PRASAD APHALE M.E.(Struct ), MIE,MISSE Block No:02, Varad Complex, Bijli Nagar, Osmanpura, Aurangabad 431005 (M.S.) Cell: 9822531 290 Mail: aphale.prasad@gmail.com FORM-21. See Regulation 31 ENGINEER'S CERTIFICATE To NILESH SURESH KSHATRIYA Subject: Certificate of Cost [incurred for Development of SAI SANKUL PHASE 3Construction of Flats Situated on Plot bearing 43, GUT NO INAKSHATRA WADI, AURANGABAD having MahaRERA Registration Number PS1500027401 being developed by NILESH SURESH KASHATRIYA Sir /we undertaken assignment of certifying Estimated Cost for having MahRERA Registration Number PS150002740 1 (only applicable after project Registration )being developed by NILESH SURESH KASHATRIYA 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in attachment of sale. Our estimated costcalculations are based on the available made available to us for the project under reference by the Developer /Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity surveyor* appointed by Developer Engineer. the assumption to the cost of material. labour and other inputs mad by developer. and the site inspection carried out by us to ascertain /confirm the above analysis given tO us. 3.We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs 9580123/- (Total of Table Aand B) at the time of Registration. The estimated Total Cost of Project is with references to the Civil, MUP and Allied works required for completion of the apartments and Proportionate complication of internal external works. As per specifications mentioned in agreement of sale and For the purpose of obtaining occupation certificate /completion certificate for the Building(s) / Wing(s) r Layout / Plotted Development from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4, The Estimated Cost Incurred till date is calculated at Rs. 9580123 (Total of Table Aand B) the amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of this items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and Completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs. O/- (Total of Table Aand B) 6.l certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate and internal &Extremal works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table Aand B) below: PRASAD APHALE B.E. (Civil), M.E. (Struct.) Regd. No.: DDMCB/RI2021/APL/01035 TABLE-A 12 Flats called as SAI NAKSHATRA(To be prepared separately for each Development of the Real Estate Project) building /Wing / layout /Plotted Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building/Wing / Layout / Plotted 9580123/ Development as on date of Registration is 2 Cost increed as on date of certificate 9580123/ 3 Work done in Percentage (as Percentage of the estimated cost) 100% Balance Cost to be incurred** (Based on Estimated Cost) 0 5 Cost Incurred on Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-B Internal & External Development Works in Respect of the Registered Phase Sr Particulars Amount (in Rs.) No 1 Total Estimated Cost of the Internal and External Development 9580123 Works including amenities and Facilities in 2 Cost incurred as on date of certificate 9580123 3 Work done in Percentage (as Percentage of the estimatedcost) 100 4 Balance Cost to be incurred** (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra items not included in the Estimated Cost (Table -C) Yours Faithfully, PRASAD B.E. 4LE Regd. No.: (Cvi), #.É. (Struct.) DDtiCBIRI2021/APLIO0 1035 Agreed and Accepted by: NILESH SURESH KSHATRIYA PROPRIETOR Name: NILESH SURESH KSHATRIYA Date: Note: 1The scope of work is tocomplete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (-)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the