R.B & ASSOCIATES B.V .RAUT PLANNER DISGINER ENGINEERS consulting engineer OFFICE: Plot No-12/B ,Gut No- 64 New ST Colony Near N-2 Cidco Auangabad DATE :16-02-2019 FORM 1 (see Regulation 3) (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, “Unity park” Project.By GPA Holder M/S Baheti landmark Gut No-94 (part) Tisgaon Waluj Mahanagar Subject: Certificate of Percentage of Completion of Construction Work of “Unity park” Residential building of the project By : GPA Holder M/S Baheti landmark Situated at . Gut No.94(P) ,Mauje Tisgaon Waluj Mahanagar TQ &DIST.Aurangabad by its boundaries (latitude and longitude of its end points). To the North – Gut No-94(part) land To the South – 18.00 Mtr Wide Road To the East – Gut No-94(part) land To the West – Gut No-94(part) land Construction work of “Unity park” Resi.Project for comprising 41- Nos - 2BHk Row House & 4- Nos 4BHK Row House of the Project By: GPA Holder M/S Baheti landmark on Gut No.94(p) ,Mauje Tisgaon Waluj Mahanagar TQ &DIST.Aurangabad. admeasuring 3320.00 sq.m are being developed GPA Holder M/S Baheti landmark . Sir, I/We B.V RAUT Proprietor of R&B Associates have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction work “Unity park” of the Project for comprising 41 Nos 2bhk row house & 4 Nos 4bhk row House ,of the project GPA Holder M/S Baheti landmark on Gut No.94(p) ,Mauje Tisgaon Waluj Mahanagar TQ &DIST.Aurangabad. admeasuring 3320.00 sq.m are being developed by GPA Holder M/S Baheti landmark Following technical professionals are appointed by owner / Promoter :- i. M/s / Shri B.V RAUT as L.S. / Architect: ii. M/s / D.A.Deshpande as Structural Consultant iii. M/s / Shri B.V RAUT as MEP Consultant iv. M/s /-------------------- as Site Supervisor Based on site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I Certify that as on the date of this certificate, the Percentage of work done for for comprising 41 Nos –2bhk Row House & 4 Nos 4BHK Row House,of the project by GPA Holder M/S Baheti landmark on Gut No.94 (p) ,Mauje Tisgaon Waluj Mahanagar TQ &DIST.Aurangabad. admeasuring 3320.00 sq.m are being developed by GPA Holder M/S Baheti landmark Leach of the building/wing of the Real Estate Project as registered vide number All Building Are Completed under MahaRERA is as per Table A herein below. The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Sr. No. Tasks / Activity Percentage of Work done 1 Excavation 00 % 2 X Number of Basement(s) and Plinth 00 % 3 X Number of Podiums NA 4 Stilt Floor 00 % 5 4 Number of Slabs of Super Structure 00 % 6 Internal Walls, Internal Plaster, Floorings within Flats / Premises, 00 % Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, 00 % Electrical Fittings within the Flat /Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and 00 % Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 00 % Completion of terraces with waterproofing of the Building / Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 00 % NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion CFO Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. No. Common areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done 1 Internal Roads & Foothpaths Yes - NA 2 Water Supply Yes 0% Not yet Start 3 Sewarage (Chamber, lines, Yes 0% Not yet Start Septic Tank, STP) 4 Storm Water Drains No - Not yet Start 5 Landscaping & Tree Planting No - Not yet Start 6 Street Lighting No - Not yet Start 7 Community Buildings No - Not yet Start 8 Treatment and disposal of No - Not yet Start sewage and sullage water 9 Solid Waste Management & No - Not yet Start Disposal 10 Water conservation, Rain water yes 0% Not yet Start harvesting 11 Energy management NO - Not yet Start 12 Fire Protection and fire safety NO - Not yet Start requirements 13 Electrical meter room, sub- NO - Not yet Start station, receiving station 14 Others (Option to Add more) NO - Not yet Start Yours Faithfully Signature & Name (B.V.RAUT) of L.S /Architect (License No NRV/E/604/2015) Date 16-02-2020