SACHIN H SHIRSAT 24, Shambhu Xlahadev \Iandir, Sahakar Nagar,.\urangabad. NIS 431005 REGULATIONS FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE Date: 10/10/2021 ,IO Abhay ll Shirsat and Sandeep FI Shirsat (lut No 55, Plot no 3,4 and 6 Itkheda , Aurangabad. Maharashtra Subject: Certificate ofCost lncurred for Development ofolAnmol Residency Prolect, A and B rypes oi Buildings the project srtuated on the Plot No. 3,,1 and 6 Gut No. 55 Part Itkhcda, Tq Dist Aurangabad, dcmarcated by its boundaries East : Plot No. 5 and 7, \Vest: Plot No. 2, South: 7.5 NitL \\'ide , North: 15 lv{tr Wide, Itkheda, o[ Aurangabad Dntsion village Itkheda, Auranagad 'l'aluka & District,\urangabd PIN. .131002 admeasuring 877.31 sq.mts. PIot Area bcing developcd br,Abhav FI Shirsat and Sandeep FI Shirsat, RERA Registration No. P51500025916 Sir L I Mr. Sachin Shirsat have undertaken assignment ol cerlifiing Estimated Cost for the Subject Real Estate Proiect registered under RERA, Anmol Residency Project, A and B rypes oI Buildings the prolect situatcd on the PIot No. 3,,1 and 6 Gut No.55 Part Itkheda, Tq Dist ;\uraogabad, dcmarcated bv its boundaries F,ast : PIot No.5 and 7, \{icst: Plot No.2, South: 7.5 Mt \{iidc, North: 15 N{tr \1ide, Itkheda, of Aurangabad Division village ltkheda, Auranagad Taluka & Drstrict Aurangabd PIN. 431002 admeasuring 877.31 sq,mts. Plot Area being devcloped by Abhay II ShrLsat and Sandeep ll Shirsat, RERA Registration No. P51500025916 2. |oliorvrng technical professionals are appointed bv Owner / Promoter:- i) NI/s Sakhare Associates i as L.S. / Architect : ii) iUr, Rnvindra Bansode Consultants as Structural Consultant, u) I\lr. Sachin Shirsat As a Valuer and Site F,ngineer. 2. I have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certiflcate, ol the Civil, MEP and Allied works, of the Building(s) ol the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by SACHIN H SHIRSAT 24, Shambhr.r l\lahadev Ilandir, Sahakar Nagar, .\umngAbid. NIS 431005 the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by 2,96,88.750=00 quantity Surveyor appointed by Developer,Engineer. and the assumption of the cost of material, labour and other inputs made by developel, and the site inspection calried out by us. 3. We estimare Total Estimated Cost of completion ofthe building(s) of the aforesaid project under reference as Rs. 2,96,88.750=00 The estimated Total Cost ol project is with reference to the Civil, MEP and allied works required to be completed fbr the purpose ol obtaining occupation certificate / completion certificate lor the building($ from the Aurangabad Municipal Corporation Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date 3Oth September 2021 is calculated at Rs. 1,48,44,375=00. The amount ol Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of completion of the civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion 'Certificate lrom Town Planning Aurangabad Municipal Corporation Aurangabad is estimated Rs. 1,48'44,375=00 6. I certify that the Cost olthe Civil, MEP and allied work for the aforesaid Project as completed on the date ol this certificate is as given in Table A TABLE A Total Projcct Cost For Anmol Residency (Building A and B) Sr. No. Particu la rs Amounts l. Total Estimated cost ofthe buildings / wing as Rs. 2,96,88,750=00 on date of Regi$ration is 2. Cost lncurred as on 30'h September 2021 Rs. 1,48,44,375=00 (based on the Estimated cost) 3. Work done in Percentage (as Percentage ol the estimated cost) 50% 4. Balance Cost to be Incurred (Based on Estimated Cost) 5. Cost lncurred on Additional / Extra Items as NIL on not included in the Estimated Cost SACHIN H SHIRSAT24, Shambhu Mahadev Nlandir, Sahakar Nagar, Auraogabad. NIS 431005 \','un l${ffif6 H. Shircat unicip:l hEani.d Con: ull!:r! Engh,!dt' \ r3 n.rlurc nb&.r.€ut+psAeg/2?11 .. 24, Shrmbr tllahaJ.v l{eg!r, l. : (. r reah{kr?.fargar, AurangCbad, * Note 'l'he 1. scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to 0btain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office ol Engineer or can be done by an independent Quantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. In case ol indcpendent quantity surveyor being appointed by Developer, the name has to be rnentioned at the place marked (*) and in case quantity are being calculated by olfice of Engineer, the name of the person in the olfice of Engineer, who is responsible for the quantity calculated should be mentioned at the place rnarked (* ). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4, As this is an estimated cost, any deviation in quantity required lbr development ol the Real estate Project will result in amendment olthe cost incuned/to be incurred. 5. All components olwork with specifications are indicative and not exhaustive.