FORM-2A (Sce MahaRERA order No. of 2018) ENGINEER'S CERTIFICATE FOR QUALITY ASsURANCE TO. The SARA PROPERTIES, SARA PARIVARTAN G - 12,13,14 TYPE BUILDING, Gut No.234/2(P), SAWANGI, Ta uka & Dist Aurangabad, Quality Assurance Certificate (Certificate No. FORM -2A for the quarter MARCH-2019) Subject- Certificate for quality of materials used and quality of Construction and workmanship for the Work of 3 No. off buildings(s)/ 3 Wings(s) of the SARA BUILDERS AND DEVELOPERS of the project situated Gut No.234/2(P), SAWANGI ,Taluka & Dist Aurangabad, demarcated by its boundaries (latitude and longitude of the end points) INTERNAL ROAD to the North, INTERNAL ROAD to the South, INTERNAL ROAD to the East, 12 MTR ROAD to the West, of Division Sawangi, village Sawangi, taluka Aurangabad, District Aurangabad, Pin-431007, admeasuring 899.15 Sq. Mtrs. area being developed by SARA BUILDERS AND DEVELOPERS. Reference: MahaRERA Registration Number - P51500029499. Sir, of this undertaken a n assignment of supervision PATIL have I MR. TANAJI real estate project. 1. Our Responsibility: accordance with the development out the work in To Carry of supervision the approved plan and submit certificate permission and a s per authorized laboratory material testing in-situ or in the of work and to carry out prescribed of work and workmanship a s per and to ensure quality and or other relevant code of practice. specification, and a s per NBC 1. Material Testing checks on the basic I/We, have applied following mandatory materials, used in the constructions. i. Cement:- for its fineness, soundness, setting time, it has been tested relevant 3535:1986 or as per other Compressive strerngth etc. as per IS code the standards and its results a r e within IS/BS/NBC code or as per industry permissible limits. ii. Coarse aggregate: lumps, crushing it has been tested, for deleterious materials, clay 2430:1986 or as per other relevant IS/BSNBC value, impact value a s per IS its results a r e within the permissible code or a s per industry standards and limits. iii. Bricks/blocks: strengths etc. as They have been tested for water absorption, crushing code or as pr industry per IS 5454:1978 or a s per other relevant IS/BS/NBC limits. standards and its results are within permissible iv. Concrete/Ready-mix Concrete - It has been tested for compressive strength for various periods as per IS 456:2000 and IS 1199 or as per other relevant IS/BS/NBC codes, as per within permissible limits. industry standards and its results are v. Steel for concrete: It has been tested as per IS 2062:2011 or as per other relevant IS/BS/NBC code or as per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials: Other materials like sand, crushed sand, floor tiles, fixtures, and fittings, pipes and sanitary fittings etc. (List out all items ) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the industry for a particular material. 2. Workmanship:- carried out under our I/we hereby certify that work has been and quality is satisfactoryy supervision. We further certify that workmanship within the permissible and up to the mark and the work has been acceptable limits off deviations as per relevant code of practice. 3. Electrical Materials and workmanship: electrical wiring connections /lit works of all the under electrical installations have been carried out installation/ other and its records has been maintained. authorized /registered electrical engineer relevant I.S/B.S/ National Building codes o r The materials used conform to the standards. as per industry 4. Structural engineer: NG Promoters has engaged structural engineer Mr. office No.-0240-2452305 KARKHANE having Licenses No.-AMC-59/89 having cell No. 9823028081 The structural design of buildings in this project has been checked the soil report before laying PCC done under his supervision. He has consolation with soil consultant. The formwork and concretee for foundation in relevant codes IS 10262:2009 o r a s per other mix design has been done a s per STABILITY and SAFETY checks and certificates for as applicable. His periodic record. have been kept o n 5. Preservation of records: Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision off law. not Please specify materials or any other item off work which were 6. conforming to the standard specifications and which were not rejected. 1:- Coloring, 2:- Aluminum, 3:- Doors & It's Fitting, 4:- Tiles, 5:- CP & sanitary. Yours Faithfully, Reto Signature of Engineer Name: MR. TANAJI PATIL Phone No: 9 5 4 5 4 5 4 1 0 6 Place: Aurangabad,