Sudhir U. Dikkar Consulting Engineers/Planner Govt. Registration No. AMC E133/92 Govt. Registration No. AMRDAA: 292/21 Vastalya Plot. No.15 Ramchandranagar, Shahanoorwadi FORM-2 See Regulation 3] ENGINEER'S CERTIFICATE (To be eubmitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account Project wise) To. Date 15/06/2021 The Venkateshwara Builders & Developers, H.No.L-1-12/9,N-2,Ram Nagar, Mukundwadi Aurangabad. Subject Certificate of Cost Incurred for Development of Vitthal Nagari for Construction of 95 Row House of the FIRST Phase (MahaRERA Registration Number) situated on the Plot No. 1 To 62, Gut No. 285 ,At Apatgaon,Tq.& Dist.Aurangabad.Demarcated by its boundaries (latitude and longitude of the end points) 19.810737258071875, 75.48494265295885 to the North 19.811277865657917, 75.48243315908339 to the South 19.810575649642068, 75.48466276O65207 to the East, 19.811526941534048, 75.48256712655962 to the West of Division Village Apatgaon,Taluka Aurangabad.Dist.Aurangabad Pin 431007 admeasuring 8000 sq.mts. area being developed by Venkateshwara Builders& Developers Ref MahaR ERA Registration Number Sir, VWe Mr.Sudhir Uttamrao Dikkar have undertaken assignment of certifying Eotimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being 96 Row House North &South Wingls) of the First Phase situated on the plot bearing C.N. No./CTS No./Survey No./ Final Plot No.1 to 62 of Division Apatgaon Village Aurangabad Taluka District Aurangabad 431007. lOwner/Promoter] admeasuring 8000 sq.mts. a r e a being developed by 1. Following technical professionals are appointed by Owner/ Promoter Architect ) Shri.Sudhir Uttamrao Dikkar as LS. ii) M/S.Strudcom Consultants (P) Ltd. as Structural Consultant ii) Shri Shard Paigude as MEP Consultant * iv) Shri Pankaj Balkrishna Kende as Quantity Surveyor We have estimated the cost of the completion to obtain Occupation Certificate/ Completion 2. of the project. Our estimated cost Certificate, of the Civil, MEP and Allied works, of the Building(s) calculations are based on the Drawings/plans made available to u s for the project under reference by the for the entire work as calculated by Developer and Consultants and the Schedule of items and quantity Shri Pankaj Balkrishna Kende quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the buildingls) ofthe aforesaid project The estimated Total Cost of Hnder reference as Rs. 850 Lacs Total of Table A and B). for the project'is vith reference to the Civil, MEP and allied works required to be completed of obtaining occupation certificate / completion certificate for the buildingls) from the purpose jurisdiction the aforesaid project is being being the Planning Authority under whose implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 14.50 Lacs_ (Total of Table A and B) The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Aurangabad Metropolitan Region Development Authority Aurangabad is estimated at Rs.835.50 Laca (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TARLE A called Vitthal Nagari Building Wing bearing Number 95 or for each Building Wing of the Real Estate Project) (to be prepared separately Sr. No Partieulars Amounts in Lacs (2) (3) (1) Total Estimated cost of the building/wing Rs. 600.00 as on 15/06/2021 date of Registration is Cost incurred as on 15/06/2021 Rs. Nil (basedon the Estimated cost) Work done in Percentage 0.00 % (as Percentage of the estimated cost Balance Cost to be Incurred Rs. 600.00 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs.Nil as on 15/06/2021 not included in the Estimated Cost (AnnexureA) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No. Particulars Amounts in lacs (1) (2) (3) Total Estimated cost of the Internal and External Rs. 250.00 Development Works including amenities and Facilities in the layout as Vitthal Nagari on 15/06/2021 date of Registration is (1) (2) (3) 2 Cost incurred as on 15/06/2021 Rs. 14.50 (based on the Estimated cost). 3 Work done in Percentage 05.80 6% (as Percentage of the estimated cost). Balance Cost to be Incurred Rs. 235.50 (Based on Estimated Cost). Cost Incurred on Additional /Extra Items Rs. Nil as on 15/06/2021 not included in the Estimated Cost (Annexure A). e l i t DHIR Yours Faithfully, Archilechral Plannar Signature of Engineer Deslgner Lie No 292/2 (Licence No. 292/21.) Oha Nagat +Note: 1. The scope of work is to complete entire Real Estate Project as per drawings approved firom time to time so as to obtain Occupation Certificate/Completion Certificate. 2. Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity caleulated can be relied upon by the Enginee In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked () and in case quantity are being caleulated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity caleulated should be mentioned at the place marked (. 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustivve. Annexure A List of Extra/Additional Items executed with Cost (which were not part of the original Estimate of Total Cost)