Amol Kshirsagar Architectural Planner, Consulting Engineer & Valuer Annexure A FORM 1 [See Regulation 3] ARCHITECT'SCERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: 16/03/2023 To, M/s Sara Towers Pvt. Ltd, Office No.D-55, 1st Floor, Gajanan Vaibhav Complex, Cannught Place, Aurangabad. Certificate of Percentage of Completion of Construction Work of Subject: SARA VENKATESH F TYPE BUILDING having MahaRERA Registration Number P51500032337 being Developed by Sara Towers Pvt. Ltd. Sir, I/We Er. Amol Kashirsagar have undertaken assignment as Architect/ Licensed Surveyor of Certifying Percentage of Completion of Construction Work SARA VENKATESH F TYPE BUILDING having MahaRERA Registration Number P51500032337 being Developed by Sara Towers Pvt. Ltd. Based on the Site Inspection, with respect to the Layout/ each Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A and Table Bherein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A-1 Building Sara Venkatesh FType Building S. Tasks/ Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements (if any) NA 3. Podiums (if any) Flat No. 4, Plot No4.102,Plinth 100%% Reg Nh Nathprangan, Garkheda, BE. (CW) Aurangabad. KAurangabad Mob.: 09960669921 SULTNSENG Amol Kshirsagar Architectural Planner, Consulting Engineer & Valuer 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors, 80% windows within Flats/ Premises Sanitary Fittings within Flats / Premises 80% 9 Staircases, Lift Wells & Lobbies at each Floor80% Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 80% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting| 80 Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment/ CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protectior, Paving of Areas appurtenant to Duilding/Wing, Compound Wall and all other requiremenis as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal &External Development Works) in respect of the Registered Phase S Common Areas & Proposed Percentage Details No. Facilities (Yes/NO) of actual Work Done (As on date of Certificate) (1) 2) (3) (4) (5) 1. Internal Roads & YES 70 Internal Project Footpatns Cement Roads 2 Water Supply YES 70 3. Sewerage (Chamber, Lines, YES 70 Drainage Line Septic Tank, STP) 4. Strom Water Drains No 5 Landscaping & Tree Yes 50 Tree Plantation 6. Flat No. 4, Plot No. 102, Planting Street Lighting Yes 60 and Garden Street Lights/Reg Na KSHIR E/17403 Nathprangan, Garkheda, ÆE. (ChAI) Aurangabad. [Aurangabad Mob.: 09960669921 SUT ING EN Amol Kshirsagar Architectural Planner, Gonsulting Engineer & Valuer 7. Internal Project Community Buildings No 8 Treatment & Disposal of NA NA Sewage and Sullage Water 9 Solid Waste Management No &Disposal 10. Water Conservation/ Rain Yes 20 Rain Water Water Harvesting Harvesting as per Norms 11. Energy Management 12. Fire Protection & FireNO NA NA Safety requirements 13. Electrical Meter Room, No NA Sub-Station, Receiving Station Reg No. Yours faithfully, E/1}4/93 B.E. (C) Aurangabad STNG Signature & Naae Amol Kshirsagar License Number (_ Agreed &Accepted ay: Signature of Promoter Name: Sara Towera Pvt Ltd Date: 16/03/2023 9abað Flat No. 4, Plot No. 102, Nathprangan, Garkheda, Aurangabad. Mob.:09960669921