R.B & ASSOCIATES B.V.RAUT PLANNER DISGINER ENGINEERS Consulting Engineer D.A.DESHPANDE Consulting Engineer OFFICE :Plot No.12/B, Gut No.64, New ST Colony Near N2 Cidco Aurnagabad FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 06/07/2021 To, Umesh Bhujangappa walekar Plot No.95, Gut No.219, Aaghur, Tal Vaijapur, Dist. Aurangabad 423701 Subject: Certificate of Percentage of Completion of Construction Work of Building of the Project “SHUBHANKUR” Registered at Maha Rera P51500027613 situated on Plot No.95,GUT NO 219, Maouje Aaghur Tal.Vaijapur, Dist.AURANGABAD 423701 demarcated by its boundaries (latitude and longitude of the end points) To the North – Site Margin & Part of Gut No 219 To the South – Site Margin & 12 m Road part of Gut no.219 To the East – Site Margin & 6m Road Part of Gut No 219 To the West – Site Margin & Part of Gut No 219 of Division Aurangabad Plot No.95,GUT NO 219, Maouje Aaghur Tal.Vaijapur, Dist.AURANGABAD 423701 admeasuring 2579.86 Sq.mts for comprising 60 Row Houses being developed by Promoter Umesh Bhujangappa Walekar Sir, I B. V. RAUT Proprietor of R. B. & ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the of the Project comprising 60 Row Houses, of the Project “SHUBHANKUR”, PLOT No.95,GUT NO 219, Maouje Aaghur Tal.Vaijapur, Dist.AURANGABAD 423701 admeasuring 2579.86 Sq.mts for comprising 60 Row Houses are being developed by Promoter Umesh Bhujangappa Walekar 1. Following technical professionals are appointed by Owner / Promoter:- (i) B.V. RAUT as Architect; (ii) D.A. DESHPANDE as Structural Consultant (iii) Anna Bangal as Site contactor Based on Site Inspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for comprising Building of the Real Estate Project – “SHUBHANKUR”, as registered vide number Registered at P51500027613 under Maha RERA is as per table “A” herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A SHUBHANKUR BUILDING A S. No. Tasks / Activity Percentage of Work 1 Excavation 6.66% 2 X Number of Basement(s) and Plinth 6.66% 3 X Number of Podiums NA 4 Stilt Floor NA 6.66,% 5 X number of Slabs of Super Structure Internal walls, Internal Plaster, Floorings within Flats / 6 Premises, Doors and Windows to each of the Flat / Premise 6.66% Sanitary Fittings within the Flat / Premises, Electrical 7 Fittings with the Flat / Premises 6.66% Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- 6.66% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building / 6.66% Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, 10 Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the work done for the 11 entire Building / Wing 6.66% Table A SHUBHANKUR BUILDING B S. No. Tasks / Activity Percentage of Work 1 Excavation 00% 2 X Number of Basement(s) and Plinth 00% 3 X Number of Podiums NA 4 Stilt Floor NA 5 X number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats / 6 Premises, Doors and Windows to each of the Flat / Premise 0% Sanitary Fittings within the Flat / Premises, Electrical 7 Fittings with the Flat / Premises 0% Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- 0% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building / 0% Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, 10 Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the work done for the 11 entire Building / Wing 0% Table A SHUBHANKUR BUILDING C S. No. Tasks / Activity Percentage of Work 1 Excavation 0% 2 X Number of Basement(s) and Plinth 0% 3 X Number of Podiums NA 4 Stilt Floor NA 5 X number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats / 6 Premises, Doors and Windows to each of the Flat / Premise 0% Sanitary Fittings within the Flat / Premises, Electrical 7 Fittings with the Flat / Premises 0% Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- 0% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building / 0% Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, 10 Finishing to entrance lobby/s, plinth protection, paving of 0% area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the work done for the 11 entire Building / Wing 0% Table A SHUBHANKUR, BUILDING D S. No. Tasks / Activity Percentage of Work 1 Excavation 0% 2 X Number of Basement(s) and Plinth 0% 3 X Number of Podiums NA 4 Stilt Floor NA 5 X number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats / 6 Premises, Doors and Windows to each of the Flat / Premise 00% Sanitary Fittings within the Flat / Premises, Electrical 7 Fittings with the Flat / Premises 0% Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- 0% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building / 0% Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, 10 Finishing to entrance lobby/s, plinth protection, paving of 0% area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the work done for the 11 entire Building / Wing 0% TABLE-B Internal & External Development Works in Respect of the entire Registered Phase SHUBHANKUR Common Areas and Facilities, Amenities Proposed Percentage of Details Completion Internal Roads and Footpath Yes 90% Work in Progress Water Supply Yes 50% From Common in Plot Premises Sewerage (Chamber, Line, Septic, Tank, STP) Yes 90% Work in Progress Storm Water Drains NA Landscaping & Tree Planting Yes 100% Tree Planting around site. Street Lighting Yes 100% Work completed Community Buildings NA Treatment and Disposal of Sewage and Sullage NA Water Solid Waste Management and Disposal NA Water Conversation, Rain Water Harvesting Yes 0% Not Yet Started Energy Management NA Fire Protection and Fire Safety Requirements NA Electrical Meter Room, Sub-station, Receiving Yes 0% Not Yet Started Station Aggregate Area of Recreational Open Space NA Open Parking Yes 0% Not Yet Started Overall Percentage of Completion of the work done for the entire Building / Wing 15.00% Yours Faithfully