PRASAD APHAI.E M.E. (Strucl.) MtE, FtV 21, Vorod Complex, Behind Aanexure - B Rothi Tower, Bijlinogor FORM - 2 Aurongobod -431 @5 [See Regulation 3] Mo. No.982253129A Date:461A.2022 To, M1S SAIGHI BUILDERS OFFICE NO.4/5, PLOT NO. G-8 SHREEYASH PLAZA, TOWN CENTE& CIDCO, OPP HP OFFICE, AURANGABAD- 431001 Subject: Certificate of Cost lncurred for Development of Parvati Enclave having MahaRERA Registration Number P51500029599 (Only applicable after Project Registration) being Developed by M/S SAKSHI BTIILDERS Sir, 1. I I We Prasad Aphale have undertaken assignment of Certifying Estimated Cost for Parvati Enclave having MahaRERA Registration Number P51500029599 (Only applicable after Project Registration) being Developed by l\'US SAIGHI BUILDERS. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per th.e specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the DrawingslPlans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Mayur Nagre Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection canied out by us to ascertain I confirm the above analysis given to us. 3, We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 4,80,00,0001 (Total of Table A & B) at the time sf Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate I Completion Certificate for the Building(s) I Wing(s) / Layout I Plotted Development from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs. 5,25,68,5341 (Iotal of Table A & B). The Amount of Es.timatp..d..Qsst.tngur"[ed."i-s..ealcula!e."d..e.n.th.e..h.a.sj,q."sf.,input materials / services used & unit cost of these items. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. -45,68,5341- (Total of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in TableA&Bbelow: TABLE - A Building / Plotted Development bearing Number Gut No 26/ 1 Himayatnagar, Aurangabad or called Parvati Enclave. s. Particulars Amount (in Rs.) No. I" Total Estimated Cost of Building / Wing / Layout I 4,90,00,000/- Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate 30.09.2022 5,25,68,5341 3. Work Done in Percentage (as Percentage of 84.7% Estimated Cost) 4^ Balance Cost to be incurred "* ((based on 94,31,466/- Estimated Cost) i5. I Cost incurred on Additionall Extra ltems not 1,40,00,G00/- l included in the Estimated Cost (Table-C) : TABLE - B Internal & External Development Works in respect of Registered Phase D. Particulars Amount {in Rs.) No. 1. Total Estimated Cost of lnternal& External Nit Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incuned as on date of Certificate Nit 3, Work Done in Percentage (as Percentage of Nit Estimated Cost) 4. Balance Cost to be incurred *" ((based on NiI Estimated Cost) E Cost incurred on Additionall Extra ltems not included in the Estimated Cost (Table-C) Yours faithfully, PRASAD Signature of Engineer p. e_. rl, m. f" (strucr. 1 llvJ f,cgd. ib.: 00[c Bin,lolrri prllrois l Agreed & Accepted by: Signature of Promoter NAme: M/S SAKSHI BUILDERS Date:06/1012422 Sakshi .Buildera Note:e: /4 4gg 1. | / Paftncr The scope of work is to compl6te Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (*) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost {Which were not parts of the original trstimate of Total Cost) S. No. List of Extra I Additional / Deleted ltems Amount {in Rs.} 1 Additional rate difference and other extra 1,40,00,0001- works 2.