Annexure A FORM 1 [See Regutation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 31,t0312023 To, M/s Kalpak Developers, 102, Veer Shanti, Kranti Chowk, Aurangabad, 431005. Subject: Certificate of Percentage of Completion of Construction Work of Project named as 'Kalpak Udyog', having MalhaRERA Registration No. P51500029919 situated at Gut No 36/P, 371P, Itkheda, Aurangabad at Aurangabad (M Corp.), Aurerngabad, Aurangabad, 431 136 being developed by M/s. Kalpak Developers. Sir, I Ar. Saurabh Mrrkute lrave undertaken assigrrnrerrl as Architecl o[ Certifying Percentage of Completion of Construction work of "Kalpak Udyog" having MahaRERA Registration No P51500029919 being developed by Kalpak Developers. Based on the Site lnspection, with respect to the Layout / each BuildiingAffing of the aforesaid Real Estate Project, I certify that as on date of this Crlrtificate, the Percentage of Work Done for each of the BuildingMing of the Reial Estate Project under MahaRERA is as per Table-A herein below. The percerntage of work executed with respect to each of the activity of entire Phase is dr:tailed in Table-B. W Gt'S TABLE-A "Kalpak Udyog" Row House No 01 to 12 (Residential Apartment) S. Tasks / Activity Percentage o'f Actual Worlr No. Done (As on date of the Certilficate) (1) (2t (3) 1. Excavation 100o/o 2. Basements -NA NA 3. Podiums (if anv) NA 4. Plinth -1 for each row house from R.House No.01 to12 100% 5. Stilt Floor-1for each row house from R.House No.01 1O0o/o to12 6. - Number of Slab of Super Structure 2 for each row lAOo/o house from R. House No.01 to 12 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 11Aa/o windows within Flats / Premises 8. Sanitarv Fittinqs within Flats / Premises 10oo/o 9. Staircases, Lift Wells & Lobbies at each Floor Level 10Ao/o Overhead and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, 980/o Completion of Terraces, with waterproofing of the Buildino / Winq 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 10Ao/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requiremcnts oc may be requircd to complcto Projcot as pcr tpccrtrcatronr to Aflrccment of ljAl9, ,AnV othcr Actrvrty W w4 Row House No 13 to 19 (Residential Apartment) 8. Tasks / Activity Percentage orf Actual YUork No. Dctne (As on date of the Certiificate) (1) t2t (3) 1. Excavation 100o/o 2. Basements (s) - NA NA 3. Podiums (if any) NA 4. Plinth-1 for each row house from R, No. 13 to 19 lOOo/o 5. - Stilt Floor 1 for each row house from R. House No.13 100o/o to19 6. Number of super Slab of Super Structure - 2 for each 100o/o row house from R.House No. 13 to 19 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 100o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 100o/o L Staircases, Lift Wells & Lobbies at each Floor Level 100o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 98% Completion of Terraces, with waterproofing of the Building / Wing 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 10Ao/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingA//ing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity ffi$ Row House No 20 to 23 (Residential Apartment) S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certiificate) (1) tzt (3) 1. Excavation 10Ao/o 2. Basements (if any) NA 3. Podiums (if any) NA 4. - Plinth 1 for each row house from R.House No.20 to 100o/o 23 5. Stilt Floor * 1 for each house from R, House No.20 to 100o/o 23 6. - Number of Slab of Super Structure 2 for each row lAAo/o house from R.House.20 lo 23. 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 1$Qo/o windows within Flats / Premises 8. Sanitary Fittinqs within Flats / Premises 100o/o L Staircases, Lift Wells & Lobbies at each Floor Level 100o/o Overhead and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, 98o/o Completion of Terraces, with waterproofing of the Buildins / Wins 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 100o/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project aB per specifications to Agreement of $ale, Any other Aotivity TABLE.B Common Areas (lnternal & External Development Works) in respect of the Project Registration No. P51 50002991 9 S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / No) actualWork Done (As on date of Certificate) (1) (21 (3) (4) (5) 1. lnternal Roads & Footpaths Yes 100o/o 2. Water Supplv Yes 100o/o Throuqh Borewell 3. Sewerage (Chamber, Lines, Yes lOOo/o No STP Drainage Line t:ill Septic Tank, STP) Conporation Chamber 4. Strom Water Drains No NA NA 5. Landscaping & Tree Planting Yes 10Ao/o Trere Plantation frlr lnteirnal Proiect 6. Street Lightins Yes NA Street for ct t@ Only 7. Community Buildings No NA NA 8. Treatment & Disposal of Sewage No NA NA and Sullage Water 9. Solid Waste Management & No NA NA Disposal 10. Water Conservation / Rain Water Yes 98o/o Rain Water Harvestirrg Harvesting as per Corporation Nonms 11. Energy Management No NA NA 12. Fire Protection & Fire Safety No NA NA requirements 13. Electrical Meter Room, Sub- Yes lOOo/o Electrical DP if required Station, Receivino Station 14. Others (Option to Add more) No NA Yours faithfully, Ar. Saurabh Mirkute (Architect) ffi License Number: Address: Agreed & Accepted by: Signature for and on behalf of Promoter Name: Date: