Annexure A FORIU I [See Regulation 3J ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 30,t092A22 To, M/s Kalpak Developers, 102, Veer Shanti, Kranti Chowk, Aurangabad, 431005. Subject: certificate of Percentage of completion of construction work of Project named as 'Udyog Kalpak A', having MalhaRERA Registration No. P51500029919 situated at Gut No 36/'P, g7tP, Itkheda, Aurangabad at Aurangabad (M Corp.), Aurerngabad, Aurangabad, 431 136 being developed by M/s. Kalpak Developers. Sir, I Ar, Saurabh Mirkute have undertaken assignment as Architeot of Certifying Percentage of Completion of Construction Work of "Udyog Kalpak A" having MahaRERA Registration No P51s00029919 being developed by Kalpak Developers. Based on the Site Inspection, with respect to the Layout / each BuildiingAffing of the aforesaid Real Estate Project, I certify that as on date of this Ce.'rtificate, the Percentage of Work Done for each of the BuildingArVing of the Reial Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in T A@q TABLE.A "Udyog Kalpak A,, Row House No 01 lo 12 (Residential Apartment) S. Tasks / Activity Percentage orf Actual Work No. D<>ne (As on date of the Certilficate) (1) (21 (3) 1. Excavation 1A0o/o 2. Basements -NA NA 3. Podiums (if anv) NA 4. Plinth -1 for each row house from R.House No.01 to12 100o/o 5. Stilt Floor-1for each row house from R.House No.01 73o/o lo12 6. Number of Slab of Super Structure - 2 for each row 620/o house from R. House No.01 to 12 7. lntemal Walls, lnternal Plaster, Floorings, Doors, 620/o windows within Flats / Premises 8. Sanillary Fittinqs within Flats / Premises 65o/o 9. Staircases, Lift Wells & Lobbies at each Floor Level 65o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 620/o Completion of Terraces, with waterproofing of the Buildino / Wino 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 600/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of I Environment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Row House No 13 to 19 (Residential Apartment) S. Tasks / Activity Percentage of Actual Worlr No. Done (As on date of the Certiificate) (1) l2l (3) 1 Excavation 1A0o/o 2. Basements (s) NA 3. Podiums (if any) NA 4. Plinth-l for each row house frorn R. No. 13 to 19 100o/o 5. - Stilt Floor 1 for each row house frorn R. House No.13 83o/o to19 5. - Number of super Slab of Super Structure 2 for each 73o/o row house from R.House No. 13 to 19 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 73o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 73o/o 9. Staircases, Lift Wells & Lobbies at each Floor Level 73o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 73o/o Completion of Terraces, with waterproofing of the Building / Wins 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 73o/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Row House No 20 to 23 (Residential Apartment) S. Tasks / Activity Percentage orf Actual Work No. D