PRADEEP V. MOTE *OFFICE B.E. (Civil) SHANKARA RESIDENCY Reg.No. E-615 /2016 PLOT NO. 215/216, SHOP NO. 05, R.C.C. CONSULTANT ULKANAGARI, GARKHEDA, *STRUCTURALENGINEER AURANGABAD *CONSULTING ENGINEER Mo. No. 9422213027, 8855844438. ******** FORM-2 (see Regulation 3] ENGINEER'S CERTIFICATE Date:-12/4/2021 To M/S.SAIKRUPA DEVELOPERS THROUGH SHRI.RAJENDRA KADUBA ADMANE PATIL, SATARA, AURANGABAD-431010 Subject: Certificate of Cost Incured for Dovelopment of RESIDENTIAL APPARTMENT BUILDING "SA-KRUPA GOLD RESIDENCY" for Construction of Building situated on the Plot bearing Plot mno.35, Gut No 44P At Village SATARA Tq & Dist Aura Registration Number-APPLIED Sir /WeM/S.SAIKRUPA DEVELOPERS THROUGH SHRI.RAJENDRA KADUBA ADMANE PATIL, have undertaken assignment of cetfying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, 16.00m To The North 16.0.00.M To The South 24.00.Mt. The Eas.,24.00.M.,On The West Of GutNo 44/P Village SATARA Taluka Aurangabad District Aurangabad PIN-431010 Admeasuring 384.00 Sq.Mts 1. Following technical professionals are appointed by Owner/ Promoter i) M/s/Shri.AMRISH JOSHI as Architect i) Mis /ShriPRADEEP MOTE as Structural Consultant ijM/s /Shri R.K.DHANDE as Quantity Surveyor. 2 We have estimated the cost of the completion to obtain Occupation Certificatel Completion Certficate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated COst calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consutants and the Schedule of items and quantity for the entire work as calculated by Shri R.K.DHANDE quantity Surveyor appointedby Developer/Engineer, and the assumption of the cost of material, labour and other inpats made by developer, and the site inspection carried out by us. PRADEEPV. MOTE/ OTE/N Regd. No. DDMCB/R/2020/APLO Consulting Civil Engineer Plot No. 212 &216, Shankara ResiderCy Ulkanagari, Garkheda, Aurangabad. Mob: 9422°13027 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.2,75,00,4001- (Rupees TWO CRORE SEVENTY FIVE LAKHS &FOUR HUNRED ONLY Only) The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate I completion certificate for the building(s) from the Aurangabad Municipal is Corporation being the Planning Authority under whose jurisdiction the aforesaid project being implemented. 4. The Estimated Cost Incurred till date is calculaled at Rs.0.00(Rupees ZERO ) The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. The Balance cost of Completion of the Civil, MEP and Allied works of the Building/s) of the 5. from Aurangabad subject project to obtain Occupation Certificate / Completion Certificate Cost of the Civil, Municipal Corporation is estimated at Rs 2,75,00,400-.I cetify that the MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TABLE A Sr. Particulars Amounts No. 1. Total Estimated cost of the building /wing Rs. 2,75,00,400/- as on .../2021 date of Registration is Rs.0.00 2. Cost Incurred as on 31.12.2017 (basedon the Estimated cost) 0% 3. Work done in Percentage (as Percentage of the estimated cost) Rs. 2,75,00,400/ Balance Cost to be Incurred (Based on Estimated Cost) Rs.0.00 5. Cost Incurred on Additional / Extra ltems as on 31.12.2017 not included in the Estimated Cost (Annexure-A) Yours Faithfully PRADEEPV. MOTE Regd. No. DDMCB/R/2020/APL00730 Consulting Civil Engineer Plot No. 212 &216, Shankara Residency, Ulkanagari, Garkheda, Aurangabad. Mob: 9422213027 Signature of Engineer (Licence Nol . Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2.()Quantity survey can be done by ofice ofEngincer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (. 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4.As this is an estimated cost, any deviation in quantity required for development ofthe Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/ Additional Items executed with Cost (which were not part of the original Estimate of Total Cost) al P PRADEEP V. MOTE Regd. No. DDMCB/R/2020/APLO0730 Consulting Civil Engineer Plot No. 212 & 216, Shankara Residency, Ulkanagari, Garkheda, Aurangabad. Mob:9422212027