECTS (Ar. Sameer Ausekar) (Reg. No CA- 95/19301), Aurangabad as an Architect; ii. M/s CORE CONSULTANTS (Er. Rajesh Wargantwar), Aurangabad as Structural Consultant. 11P age Nishigandh - C. Disha Srushti, Opp. Hotel Atithi, Rana Nagar, Jalna Road, Aurangabad.- 43 1005 Call - +91 240 2451616 E - Mail - mfo@sam1l~ b1l.e.i:;tgQm, Web Site - www.samilarchitecs.com aff1 INTERIORS iii. Mis Consulting Electrical Engineers Combine, Pune (Er. Milind Ghate), as MEP Consultant. iv. M/s/ SAMIL INTERIORS (Er. Milind Wadekar) (Reg. No 152/92), Aurangabad as Consulting an Engineer. 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Er. Milind m. Wadekar quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 2783.71 Lakh (Rs. TWENTY SEVEN HUNDRED EIGHTY THREE POINT SEVENTY ONE LAKH ONLY) The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate I completion certificate for the building(s) from the Aurangabad Municipal Council, being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.11 .74 Lakh (Rs. ELEVEN POINT SEVENTY FOUR LAKH ONLY) The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate I Completion Certificate from Aurangabad Municipal Council (planning Authority) is estimated at Rs. 2771 .97 Lakh (Rs. TWENTY SEVEN HUNDRED SEVENTY ONE POINT NINTY SEVEN LAKH ONLY). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below. TABLE A Building / Wing bearing Number Row house nos. A 01 TO 09 (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building/ wing as on 1. Rs. 346.96 Lakh 03/03/2020 date of Registration is Cost Incurred as on 03/04/2020 (based on the Estimated 2. Rs. NIL cost) Work done in Percentage (as Percentage of the estimated 3. 00.00 % cost) 21Page Nishigandh - C, Disha Srushti, Opp. Hotel Atithi , Rana Nagar, Jalna Road , Aurangabad.- 431005 Call - +91 240 2451616 E - Mail - info@samilarchitects .com, Web Site - www.samilarchitecs.com INTERIO RS 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 346.96 Lakh Cost Incurred on Additional / Extra Items as on 03/04/2020 5. Rs. Nil not included in the Estimated Cost (Annexure-A) TABLE A Building / Wing bearing Number Row house nos. B 10 TO 17 (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building / wing as on 1. Rs. 308.51 Lakh 03/03/2020 date of Registration is Cost Incurred as on 03/04/2020 (based on the Estimated 2. Rs. NIL cost) Work done in Percentage (as Percentage of the estimated 3. 00.00 % cost) 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 308.51 Lakh Cost Incurred on Additional / Extra Items as on 03/04/2020 5. Rs. Nil not included in the Estimated Cost (Annexure-A) TABLE A Building/ Wing bearing Number C 18 TO 24 (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building/ wing as on 1. Rs. 312.26 Lakh 03/03/2020 date of Registration is Cost Incurred as on 03/04/2020 (based on the Estimated 2. Rs. NIL cost) Work done in Percentage (as Percentage of the estimated 3. 00.00 % cost) 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 312.26 Lakh Cost Incurred on Additional / Extra Items as on 03/04/2020 5. Rs. Nil not included in the Estimated Cost (Annexure-A) 31Pag e Nishigandh - C, Disha Srushti, Opp. Hotel Atithi , Rana Nagar, Jalna Road, Aurangabad.- 431005 Call - +91 240 2451616 E - Mail - 1nfo@ sarn1larchilecl s.corn, Web Site - www.samilarchitecs.com INT ER IOR S TABLE A Building / Wing bearing Number D 25 TO 32 (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building / wing as on 1. 03/03/2020 date of Registration is Rs. 273.42 Lakh Cost Incurred as on 03/04/2020 (based on the Estimated 2. cost) Rs. NIL Work done in Percentage (as Percentage of the estimated 3. cost) 00.00 % 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 273.42 Lakh Cost Incurred on Additional / Extra Items as on 03/04/2020 5. not included in the Estimated Cost (Annexure-A) Rs. Nil TABLE A Building / Wing bearing Number Row house nos. E 33 TO 40 (to be prepared separately for each Build ing /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building / wing as on 1. 