FORM 1 [see Regulation 3] ARGHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- BuildingMing wise) Date:03|MPA22 To Choudhary Bhaishree Landmarks LLP, Office No.3211322, Opp.ttiTDC ffice, Beside Goldie Theatre, Railway Station Road, Aurangabad. Subject Certificate of Percentage of Completion of Construction Work of Row house nos. 01 to 67 Building(sy_Wing(s)of Villo{7 IMAHARERA Registration No. P51500024894] being developed by Choudhary Bhaishree Landmarks LLP. Sir, We Samil Architects have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Row house nos. 01 to 67 Building of the Project Villo{7 IMAHARERA Registration No. P515000248941 being developed by Choudhary Bhaishree Landmarks LLP. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number IMAHARERA Registration No. P515000248941 is as per table A herein below. The percentage of the wo* executed with respect to each of the major activity of the Row house nos. 01 to 67 Building and Overall Percentage of work done with respect to each Building is detailed in the Table B. Table A (Io be prepared sepanately for each Building Ming of the Project) ROW HOUSES A 01 TO 09 Percentage of Sr. No Tasks /Activity work done 1 Excavation 100 % 2 0 Number of Plinth 0Yo 3 0 Number of Basement Floor 0To 4 0 Number of Stilt Floor 0 o/o 5 3 Number of Slabs of Super Structure 100 % Page | 1 Nishigandh - C, Disha Srushti, Opp. Hotel Atithi, Rana Nagar, Jalna Road, Aurangabad.- 431005 Call - +91 240 2451616 E - Mail - inlo@earndarcliteq!$.cam, Web Sita - www.samilarchitecs.com envirenment/GRZ Nee, Finishing to entrance lobby/s, plif,th preteetien, paving of areas appurtenant to BuildingMing, Compound Wall and allother requirements as may be required to Obtain 0ccupation /Completion Certificate Occupation /Completion Certificate Rotrrf HousEs c 18 To24 Percentage of Sr. No Tasks /Activity work done I Excavation 0 o/o 2 0 Number of Plinth 0 o/o 3 0 Number of Basement Floor 0 o/o olo 4 0 Number of Stilt Floor A 5 3 Number of Slabs of Super Structure 0To lntemal walls, lnternal Plaster, Floorings within Flats/Premises, 6 AYo Doors and Windows to each of the FlaUPremises Sanitary Fittings within the FlaUPremises, Electrical Fittings within 7 0 o/o the FlatlPremises Staircases, Lifts Wells and Lobbies at each Floor level connecting I Staircases and Lifts, Overhead and Underground Water Tanks 0To The extemalplumbing and extemal plaster, elevation, completion I of tenaces with waterproofing of the BuildingMing, A o/o lnstallation of lifrs, waterpumps, ffi @, Electrical fittings to Common Areas, envirenment /GRZ NeG, Finishing to entrance lobby/s, plint+ 10 0Yo pretedien, paving of areas appurtenant to BuildingMing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certificate Occupation /Completion Certificate ROW HOUSES D 25 TO 32 Sr. Percentage of Tasks /Activity No work done 1 Excavation 100 % 2 0 Number of Plinth 0Yo Page | 3 Nishigandh - C, Disha Srushti, Opp. Hotel Atithi, Rana Nagar, Jalna Road, Aurargabad.- 431005 Gall - +91 240 2451616 E - Hail - inio&samilaf$hilect*.c$m., Web Site - www.samilarchitecs.com ffi, finishing to entrance lobby/s, plinttr pretedion, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate Omupation /Completion Certifi cate ROW HOUSES F 41 TO 50 Percentage of work Sr. No Tasks /Ac'tivity done 1 Excavation 0% 2 0 Number of Plinth 0 o/o 3 0 Number of Basement Floor 0 o/o 4 0 Number of Stilt Floor 0 o/o 5 3 Number of Slabs of Super Structure 0Yo lntemal walls, lnternal Plaster, Floorings within 6 Flats/Premises, Doors and Windows to each of the 0Yo FlaUPremises Sanitary Fittings within the FlaUPremises, Electrical Fiftings 7 0To within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor level 8 connecting Staircases and Lifts, Overhead and Underground 0 o/o Water Tanks The external plumbing and external plaster, elevation, o/o 9 completion of tenaces with waterproofing of the A BuildingAffing, lnstallation of lifls, waterpumps, ffi W, Electrical fittings to Common Areas, , Finishing to entrance 10 0Yo lobby/s, p{i*n+remenn, paving of areas appurtenantto Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Occupation /Completion Certificate Page | 5 Nishigandh - C, Disha Srushti, Opp. Hotel Atithi, Rana Nagar, Jalna Road, Aurangabad.- 431005 Cal! - +91 240 2451616 E - Mail - inf*&gaft$arsb{gsts.csn1, Web Site - www.samilarchitecs.com lntemal walls, lnternal Plaster, Floorings within 6 Flats/Premises, Doors and Windows to each of the 40 o/o FlaUPremises Sanitary Fittings within the FlaUPremises, Electrical Fittings 7 0 o/o within the FlaUPremises Staircases, Lifis Wells and Lobbies at each Floor level I connecting Staircases and Lifts, Overhead and Underground 0 o/o Water Tanks The externalplumbing and extemal plaster, elevation, I completion of tenaces with waterproofing of the 0Yo BuildingMing, lnstallation of lifis, waterpumps, @ @, Electrical frttings to Common Areas, epnditiene ef envirenment/GRZ NOC, Finishing to entrance 10 0Yo lobby/s, ptint+*reteei,on, paving of areas appurtenant to BuildingMing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certifi cate Occupation /Completion Certifi cate TABLE.B lnternal & Extemal DevelopmentWorks in Respect of the entire Registered Phase Propose Sr. Common areas and Percentage d Details No. Facilities, Amenities of lUo* (Yes/No) done lntemalRoads Only Paved surface in Tremix 1 Yes 35o/o & Footpaths Concrete No Foot Paths Water Supply Through Bore well and AMC 2. Yes 00% water supply when available. Sewerage (chamber, lines, Chamberc, Drainage lines Septic 3. Septic Tank, STP) Yes 00% Tank. STP As per consultant's design Page | 7 Nishigandh - C, Disha Srushti, Opp. HotelAtithi, Rana Nagar, Jalna Road, Aurangabad.- 431005 Cal! - +91 240 24516'16 E - Mail - inl*&garn!!arcb{es!g.c$!'-n, Web Site - www.samilarchitecs.com