Amol Kshirsagar Architectural Planner, Consulting Engineer& Valuer FORM-2 (see Regulation 3) ENGINEERS's CERTIFICATE Date:-31.5.2021 To, M/S SARA INFRASTRUCTURE Subject: Certificate of cost incurred for development of project SARA PARIVARTAN G-12,13,14 type Building situated on the land bearing GUT NO. 234/2 (P) Demarcated by its boundaries To the North Path way, To the South- pathway, To the East -Internal Road, To the West-12.0 m wide road of Division AURANGABAD Village -SAWA NGI Taluka AURANGABAD, District - AURANAGABD, PIN NO.431007.Admeasuring land area 1158.40 Sq. Mtrs. area being developed by SARA PROPERTIES Sir, AMOL KSHIRSAGAR have undertaken assignment of certifying Estimated Cost for the real estate project proposed to be registered under RERA, Building namely G-12,13,14 Type Building of the Project SARA PARIVARTAN, situated on land bearing GUT NO. 234/2 (P), Village - SAWANGI, Taluka AURANGABAD, District-AURANAGABD, PIN NO.431007.Admeasuring land area 1158.40 Sq. Mtrs. area being developed by SARA PROPERTIES. REF RERA RAGISTRATION - NEW 1. Following technical professionals are appointed by Owner/ Promoter: () Mr. AMOL KSHIRSAGAR as an Architectural Planner &Consulting Engineer (ii) Mr. N.G.KARKHANE as Structural Consultant (ii) Mr. TANAJI PATIL as Site Engineer Reg.174/3Mo. E B.E. (CA) urNG angbed Flat No. 4, Plot No. 102, ENG Nathprangan, Garkheda, Aurangabad. Mob.: 09960669921 Po-3 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion estimated cost Certificate, of the CIVIL, MEP and Allied works, of the Building(s) of the project. Our calculations are based on the Drawings/plans made available to us for the project under reference work as by the Developerand Consultants and the Schedule of items and quantity for the entire calculated by me quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. aforesaid project under 3. We estimate Total Estimated Cost of completion of the building(s) of the reference as Rs. 3, 64,96,506/-(Total ofTable A &8). The estimated Total Cost of project is with reference to the CIVIL, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the buildingsts) from the TOWN PLANNING DEPT. is being implemented. being the planning Authority under whose jurisdiction the aforesaid project 4. The Estimated Cost Incurred till date is calculated at Rs. 5246372/-( Total of Table A&B ). The amount of Estimated Cost incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance Cost of Completion of the CIVIL, MEP and Allied works of the Building(s) of the subject Certificate from CIDCO (planning Authority) is project to obtain Occupation Certificate/ Completion estimated at Rs. 3,12,50,134/-( Total of Table A &B) of the CIVIL, MEP and allied Work for the aforesaid Project as completed on 6.I certify that the Cost B below. the date of this certificate is as given in Table A and TABLE A Building-G 12,13,14 type Sr.No. Particulars Amounts 1 Total Estimated Cost of the building as on Date Rs.3,49,75,818/ 2 Cost Incurred as On Date (based on the Estimated Rs.52,46,372/- Cost) Work done in Percentage (as Percentage of the 15% estimated cost) Balance Cost to be Incurred (Based on Estimated Cost) | Rs. 2,97,29,446/- Cost Incurred on Additional / Extra Items as on date not N.A. includedin the Estimated Cost(Annexure A) LoL KSA KSHIR No. S E/174/9 BE. (Cv) Angbad. AMG M -3 TABLE B (To be prepared for the entire registered phase of the Real Estate Project) | Sr. No. ParticularS Amount 1. Total Estimated cost of the Internal and External Rs. 15,20,688/- Development Works including amenities and Facilities in the Layout as on Date 2. Cost Incurred as on DATE (based on the Estimated NILL Cost) Work done in Percentage 0% Balance Costtobe Incurred (Based on Estimated Cost) Rs. 15,20,688/ Cost Incurred on Additional/ Extra Items as on date not| N.A. included in the Estimated Cost (ANNEXUREA) OLA Yours Faithfully, E RA Rog. No. 174/93 Signature of Engineer B.EC) rangaded. AMOL KSHIRSAGAR (License No. E 174/93) *Notes 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/ Completion Certificate. 2.()Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3. The estimated cost includes alllabour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive.