FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date : 15-04-2023 To, Bhaishree Ventures LLP, Plot No 29/45, Bhaishree Chembers, Opp. ADCC Stadium, Kamgar Chowk N-2, CIDCO Aurangabad. Subject : Certificate of Percentage of Completion of Construction Work of the Project “Geetaban Residency Phase-II” having MahaRERA Registration Number P51500025486 being developed by BHAISHREE VENTURES LLP Sir, I Ar.Piyush Bhavasar of Scale Architects Lab have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Project “GEETABAN RESIDENCY PHASE - 2”” having MahaRERA Registration Number P51500025486 being developed by BHAISHREE VENTURES LLP. Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/wing of the Real Estate Project as registered under MAHARERA is as per table “A” herein below. The percentage of the work executed with respect to each of the activity of the entire phase detailed in the Table B. Table A ROW HOUSES C-1 TO C-8 Sr. Tasks /Activity Percentage No of Work 1 Excavation 100% 2 Basement if any NA 3 Podium if any NA 4 Plinth 100% 5 Stilt Floor' 0 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings Doors and Windows within 100% Flats/Premises 8 Sanitary Fittings within the Flats 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and 100% Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces 100% with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth 80% protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. ROW HOUSES D-1 TO D-8 Sr. Tasks /Activity Percentage of No Work 1 Excavation 100% 2 Basement if any NA 3 Podium if any NA 4 Plinth 100% 5 Stilt Floor' NA 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings Doors and Windows within 100% Flats/Premises 8 Sanitary Fittings within the Flats 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and 100% Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of 100% terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 80% Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Proposed Percentage of Details No Facilities,Amenities Completion 1 2 3 4 5 1 Internal Roads & footpath YES 100% COMPLETED 2 Water Supply YES 100% COMPLETED 3 Sewerage (chamber, lines, Septic Tank, YES 100% COMPLETED STP) 4 Storm Water Drains NO NA 5 Landscaping & Tree Planting YES 100% COMPLETED 6 Street Lighting YES 100% COMPLETED 7 Community Buildings NO NA 8 Treatment and disposal of sewage and NO NA sullage water 9 Solid Waste management & Disposal NO NA 10 Water conservation, Rain water YES 100% COMPLETED harvesting 11 Energy management NO NA 12 Fire protection and fire safety NO NA requirements 13 Electrical meter room, sub-station, YES 100% COMPLETED receiving station 14 Open Parking NO - NA 15 Compound Wall YES 100% As per Drawing