lR0l][t0Trg 0tRTtfl0lI (Form-1) Date:'1,l.03.2021 To, IIll/S SAMARTH VASTUPURTI SHOP N0.2, WADKAR RESIDENCY, NEAR MORYA MANGAL KARYALAYA SHIVAJINAGAR AUMNGABAD Subject: Ce(ificate of Percenlage ot Completion o, Construction of,,SAMARTH PUSHPAK " Building siluated on the Sector K, NS-l Survey No. 126/1 (Pa,t) , Finat Ptot no 01 demarcated by its boundaries (latitude and longitude of the end points) East:. Ptot No. 02 , West :. .l1.OO metre wide Road , South :. Gut No.126/1(P) North :. 18.00 metre wide Road Division Aurangabad village Aurangabad Taluka Aurangabad District Aurangabad plN 431005 admeasuring Plot Area = 425.50sq.mts .& Allowed Built Up Area = 595.70 sq mts. being developed by M/S SAITARTH VASTUPURTI Sit I 0hananjay B. Doifode have undertaken assignment as Archilecl cedifying Percentage of Completion of Construction Work of SAiTARTH PUSHPAK' Building, situated on on the Sector K, NS-,1 Survey No. 126i1 (Part) , Final Plot no 01 demarcated by its boundaries (latitude and longitude of the end points) East:- Plot No. 02,West;- '11.00 metre wide Road, South :- Gut No.l26/1(p) North:- 18.00 meke wide Road oivision Aurangabad village Aurangabad Taluka Aurangabad District Aurangabad PIN 431005 admeasuring Plot Area = 425.50 sq.mts.& Allowed Buitt LJp Area = 595.70 sq mts. being developed by M/S SA|ARTH VASTUPURTI, Folowing technica professiorals are appointed by Promoter - (i) Shri Dhananjay B. Doifode as Architect; (ii) Shri Abhay S. Patil as Structural Consultant. (iii)ShriRama Ankushrao Hatadkar as Site Supervisor Based on Sile lnspection, wilh respect lo each oflhe Buiding of the aforesaid Real Estate Projecl ce ify that as on the dale of this certificate lhe Percentage of Work done for the building of the Real Estate Project as registered vide nunber (for registralion) under RERA is as per Table A here n below The percentage of the work executed with respecl to each of the maior activity of the Building and overall Percentage of work done witf respect to each Building is deta led in the Table B TABLE A Sr. Tasks /Activity Percentage of No work done ,1, Excavation. 100% 2. Plinth. 50% J. Number of Podiums. N.A. 4. Stilt Floor. 00% q (Basement+6) Number ot Slabs of Super Structure. 00% 6. lnternal walls, lnternal Plaster, Floorings within Flats/Premises, 00% Doors and Windov,s to each of th€ FlauPremises. 7. Sanitary Fittings within the FlaUPremises. o0./. Electrical Fittings within the FlauPremises. 00% o Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 00% and Lifts, overhead and Underground Water Tanks. 10. The external plumbing and external plaster,elevation, completion of telraces 00% with waterproofing of the Building, 1',1. lnstallation or lifts, water pumps, Fire Fighting Fittingsand Equipment as per 00% CFo NOC, Electrical littings to Common Areas, electlo, mechanical equipment, Compliance to conditions of environment /CRZ NoC, Finishing lo entrance lobby/s, plinth protection, pavingof areas appurtenant to Building/Wing, compound Wall and allother requiremenls as may be required to Obtain Occupation /Completion Certificate. 2 TABLE B Sr.no Common areas and Facilities, Amenities Proposed Dercentage D.tails (Yes/No) ol Work 1. lnternal Roads&Foothpaths No 2. Water Supply Yes From borewell 3. Sewarage (Chamber Lines, Septic Tank, STP) Yes 00% Septic Tank 4. Storm Water Drains No Landscaping & Tree Planting Yes Near compound wall 6. Street Lighting No 7. Community Buildings No 8, Treatment and disposal ol sewage andsullage No o Solid Waste management& Disposal No 10. Water conservation, Rain rrvater harvesting Yes 00% To Borewell 11. Energy management No 12. Fire protection and fire salety requirements Yes 0.00 Not yet started Electrical meter room, sub-station, receiving Yes 0.00 Metre Box ;- e I'.7 ode Yours Faithfully t{tr. -Cltztll'o*.. ..;:ftiiliiti";:"ii tLtlL''i' L"i .b' o ;'''-n o,i.o"l-i,' AR. DHANANJAY B. DOIFODE Licence N0. CA /20,l3/ 60839