FORM-4 [see Regulation 3] ARCHITECT’S CERTIFICATE (To be issued on completion of each of the Building/Wing) Date: 31-12-2021 To The Venkateshwara Builders & Developers, H.No.L-1-12/9,N-2,Ram Nagar, Mukundwadi, Aurangabad. Subject: Certificate of percentage of completion of construction work of “Vitthal Nagari” for 95 Row Houses of the Project having MahaRERA Registration Number P51500030173 being developed by Venkateshwara Builders & Developers. Sir, We Advantage Architecture have undertaken assignment as architect for certifying percentage of completion of construction work of the residential project, situated on the land bearing Gut No. 285 ,At Apatgaon, Tq.& Dist.Aurangabad , Demarcated by its boundaries ( latitude and longitude of the end points) 19.810737258071875, 75.48494265295885 to the North , 19.811277865657917, 75.48243315908339 to the South 19.810575649642068, 75.48466276065207 to the East, 19.811526941534048, 75.48256712655962 to the West of Division,having MahaRERA Registration Number P51500030173 by M/s. Venkateshwara Builders & Developers Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51500030173 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. Tasks / Activity Percentage of workdone No. 1. Excavation………..95 Row Houses 10% 2. Plinth……..………..95 Row Houses 10% 3 Ground Floor slabs…95 Row Houses 10% 5. First Floor slabs…..…95 Row Houses 0% 6. Internal walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat /Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 10. Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, Plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and other requirements as may be required to Obtain Occupation/Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done 1. Internal Roads & Footpaths Yes 15% In Progress 2. Water Supply Yes 15% In Progress 3. Sewerage (Chamber, lines, Yes 00 Yet to start Septic Tank, 4. Storm Water Drains Yes 00 Yet to start 5. Landscaping & Planning Yes 00 Yet to start 6. Street Lighting Yes 00 Yet to start 7. Community Buildings NO 00 Not applicable 8. Treatment and disposal of NO 00 Not applicable sewage and sullage water 9. Solid Waste management & NO 00 Not applicable Disposal 10. Water Conservation, Rain NO 00 Not applicable water harvesting 11. Energy management NO 00 Not applicable 12. Fire protection andsafety NO 00 Not applicable requirements 13. Electrical meter room, sub- NO 00 Not applicable station, receiving station 14. Others (Option to Add more) 00 MR Sudhir Dikkar