SANTOSH ADHAV & ASSOCIATES Design Become Sighature Office Add.: 69, Jay Tower, Padampura Signal, Station Road, Aurangabad - 05 (India). | Email: ar.adhav@yahoo.com FORM T IseeRegulation 31 (Tobe submitted atthe time ofARCHITECT'S CERTIFICATE Registrationof Ongoing Projectand for withdrawalof Money To fromDesignatedAccount) NILESH SURESH KSHATRIYA DATE Subject: Certificate of Percentage Completion of Construction Work of Construction of Flats Situated on Plot bearing 43, GUT ofSAI SANKUL PHASE 3 MahaRERA NO1NAKSHATRA WADI, Sir, RegistrationNumberP51500027401 being developed by NILESH AURANGABADhavi SURESH KASHATRIYA ng V Wehave undertaken assignment as Architect of certifying Construction Work of having NILESH SURESH KSHATRIYA MahaRERA Registration Percentage of Completion of NumberP51500027401. being developed by Based on Site certify that as inspection. with respect to Layout / each of on the date of theoft thiscertificate, the Percentage building/Wing of the RealEstate Project under heaforesai of Work dReal doneEst a forte Project. I eachofthe percentageofthe work executed with respect to MahaRERA is as per Table A herein Table B each of the activity of below. the entire phase is detailed in TABLE-A Total Number Flats 12 (To be Sr prepared separately for each Layout No Tasks/Activity building/Wing of The Project) Percentage of Actual Work (1) (2) Done (As on date of this 1 Excavation Certificate) (3) 2 Basement's (if any) 100 3 Podiums (if any) 100 4. Plinth NA 5. Stilt Floor 100 6 Slabs of Super Structure 100 7 Internal walls, Internal Plaster, 100 windows within Flats/Premises Floorings, I) doors and 100 Sanitary Fittings within the 9 Staircases. lifts' Wells andFlat/Premises 100 Lobbies at each Floor level 100 10 Overhead and Underground Water Tanks External plumbing and external plaster, completion of terraces with elevation, 100 Building/wing. waterproofing of the Ar. Sartosh Adhav Architect Reg. No. CAI2005/37050 11 Installation of Lifts. water pumps, Fire Fitting Fittings and 100 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC.. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (3) Work (5) (2) Done (As on date of the Certificate) (4) 1 Internal Roads &Footpaths NO NA NA 2. Water Supply YES 0100 BOREWELL PROVIDED 3. Sewerage (Chamber, lines, Septic Tank, STP). YES 100 WORK DONE 4. Storm Water Drains NO 0 NA 5. Landscaping &Tree Planting NO NA NA Street Lighting NO NA NA 7. Community Buildings NO NA NA 8 Treatment and disposal of sewage and sullage NO NA NA water. Solid Waste management & Disposal NO NA NA 10 Water conservation/Rain water harvesting YES 100 WORK DONE 11 Energy management. NO NA NA 12 fire protection and lire Safety requirements NO NA NA 13 Electrical meter room, sub-station, receiving YES 100 WORK DONE station. 14 Others (Option to Add more) NO NA NA Your's Faithfully, Signature &Name (N BLOCK LETTERS) of L.S/ Architect Ar. Santosh AiavV (License No. ......) Architect Reg. No. CAI2005/37050 Agreed and Accepted by: Signature of Promoter Name: Date: