Annexure - B FORM 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:08/01/2023 To, Arihant Enterprises, Ajinkya Plaza, Gut No 107, Nr HDFC Bank, Opp Renuka Mata Mandir, Beed By Pass, Aurangabad Certificate of Cost Incurred for Development of Ajinkya Apartmen having MahaRERA Subject: Registration Number P51500031801 being developed by Arihant Enterprises SIr, 1/We Pramod Mote have undertaken assignment of Certifying Estimated Cost for Ajinkya Apartment having MahaRERA Registration Number P51500031801 being developed by Arihant Enterprises 1. We have estimated the cost of Civil, MEP and Allied Works required for completion of the the Project as per the apartments & proportionate completion of internal & external works of calculations are based on specifications mentioned in the Agreement of Sale. Our estimated cost the Drawings/Plans made available to us for the Project under Reference by the Developers Consultants. The Schedule of Items & Quantity required for the entire work as calculated by Er. Pramod Mote Quantity Surveyor appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain/confirm the above analysis given to us. 2. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 2,04,20,424/- And Site Developement Cost Rs. 10,21,021-00 Total Amount Rs. 2,14,41,445/- (Total of Table A) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate in the Agreement of completion of internal & external works, as per the specifications mentioned for the Certificate/ Completion Certificate Sale & for the purpose of obtaining Occupation from the Aurangabad Municipal Corporation Building(s)/Wing(s) / Layout/ Plotted Development aforesaid Project is being Aurangabad being the Authority under whose jurisdiction the Planning implemented. calculates to Rs. 1,92,97,300/- (Total of Table A). The 3. The Estimated Cost incurred till date is Amount of Estimated.Cost.Incurred is. calculated. on the.basis of.input.materials./.services. used.& unit.cost.of.these items. & MEP &Allied Works for completion Apartmentss of 4. The Balance Cost of completion of the Civil, mentioned in external works, as per specifications proportionate completion of internal & of of the aforesaid Project is estimated at Rs. Sale, (Total of Table A). 21,44,145/- Agreement for apartments & proportionate internal& 5. I Certify that the cost of Civil, MEP & Allied Work of Sale, of the aforesaid Project external works, as per the specifications mentioned in Agreement as completed on the date of this certificate is as given in Table Abelow TABLE A Building Development of the Real Estate Project BUILDINGE Particulars Amount (in Rs.) S. No. 1. Total Estimated Cost of Building /Wing/ Layout/ 2,14,41,445/- Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate 1,92,97,300/ 3. Work Done in Percentage (as Percentage of 90% Estimated Cost) Sa on 28th Feb 2022 4. Balance Cost to be incurred * ((based on Estimated 21,44,145/ Cost) 5. Cost incurred on Additional / Extra Items not included inthe Estimated Cost (Table-C) Yours faithfully, Signature& Name (IN BLOCK LETTERS) with Stamp of Engineer INot less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act PRADEEP YMÒTE Regd. No. DDACEIR/2021IAPL0114i Consulting Civii Engineer Piot No.212&216, Shankara Residency Ulkanagari, Garkheda, Aurangabad. Mob. 9422213027 Local Authority License Number (if applicable) Agreed &Accepted by: CAOAnoed Signature of Promoter Name: Arihant Enterprises Date:08/01/20232 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. () Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor,who's Certificate of Calculated, can be relied up on by Engineer. In Quantity case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 6. Please specity if there are any deviations/ qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE C List of Extra / Additional Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List ofExtralAdditional/DeletedItems Amount (in Rs.) 2. PRADEEPV. MOTE Regd. No. DDMB/R/2021ÁPLIO114 Consulting Civil Engineer Piot No.212 &216, Shankara Residency, Ulkanagari, Garkheda, Aurangabad. Mob. 9422213027