ffi @Amol KSnrrsagar Architectural Planner, Consulting Engineer & Annexure - B Valuer FORM - 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Dale: 08-04-2024 To, SAKAMBARI BUILDCON, 11, A-WING, 1't FLOOR, NARAYAN PLAZA, CANNAUGHT PLACE, CIDCO, AURANGABAD Subject: Certificate of Cost lncurred for Development of SARA VATIKA having MahaRERA Registration Number P51500025439 being devetoped by SAKAMBARI BUILDCON. (ForJan to Mar2024 QTR) I/ We Er. AMOL KSHIRSAGAR have undertaken assignment of Certifying Estimated Cost for SARA VATIKA having MahaRERA Regiskation Number P51500025439 being developed by SAKAMBARI BUILDCON. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made availabte to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Quantity Surveyof appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. estimate Total Estimated Cost of completion of the aforesaid Project mentioned reference at Rs. 6,27,91,8811 (Total of Table A & B) at the time of Registration. The Total Cost of Project is with reference to the Civil, MEP & Allied Works com on ofthe apartments & proportionate completion of internal & external works, as per the ns mentioned in the Agreement of Sale & for the purpose of obtaining gertificate / Completion Certificate for the Building(s) / Wing(s) I Layoul I Plotted from the ASST. DIRECTOR TOWN PLANNI Flat No.4, Plot No. 102, Nathprangan,Garkheda, Ghhatrapati Sambhajinagar Mob. : 09960669921 being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost incurred till date is calculates to Rs. 6,27,9i,881/- (Total of rable A & B). The Amount of E.clma!p..d..._c..es.L.!nsu[ed..ie..Bleqlat_e..C...9n..the...b.as.i9._.9j..inp.r]l m.derlels./.sery.!ees.u.s.e..d_.&.sni!._c..o..s.!..eI.th.ese.items. 5. The Balance cost of compretion of the civil, MEp & Aflied works for compretion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of sare, of the aforesaid project is estimated at Rs. NIU- (Total of Tabte A & B). b_ I certify that the cost of civil, MEp & Allied work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A&B below: TABLE - A Building / Wing / Layout / plotted Development For Buildlng 81 & 82 S. Particulars Amount (in Rs.) No. 1. Total Estimated Cost of Building/ Wing / Layout / Rs. 4,93,83,675r Plotted Development as on date of Reoistraiion is 2. Cost incurred as on date of Certificate Rs. 4,93,83,675^ 31 March2024 3. Work Done in Percentage 1as eercentage ot 100o/o Estimqted Cost) 4. Balance Cost to be incurred * ((based on Rs. NIL/- Estimated Cost) Cost incurred on nOaitional I gxtra ttems not included in the Estimated Cost (Table-C) TABLE - B Internal & Externa.l Development Works For Building B1 & 82 S. Particulars Amount (in Rs.) No. t. Total Estimated Cost ot lnternal & Exfernal Rs. 1,34,08,206/- Development Works including amenities & facilities - in the Layout as on date of Registration ls 2. Cost incurred as on date of Cerlificate Rs. 1,34,08,2061 31 March 2024 J. Work Done in cercentagel-JFercentage of 100% Estimated Cost) 4. Balance Cost to be incurred .- (based on Rs. NIL/- Estinlated Cost) 5. Cost incurred on Additional / EXra lterns not included in the Estimated Cost (Tabte-C) t-.. 'o' Nffid ,, io l> * IPnronY Yours faithfull Er. AMOL Signature & Name (tN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number Reg No - E t 174 lgs Agreed & Accepted by: Signature of Pro\hoter Name: SAMMBART BUTLDCON Date: 08-04-2024 Note: 1. The scope of work is to complete Registered Real Estate project as pe1 drawings approved from time to time as per specrfications mentioned in the Agieement io Sale. (") Quantity survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who,s Certificate ofhuan'ty Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the piace marked (.) & in case quantity are being carcurated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). (..) Balance cost to be incurred (4) may vary from difference between Total Estimated cost (1) & actuar cost incurred (2) due to deviation quantity in required / escalation of cost etc. As this is an Estimated cost any deviation quantity required for the Development of Real Estate project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / quarifications. Exampre: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the origina,l Estimate of Total Cost) ffi