FORM I IRegulation 3] ARCHITECTS CERTIFICATE (To be submitted at the time ofRegistration ofongoing Project and for withdrawal o Money from Designated Accounr Building/Wing wise) Date: 20.03.2020 To The Prop. Amruta Kulkarni Plot No. 5l - 52, Kalpataru Apartment, Aditya Nagar, Sut Gimi Chowk Aurangabad. Maharashtra. Subject:CertilicateofPercentageofCompletionofConstructionWorkof"MAHALAXMI SAUBHAGYA''Building,softheProject[RERAReghtrationNumber|situated0nthePlot bearing Satara Plot no.- 83, Gut no.- 168, Satara Parisar' demarcated by its boundaries (latitudeandlongitudeoftheendpoints)09'00M'W'RoadtotheNorth'Plotn0'-82tothe South,Plotno..84totheEast,09.00M.w.RosdtothewestofDivisionAurangabadvillage satsratrlukaAurangabadDistrictAurrngabadPlN43l00ladmeasuringPlotArea=375.fi) sq.mts. area being developert by Prop' Amruta Kulkarni Sir, IDhananjayB.DoifodehaveundertakenassignmentasArchitectofcertifuingPercentageof of the Project, situated on the plot completion of construction work of the of the Building / Phase Aurangabad village satara taluka bearing Satara Gut no.-168(P) , Final Plot no- 83. of Division Area = 3?5'00 sq'mh' area being iurangabart District Aurangabad PIN 431001 admeasuring Plot developed by Prop.Amruta Kulkarni' / Promoter :' i. Follorving teqhnical professionals are appointed by Owner l1t; Shri. Dtra.ninlay B. Doifode. as L.S. / Architect; il (ii) Shri. Abhay Pirtil as Structural Consultant' BasedonSitelnspecti0n,withrespecttoeacholtheBuilding/WingoftheaforesaidRealEstat the Percentage of Work done for each o the Project, I certiry that as on the date of this certificate, building/wing of the Real Estate Project as registered vide number .-'under RERA isaspertab[gAhereinbblow.Thepercentageoftheworkexecutedwithrespecttoeachofthemajor activityoftheBuildingandOverallPercentageofworkdonewithrespecttoeachBuilding/wingis detailed in the Table B. i Table A (MAHALAXMI SAUBHAGYA) Sr. No Tasls /Activity Percentage of work done I Excavation 100 % 2 Plinth 100 % 3 0l Stilt Floor 100 % 4 04 number ofSlabs of Super Structure t0% 5 Intemal walls, Internal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 00 Electrical Fittings whhin the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each 00% Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The extemalplumbing and extemal plaster, 00 elevation, completion of tenaces with waterproofing of the Building/Wing, l0 In$allation of lifts, water pumps, Fire Fighting Fittings 00 tnd Equipment as per CFO NOC, Electrical fittings to i Common Areas, electro, mechanical equipment, bompliance io conditions ofenvironment /CRZ NOC, i Finishing to ennance lobby/s, plinth protection, Paving of areas appurtenant to BuildingAl/ing, Compound Wall and allother requirements as may be required to Obtain Occupatibn /Completion Certifi cate TABLE.B Intemal & External Development Works in Respect ofthe entire Registered Phase s.no Common arqas and Facilities, Proposed Percentage of Details Amenities (YesNo) Work done 1 Intemal Roads & Foothpalhs N.A N.A. N,A ,| Water Supply t(m Yo BOREWELL 3 Sewarage (chamber, YES 00% Septic Tank. lines, Septic Tank , STP) 4 Storm Water Drains N.A N.A. N.A. 5 Landscaping & Tree N.A N.A. N.A. Planting 6 Sneet Lighting N.A .N.A. N.A. 7 Community Buildings N,A N,A. N,A. 8 Treatment and disposal N.A N.A. N.A. ofsewage and sullage water 9 Solid Waste management N.A. N.A N.A & Disposal l0 Rainwater harvesting YES 00Yo Borewell ll. Energy nlanagement N.A, N.A. N.A. t2 Fiie protqction and fire N.A. N.A. N.A. safety requirements 13. Electricil meler room, YES 00% METER 1,,11 14. others 1 oliion to Add more,l r1 rs Faithfully i AR. DHANANJAY B. DOIFODE ARC ITECT (License Nd- CA,/20 I 3/60839) Ir OtrnaniaY B. Doitodc' t-^RCH' .ARCH cA,l0t 3r 608r9 t0tn ral'Plot no' t&l 0rlrnrn Col onv Aut rngrbr{ I rl :1 ., i.: