S = = Amol Kshirsagar Architectural Planner, ' Consulting Engineer & Annexure - B Valuer FORM - 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date.05-04-2023 To, SAKAMBARI BUILDCON, 11, A-WNG, ,lil FLooR, NARAYAN PLAZA, CANNAUGHT PLACE, CIDCO, AURANGABAD Subject: Certificate of Cost lncurred for Development of SARA VATIKA having MahaRERA Registration Number P51500025439 being developed by SAKAMBARI BUILDCON. (For Jan to Mar 2023 QTR) I /We Er. AMOL KSHIRSAGAR have undertaken assignment of Certifying Estimated Cost for SARA VATIKA having MahaRERA Registration Number P51500025439 being developed by SAKAMBARI BUILDCON. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Quantity Surveyor" appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. estimate Total Estimated Cost of completion of the aforesaid Project mentioned reference at Rs. 6,27,91,88'l/. (Total of Table A & B) at the time of Registration. Total Cost of Project is with reference to the Civil, MEP & Allied Works com of the apartments & proportionate completion of internal & external works, as per the mentioned in the Agreement of Sale & for the purpose of obtaining Occupati pertificate / Completion Certificate for the Building(s) / Wing(s) I Layoul I Plotted from the ASST. DIRECTOR TOWN PLANNING - AURANGABAD w'ffi Flat No.4, Plot No. 102, Nathprangan,Garkheda, Chhatrapati Sambhajinagar Mob. : 0996066992't being the Pranning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost incuired til date is carcurates to Rs. 6,27,91,8g1/- (Totar of rabre A & B). The Amount of Es.Imeted..eesl..lnsu.r.red..!s..ge!9!.llat_e.C...q,n..the..8.?.9iq...-oj..input m.?.tgriel s,/. gerv. iges..rt.9e. d..&. sru!..s_o..sL.qI.these. items. 5. The Balance cost of compretion of the civir, MEp & Afiied works for compretion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of sare, of the aforesaid project is esiimated at Rs. NIU- (Total of Tabte A & B). b I certify that the cost of civir, MEp & A ied work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as compreted on the date of this certificate is as given in Tabre A & B below: TABLE - A Building / Wing / Layout / plotted Development For Building 81 & 82 Total Estimated c@ Rs. 4,93,83,675^ Plotted Development as on date of Reoistraiion is Cost incurred as on Oate ot Certiflcate Rs. 4,93,83,675t- 31 March 2023 Work Done in PercEntage lasFErcEntEge of Estimated Cost) Balance Cost to Ue incurreO "11Uasea on Estimated Cost) Cost incurred on Additional LExtra ltems not included in the Estimated Cost (Table-C TABLE - B Internal & External Development Works For Building B1 & 82 S Particulars Amount (in Rs.) No. 1. Total Estimated Cost of lnternalE Extefial Rs. 1,34,08,206/- Development Works including amenities & facilities in the Layout as on date of Regishation is 2. Cost incurred as on date of Certificaie - Rs. 1,34,08,2061 31 March 2023 J. Work Done in Percentage Gs perc;tage of 100o/o Estimated Cost) 4. Balance Cost to Oe incurreO -. 11f.asea on Rs. NIL/- Estimated Cost) 5. Cost incurred on Additional / Extri ttems not included in the Estimated Cost (Table-C) \\ \h\2\ Yours faith "w ET. AMOL KSHIRSAGAR Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Local Authority License Number Reg No - E I 114 t 93 Agreed & Accepted by: Signature of Frolr\oter Name: SAKAMBART BUTLDCON Date: 05-04-2023 Note: 1. The scope of work is to complete Registered Real Estate project as per drawings approved from time to time as per specifications mentioned in the Agre'ement io Sale. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who,s Certificate of euantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the piace marked (*) & in case quantity are being carcurated by office of Engineer, the name of person rn the office of Engineer, who is responsibre for the quantity carcurated shourd be mentioned at the place marked (.). J- ("*) Balance cost to be incurred (4) may vary from difference between Totar Estimated cost (1) & actuar cost incurred (2) due to deviatron in quantity required / escalation of cost etc. As this is an Estimated cost any deviation quantity required for the Development of Rear Estate project wirr result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / quarifications. Exampre: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Aaaitionit I Oetetea tterns Amount (in Rs.) 1. 2. '/ 4