Annexure A FORM 1 [See Regutation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project & for Withdrawal of Money from Designated Account) Date: 31,t1212A21 To, M/s Kalpak Developers, 102, Veer Shanti, Kranti Chowk, Aurangabad, 431005. Subject: Certificate of Percentage of Completion of Construction Work of Project named as 'Udyog Kalpak A,, having MalhaRERA Registration No. P51500029919 situated at Gut No 36/'P, 371P, Itkheda, Aurangabad at Aurangabad (M Corp.), Aurerngabad, Aurangabad, 431 136 being developed by M/s. Kalpak Developers. Sir, I Ar. Saurabh Mirkute have undertaken assignment as Architeot of Certifying Percentage of completion of construction work of "udyog Kalpak A," having MahaRERA Registration No Po1s00ozg9i9 being developed by Kalpak Developers. Based on the Site lnspection, with respect to the Layout / each BuildiingAlVing of the aforesaid Real Estate Project, I certify that as on date of this Ceirtificate, the Percentage of Work Done for each of the BuildingAffing of the Re;al Estate Project under MahaRERA is as per Table-A herein below. The percerntage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. . / / ---* 4/AshBt 77-rTrr,ffi [WYr QciiIeO TABLE.A "Udyog Kalpak A"' Row House No 0{ to 12 (Residential Apartment) S. Tasks / Activity Percentage orf Actual Worlr No. Dclne (As on date of the Certilficate) (1) tzt (3) 1. Excavation 100o/o 2. Basements NA 3. Podiums (if any) NA 4. Plinth -1 for each row house from R.House No.01 to12 100Yo 5. Stilt Floor-1for each row house from R.House No.01 3Oo/o to12 6. - Number of Slab of Super Structure 2 for each row 32o/o house from R. House No.01 to 12 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 29o/o windows within Flats / Premises 8. Sanitary Fittinqs within Flats / Premises 28o/o 9. Staircases, Lift Wells & Lobbies at each Floor Level 20o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 15o/o Completion of Terraces, with waterproofing of the Buildino / Winq 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 35o/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingAlVing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other ,Adivitv ffi Row House No 13 to 19 (Residential Apartment) s. Tasks / Activity Percentage orf Actual Worlt No. Done (As on date of the Certilficate) (1) {21 (3) 1. Excavation lOAo/o 2. Basements (s)- NA NA 3. Podiums (if any) NA 4. Plinth-1 for each row house from R.House No. 13 to 1g 100o/o 5. - Stilt Floor 1 for each row house from R. House No.13 25o/o to19 6. - Number of super Slab of Super Structure 2 for each 15o/o row house from R.House No. 13 to 19 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 32o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 3Ao/o L Staircases, Lift Wells & Lobbies at each Floor Level 17o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 31o/o Completion of Terraces, with waterproofing of the Building / Wing 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 160/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Row House No 20 to 23 (Residential Apartment) S. Tasks / Activity Percentage orf Actual Work No. D