I @ Amol Kshirsagrt!r Architectural Planne r, Consulting Engineer'& Annexure A Valuer FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 08-01-2024 To, SAKAMBARI BUILDCON, 11, A-wtNG, 't"t FLooR, NARAYAN PLAZA, CANNAUGHT PLACE, CIDCO, AURANGABAD subject: certificate of Percentage of completion of construction work of SARA VATIKA having MahaRERA Registration Number P51500025439 being developed by SAKAMBARI BUILDCON. (ForOctto Dec2023 QTR) Sir, I / We Er. AMOL KSHIRSAGAR has undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of completion of construction work of SARA VATIKA having MahaRERA Registration Number P51500025439 being developed by SAKAMBARI BUILDCON. Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this certificate, the Percentage of work Done for each of the BuildingMing of the Real Estate Project under MahaRERA is as per Table-A herein pelow. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A / Buildinq / Winq Number For Building 81 S.\ Tasks / Activity Percentage of Actual Work tlo.\ Done , (As on date of the Certificate) (3) (1) \ (2) 1 EfeavatlorL 100% 100% X nhber of Basement(s) and Plinth J X;uNer of Pod'rums 4 stilt F Na l OOo/o X numbe\of Slabs of Super StructlLrq 100% 6 lnternal lnternal Plaster, Floorings within 100o/o Flats/P Doors and Windows to each of the FlaUPremises Flat No.4, Plot No. 102, Nathprangan,Garkheda, Chhatrapati Sambhajinagar ( (\$1 /L ,,# Mob.: lob. : 09960669921 7 Sanitary Fittings within the FlaUPremises, Electrical 100o/o Fittings within the FlaUPremises o Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, 100o/o completion of terraces with waterproofing of the BuildingA/Ving 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-A Buildi Number For Bui 82 s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) 2) (3) 1 Excavation 10Oo/o . 2 X number of Basement(s) and Plinth 100o/o J X number of Podiums 4 Stilt Floor 100% A X number of Slabs of Super Structure 100% 6 lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical lOOo/o Fittinqs within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting Staircases and Lifts, Overhead and Underoround Water Tanks. I The external plumbing and external plaster, elevation, 100o/o completion of terraces with waterproofing of the BuildingAA/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate EEN L o\ r! W a x ,,\.,': {/ TABLE-B Common Areas (lnternal & External Works) For Buildinq 81 & 82 S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4). (s) 1. lnternal Roads & Footpaths : YES 10Oo/o Trimix Roads 2. Water Conservation, Rain water YES 100yo As Per Consultant Harvesting : Energy management : YES 1O0o/o Led Fittings ln Common Areas 4. Fire Proteclion And Fire Safety NO N.A. Requirements: Electrical Meter Room, Sub- YES 100% As Per Consultant Station, Receivinq Station : b. Aggregate area of recreational NO N.A. Open Space : 7. Open Parking : NO N.A. a Water Supply : YES 1O0o/o Bore-Wells o Sewerage (Chamber, Lines, YES 100o/o As Per Consultant Septic Tank , STP) : 10. Storm Water Drains : YES 100o/o As Per Consultant 11. Landscapinq & Tree Plahtino : YES 100% As Per Consultant 12. Street Liqhtinq : YES 100o/o As Per Consultant lJ. Community Buildinas : NO N,A, 14. Others (Option to Add more) NO N.A. :::4, Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect License Number Reg No - E I 174 193 Agreed & Accepted by: signature olElM.,ot",. Name: SAKAMBARI BUILDCON Date: 08-01-2024 ffi