03/03/2020 date of Registration is Rs. 312.50 Lakh Cost Incurred as on 03/04/2020 (based on the Estimated 2. cost) Rs. NIL Work done in Percentage (as Percentage of the estimated 3. cost) 00.00 % 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 312.50 Lakh Cost Incurred on Additional/ Extra Items as on 03/04/2020 5. not included in the Estimated Cost (Annexure-A) Rs. Nil TABLE A Build ing/ Wing bearing Number Row house nos. F 41 TO 50 (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building / wing as on 1. Rs. 390.44 Lakh 03/03/2020 date of Registration is Cost Incurred as on 03/04/2020 (based on the Estimated 2. Rs. NIL Lakh cost) 41P a ge Nishigandh - C, Disha Srushti, Opp. Hotel Atithi , Rana Nagar, Jalna Road , Aurangabad .- 43100 Call - +91 240 2451616 E - Mail - iofo@samila 5 rchite cts com, Web Site - www.samilarchite cs.com INTER IORS Work done in Percentage (as Percentage of the estimated 00.00 % 3. cost) 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 390.44 Lakh Cost Incurred on Additional/ Extra Items as on 03/04/2020 Rs. Nil 5. not included in the Estimated Cost (Annexure-A) TABLE A Building/ Wing bearing Number Row house nos. G 51 TO 59 (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building/ wing as on Rs. 313.56 Lakh 1. 03/03/2020 date of Registration is Cost Incurred as on 03/04/2020 (based on the Estimated Rs. NIL Lakh 2. cost) Work done in Percentage (as Percentage of the estimated 00.00 % 3. cost) 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 313.56 Lakh Cost Incurred on Additional / Extra Items as on 03/04/2020 Rs. Nil 5. not included in the Estimated Cost (Annexure-A) TABLE A Building / Wing bearing Number Row house nos. H 60 TO 67 (to be prepared separately for each Building /Wing of the Real Estafe Project) Sr. no. Particulars Amounts in Lakhs Total Estimated cost of the building / wing as on 03/03/2020 1. Rs. 366.95 Lakh date of Registration is 2. Cost Incurred as on 03/04/2020 (based on the Estimated cost) Rs. 11.74 Lakh 3. Work done in Percentage (as Percentage of the estimated cost) 3.20% 4. Balance Cost to be Incurred (Based on Estimated Cost) Rs. 355.21 Lakh Cost Incurred on Additional / Extra Items as on 03/04/2020 not 5. Rs. Nil included in the Estimated Cost (Annexure-A) 51P a ge Nishigandh - C, Disha Srushti, Opp. Hotel Atithi, Rana Nagar, Jalna Road, Aurangabad.- 431005 Call - +91 240 2451616 E - Mail - 1nlo@samil c1rct11 te c ~. Web Site - www.samilarchitecs.com INT ERI ORS TABLE B (to be prepared for the entire registered phase of the real estate project ) Sr. no. Particulars Amounts Total Estimated cost of the Internal and External 1. Development Works including amenities and Facilities Rs. 159.11 Lakh in the layout as on 03/03/2020 Date of Registration is Cost Incurred as on 03/04/2020 (based on the 2. Rs. NIL Lakh Estimated cost) Work done in Percentage 3. 00.00 % (as Percentage of the estimated cost) Balance Cost to be Incurred (Based on Estimated 4. Rs. 159.11 Lakh Cost) Cost Incurred on Additional/ Extra Items as on 5. 03/04/2020 not included in the Estimated Cost Rs.Nil (Annexure-A) Overall Project completion is 0.47% & 0.00% for internal & external develo pment works. Yours Faithfully, (j ~ Er. Milind m. Wadekar (Licence No/ E - 152/92) 61 Pag e Nishiga ndh - C, Disha Srushti , Opp. Hotel Atithi, Rana Nagar, Jalna Road, Aurang abad.- 431005 Call - +91 240 2451616 E - Mail - m[o@s arn1lnrc;;l1ileJ;.ls..@lll, Web Site - www.sa milarch itecs.co m