DEEPAK V. KULKARNI Architect A.I.I.A. M.C.A. Interior Designer Developers OFFICE 2, Shree Plaza, 14, Deogiri Colony, Kranti Chowk Police Station road, Samarta Nagar Chowk, Aurangabad-431 001 Ph.(:0) 2339293/ Mob. 9822375295 Regd. No. CA/87/10707 Ref FORM 1 Date: seeRegulation 31 ARCHITECT'S CERTIFICATE (To be submitted atthe time of Registrationof Ongoing Projectand for withdrawalof Money fromDesignatedAccount) DATE 30.06.22 To The DVK cONSTRUCTION 2. SHREE PLAZA, DEOGIRI COLONY, AURANGABAD. Subject: Certificate of Percentage of Completion of Construction Work of having MahaRERA Registration Number P51500027497 (only Applicable after Project Registration) being developed by DVK CONSTRUCTION Sir, / We Deepak V. Kulkarni have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of having MahaRERA Registration Number PS1500027497 (Only Applicable after project Registration. being developed by [Promoters Name] Based on Site inspection. with respect to Layout / each of the of the aforesaid RealEstate Project. certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the RealEstateProject under MahaRERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout/ Building Wing Number . (To be prepared separately for each Layout building/Wing of The Project) Sr Tasks/ Activity Percentage of Actual Work No (2) Done (1) (As on date of this Certificate) Excavation (3) 1 100% 2. Basement's (if any) 100% 3. Podiums (if any) NA 4. Plinth 100% 5 Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings, 1) doors and 85% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases. lifts' Wells and Lobbies at each Floor level 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 80% completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (2) (3) Work (5) Done (As on date of the Certificate) (4) Internal Roads& Footpaths NA 2 Water Supply 0% B. Sewerage (Chamber, lines, Septic Tank, STP). 0% 4. Storm Water Drains 0% Landscaping & Tree Planting 0% 6. Street Lighting 0% Community Buildings NA 8 Treatment and disposal of sewage and sullage water. NA 9 Solid Waste management & Disposal NA 10 Water conservation/ Rain water harvesting 0% 11 Energy management. NA 12 fire protection and lire Safety requirements NA 13 Electrical meter room, sub-station,receivingstation. NA 14 Others (Option to Add more) NA Your's Faitholy, DEEPAK V. KULKARNI Architect &Approved Valuer DEEPAK V. KULRARNI 2, Shree Plaza, 14, Deogiri Colony Kranti Chowk, Pol. Stn. Rd,aurangabad Architect Regd No. CA/87/10707, F - 15058 (License No. . CA/8710707) Agreedand Acceptee by Name: DVK GONSTR Date:30.06.2022 TRUC PN CGABA TIONS URANG